ML20150A823

From kanterella
Jump to navigation Jump to search
Forwards Safety Insp Repts 50-456/88-06 & 50-457/88-08 on 880216-25.No Violations Noted
ML20150A823
Person / Time
Site: Braidwood  
Issue date: 03/09/1988
From: Harrison J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20150A826 List:
References
NUDOCS 8803160060
Download: ML20150A823 (2)


See also: IR 05000456/1988006

Text

- - - - - - - - - -

_ --_-_ -_-__

,

.-

.

.

4

o

..

.

.

MAR 9

1988

Docket No. 50-456

Docket No. 50-457

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Senior Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Mr. J. H. Neisler

of this office on February 16-25, 1988, of activities at Braidwood Station,

Units 1 and 2 authorized by NRC Operating Licenses No. NPF-72 and No. NPF-75

and to the discussion of our findings with Mr. D. E. O'Brien and other members

of your staff at the conclusion of the inspection.

The purpose of the

inspcction was to confirm the licensee's implementation of Generic Letter 83-28.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

No violations of NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

-

'J:.i 0 : nd by J. J. lidfrini)

J. J. Harrison, Chief

Engineering Branch

i

Enclosure:

Inspection Reports

i

No.50-456/88006(DRS);

.No. 50-457/88008(DRS)

^

l

8803160060 880309

See Attached Distribution

PDR

ADOCK 05000456

O

DCD

,

'

geA

e II

-

RIII

RIII

N

cf F

eisi r/crr

inds

rdner

arrison

obc 6 fb

3lI/ff

3%gg

460/ ,/

,-.

.

- - - .

. - -

. . . - . - . - .

.

.

- -

- - . . -

-

r....

.

.

.

-

.

CommonwealthLEdison Company

2

h&AR 9

1988

.

Distribution

cc w/ enclosure:

T. J. Maiman, Vice President,

PWR Operations

D. Butterfield, Nuclear-

Licensing Manager

M. Wallace, Manager of Projects

M. Lohmann, Project Construction

and Startup Superintendent

W. Vahle, Construction

Superintendent ~

R. E. Querio, Station

Manager

P. L. Barnes, Regulatory

DCD/DCB (RIDS)pervisor

Assurance Su

Licensing Fee Management Branch

Resident Inspector, RIII

Braidwood

Resident Inspector, RIII Byron

D. W. Cassel, Jr., Esq.

Richard Hubbard

J. W. McCaffrey, Chief, Public

Utilities Division

H. S. Taylor, Quality Assurance

Division

E. Chan, 0GC

G. Berry, 0GC

Stephen P. Sands, NRR

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cole, ASLB

The Honorable Ivan W. Smith, ASLB

The Honorable Gary J. Edles, ASLAP

The Honorable Dr. W. Reed Johnson, ASLAP

The Honorable Christine N. Kohl, ASLAP

'

!

,

'

l

l

.

4

e

-r

s--

-+w