Forwards Special Insp Rept 50-423/88-03 on 880119-29. NRC Scheduling Enforcement Conference to Discuss Event W/ Util in Region 1 Ofc.Licensee Should Be Prepared to Address Listed Items
ML20149N000
Person / Time
Site: Millstone Dominion icon.png
Issue date: 02/22/1988
From: Kane W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20149N001 List:
References
EA-88-061, EA-88-61, NUDOCS 8802290369
Download: ML20149N000 (2)


See also: IR 05000423/1988003

Text

, . _ - - .

.D

%.

FEB 2 21MB

Docket / License: 50-423/NPF-49

fEA 88-61

Northeast Nuclear Energy Company

ATTN: Mr. Edward J. Mroczka

Senior Vice President, Nuclear

Engineering and Operations

, P.O. Box 270

'

Hartford,. Connecticut 06101-0270

Gentlemen:

Subject: Millstone 3 Special Inspection 50-423/88-03 (1/19-29/88)

The enclosed report transmits the findings of the January 19-29, 1988 special in-

spection concerning an overpressure event at low temperature. These findings were

discussed by Mr. W. Raymond of this office with Mr. C. Clement of your staff on

February 18, 1988.

On January 19, 1988, the NRC was informed of the everpressura ' event and your in-

tention to investigate it. On January 22, 1988, our inspector found that the re-

quired overpressure protection systems had not been available to protect against

the transient. This event involved exceeding a Limiting Condition for Operation .

(LCO) and an actual challenge to the unavailable overpressure protection systems.

The operators incorrectly believed that the power operated relief valves (PORVs)

had been operable at their low temperature overpressure setpoint since 9:10 p.m.

on January 16, 1988. This inspection found that no automatic actuation low tem-

perature overpressure protection (LTOP) equipment was available on January 19, 1988

for 16 minutes during which an overpressure condition occurred. Prompt and effec-

tive operator action mitigated the event. 10 CFR 50 Appendix G limits were not

exceeded. Returning one operable Residual Heat Removal (RHR) suction relief valve

to service after 16 minutes provided one low temperature overpressure protection

feature. However, full compliance with the LTOP LC0 was not achieved for four

hours and 40 minutes, when the low temperature overpressure relief setpoint was

made operable for the PORVs. We are concerned with the event itself and the lack

of equipment control and status indication that contributed to it. Accordingly,

we are scheduling an enforcement conference to discuss this event with you in the

NRC Region I Office in King o.f Prussia. We will forward an appropriate notifica-

tion of enforcement action after the enforcement conference.

During the enforcement conference, pleast be prepared to address the following:

-

--

Safety significance.

--

Root cause evaluation.

--

Factors that worsened or mitigated this event.

--

Broader implications of this event.

.

--

Actions to prevent recurrence.

l

8802290369 880222

PDR ADOCK 05000423

'

G PDR

JFICIAL RECORD COPY DL50-423/88-03 - 0001.0.0 \\

,

02/10/88

t

JY

~*

1,l { ?.'

.,

. Northeast Nuclear. Energy Company 2 ff.B 11 M ,

--

Matters listed in Section 8 of the enclosed report.

Thank you for your cooperation.

Sincerely,

'

oricinal EiSne d By:

William F. Kane, Director

Division of Reactor Projects.

Enclosure: NRC Region I Inspection Report 50-423/88-03

cc w/ enc 1:

Mr. W. D. Romberg, Vice President, Nuclear Operations

Mr. S. E. Scace, Station Superintendent

Mr. R. M. Kacich, Manager, Generation Facilities Licensing

Mr. D. O. Nordquist, Director of Quality Services

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Senior Resident Inspector

State of Connecticut

bec w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enclosures)

C. Y. Cheng, NRR

J. Lieberman, OE

F. Miraglia, NRR

J. Goldberg,~0GC

D. Holody, RI

W. Kane, RI

S. Collins, RI

L. Bettenhausen, RI

E. McCabe, RI

S. Pindale, RI, Beaver Valley

W. J. Raymond, SRI, Millstone 1, 2, & 3

R. Ferguson, LPM, NRR

Robert J. Bores, DRSS

-

,

'