ML20150A823
| ML20150A823 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 03/09/1988 |
| From: | Harrison J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20150A826 | List: |
| References | |
| NUDOCS 8803160060 | |
| Download: ML20150A823 (2) | |
See also: IR 05000456/1988006
Text
- - - - - - - - - -
_ --_-_ -_-__
,
.-
.
.
4
o
..
.
.
MAR 9
1988
Docket No. 50-456
Docket No. 50-457
Commonwealth Edison Company
ATTN: Mr. Cordell Reed
Senior Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by Mr. J. H. Neisler
of this office on February 16-25, 1988, of activities at Braidwood Station,
Units 1 and 2 authorized by NRC Operating Licenses No. NPF-72 and No. NPF-75
and to the discussion of our findings with Mr. D. E. O'Brien and other members
of your staff at the conclusion of the inspection.
The purpose of the
inspcction was to confirm the licensee's implementation of Generic Letter 83-28.
The enclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, and
interviews with personnel.
No violations of NRC requirements were identified during the course of this
inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
-
'J:.i 0 : nd by J. J. lidfrini)
J. J. Harrison, Chief
Engineering Branch
i
Enclosure:
Inspection Reports
i
No.50-456/88006(DRS);
.No. 50-457/88008(DRS)
^
l
8803160060 880309
See Attached Distribution
ADOCK 05000456
O
,
'
geA
e II
-
RIII
RIII
N
cf F
eisi r/crr
inds
rdner
arrison
obc 6 fb
3lI/ff
3%gg
460/ ,/
,-.
.
- - - .
. - -
. . . - . - . - .
.
.
- -
- - . . -
-
r....
.
.
.
-
.
CommonwealthLEdison Company
2
h&AR 9
1988
.
Distribution
cc w/ enclosure:
T. J. Maiman, Vice President,
PWR Operations
D. Butterfield, Nuclear-
Licensing Manager
M. Wallace, Manager of Projects
M. Lohmann, Project Construction
and Startup Superintendent
W. Vahle, Construction
Superintendent ~
R. E. Querio, Station
Manager
P. L. Barnes, Regulatory
DCD/DCB (RIDS)pervisor
Assurance Su
Licensing Fee Management Branch
Resident Inspector, RIII
Braidwood
Resident Inspector, RIII Byron
D. W. Cassel, Jr., Esq.
Richard Hubbard
J. W. McCaffrey, Chief, Public
Utilities Division
H. S. Taylor, Quality Assurance
Division
E. Chan, 0GC
G. Berry, 0GC
Stephen P. Sands, NRR
The Honorable A. Dixon Callihan, ASLB
The Honorable Richard F. Cole, ASLB
The Honorable Ivan W. Smith, ASLB
The Honorable Gary J. Edles, ASLAP
The Honorable Dr. W. Reed Johnson, ASLAP
The Honorable Christine N. Kohl, ASLAP
'
!
,
'
l
l
.
4
e
-r
s--
-+w