ML20150B240
| ML20150B240 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 07/07/1988 |
| From: | Callan L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Andrews R OMAHA PUBLIC POWER DISTRICT |
| Shared Package | |
| ML20150B243 | List: |
| References | |
| NUDOCS 8807110411 | |
| Download: ML20150B240 (2) | |
See also: IR 05000285/1988018
Text
1
,
=.
m.
'
.. -
A
7g
-
In-Reply Refer To:
Docket:
50-285/88-18
'
,
Omaha Public Power District
ATTN:
R. L.'Andrews, Division Manager-
Nuclear Production
1623 Harney Street
Omaha, Nebraska 68102
Gentlemen:
This refers to the inspection conducted by Mr. R. Wise and Dr. J. B. Nicholas
'
of this office during the period June 6-10, 1988, of activities authorized by
NRC Operating License DPR-40 for the Fort Calhoun Station, and to the
discussion of our findings with Mr. W. G. Gates and other members of your staff
at the c.onclusion of the inspection on June 10, 1988.
Areas examined during the inspection included the water chemistry and
radiochemistry programs and water chemistry confirmatory measurements. Within
these areas, the inspection consisted of selective examination of procedures
and representative records, interviews with personnel, and observations by the
NRC inspectors.
The inspection fir. dings are documented in the enclosed
inspection report.
Within the scope of the inspection, no violations or deviations were
identified.
We have also examined actions you have taken with regard to a previously
identified inspection finding.
The status of this item is identified in
paragraph 2 of the enclosed report.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
Original Signed By
L J. Callan
L. J. Callan, Director
Division of Reactor Projects
Enclosure:
(see next page)
FRPS:hC:FRPS:
B
C:RP
C:DRP/B
0:DR
RIV:FRPS:RPB
p[pgr)cholas:deg g88p[2 /f)/88
BNi
RWise
EBaer
urray
TFWesterman
Ca
/88
/
//d/88
7/f/88
6 /88
\\ ( la
'
8807110411 880707
O
DR
ADOCK 050
5
g
.
_
._
_-________
.
.
-
.
.
,
Omaha Public Power District
-2-
Enclosure:
Appendix - NRC Inspection Report
50-285/88-18
'
cc w/ enclosure:
Fort Calhoun Station
ATTN:
W. G. Gates, Manager
P.O. Box 399
Fort Calhoun, Nebraska 68023
Harry H. Voigt, Esq.
LeBoeuf, Lamb, Leiby & MacRae
1333 New Hampshire Avenue, NW
l
Washington, D. C.
20036
Kansas Radiation Control Program Director
Nebraska Radiation Control Program Director
bec to DMB (IE06)
bec distrib. by RIV:
R.D. Martin, RA
- RPSB-DRSS
- Section Chief (DRP/B)
- MIS System
- RIV File
- DRP
- RSTS Operator
- Project Engineer, DRP/B
Lisa Shea, RM/ALF
- T. Bournia, NRR Project Manager
- DRS
G. F. Sanborn, E0
- B. Murray, RP8
- RRI
- J. B. Nicholas, FRPS
- R.
Baer, FRPS
- R. Wise, FRPS
R. L. Bangart
- w/766
L
- _ _--- _-_------------ ---- -----------------