ML20150B559
| ML20150B559 | |
| Person / Time | |
|---|---|
| Site: | Sequoyah |
| Issue date: | 03/04/1988 |
| From: | Barr K NRC OFFICE OF SPECIAL PROJECTS |
| To: | White S TENNESSEE VALLEY AUTHORITY |
| References | |
| NUDOCS 8803170052 | |
| Download: ML20150B559 (1) | |
See also: IR 05000327/1987066
Text
_ _ _ _ _ _ _ _
gg[y
MAR 0 41988
Tennessee Valley Authority
ATTN: Mr. S. A. White
Manager of Nuclear Power
6N 38A Lookout Place
1101 Market Street
Chattanooga, TN 37402-2801
Gentlemen:
SUBJECT:
REPORT NOS. 50-327/87-66 AND 50-328/87-66
Thank you for your responses of January 21, 1988, and February 17, 1988, to our
Notice of Violation issued on December 21, 1987, concerning system alignment
activities conducted at your Sequoyah facility.
We have evaluated your
responses and found that they meet the requirements of 10 CFR 2.201.
However,
during our subsequent system alignment inspection (327,328/88-06), we found
your corrective actions for Violation 327, 328/87-66-02 to be inadequate.
Violation 327,328/88-06-02 was consequently issued on March 1,19S8, for
inadequate corrective action.
Accordingly, further correspondence on this
matterwillbeinconjunctionwithViolation 327,328/88-06-02.
We appreciate your cooperation in this matter.
Sincerely,
% . M6 h w-
Kenneth P. Barr, Acting Assistant
Director for Inspection Programs
TVAProjectsDivision
Office of Special Projects
cc:
H. L. Abercrombie, Site Director
Sequoyah Nuclear Plant
J. A. Kirkebo Director,
NuclearEngineering
R. L. Gridley, Director
Nuclear Safety and Licensing
M. R. Harding, Site Licensing
Manager
TVA Representative, Rockville Office
bec: 5. D. Ebneter, OSP
S. D. Richardson, OSP
G. G. Zech, OSP
B. D. Liaw, OSP
W. S. Little, OSP/RII
F. R. McCoy, OSP/RII
R. E. Carroll OSP/RII
J. B. Brady, OSP/RII
J. Rutberg, OGC
NRC Resident Inspector
8803170052 880304
ORS Technical Assistant
ADOCK O
37
NRC Document Control Desk
0
State of Tennessee
0
II
os
i
J8Fady
FNcCoy
WLijres
y
tle
2/m88
24
ze/ss
m