ML20150B560
| ML20150B560 | |
| Person / Time | |
|---|---|
| Site: | Perry |
| Issue date: | 06/23/1988 |
| From: | Wright G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Tadych R CLEVELAND ELECTRIC ILLUMINATING CO. |
| References | |
| NUDOCS 8807120073 | |
| Download: ML20150B560 (1) | |
Text
ggy
~
,a JtlN 2 3 1988 Docket No. 50-440 Docket No. 50-441 Cleveland Electric Illuminating Company Perry Nuclear Power Plant ATTN: Mr. Russell Tadych Training Department 10 Center Road Perry, OH 44081
SUBJECT:
REQUALIFICATION EXAMINATIONS
Dear Mr. Tadych:
After we completed the pilot requalification exam at the Perry facility we received a revised draft of ES601 "Administration of NRC Requalification Program Evalua'. ion".
In order to provide you with the latest, although not necessarily final, procedure and guidance on the requalification process enclosed is a copy of the revised draft.
If you have any questions on the present status of the process please contact me at (312) 790-5695.
Sincerely, original signed By T. M. Burdick Geoffrey C. Wright, Chief Operations Branch
Enclosures:
As stated cc w/ enclosures:
Perry, SRI cc w/o enclosures:
R. Cooper, DRP RIII WrIg)ht/mc'A
\\'
$BR72188EE89.8%o
[I{
V
.i