ML20149M971

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-271/87-19 on 871019-23 & Notice of Violation
ML20149M971
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 02/22/1988
From: Johnston W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Murphy W
VERMONT YANKEE NUCLEAR POWER CORP.
Shared Package
ML20149M972 List:
References
NUDOCS 8802290332
Download: ML20149M971 (2)


See also: IR 05000271/1987019

Text

c ;

A

-

i . 'i .-

r -. g i

i-

-

FEB 2 21983

Docket No. 50-271 License No. DPR-28

Vermont Yankee Nuclear Power Corporation

ATTN: Mr. Warren P. Murphy

Vice President & Manager of Operations

RD 5, Box 169

Ferry Road

Brattleboro, Vermont 05301

Gentlemen:

Subject: Inspection No. 50-271/87-19

Enclosed is the report of the team inspection conducted by Mr. L. S. Cheung

and other NRC-inspectors and iepresentatives on October 19-23, 1987 et the

Yankee Atomic Electric Company office, Framingham, Massachusetts, and the

Vermont Yankee Corporate office located at Brattleboro, Vermont.

The team's findings were discussed with you at the conclusion of the inspec-

tion. The inspection reviewed your program for establishing and maintaining

the qualification of electric equipment within the scope of 10 CFR 50.49.

Within these areas the inspection consisted of reviews of selected procedures

and environmental qualification packages, interviews with personnel, observa-

tions and a physical walkdown verification of specific electrical equipment.

Based on the results of. this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in the

' Notice of Violation, enclosed herewith as Appendix A. This violation has been

categorized by severity level in accordance with the "General Statement of

Policy and Procedure for NRC Enforcement Actions, 10 CFR Part 2, Appendix C

(Enforcement Policy 1987)." You are required to respond to this letter and in

, preparing your response, you should follow the instructions in Appendix A.

Your cooperation with us in this matter is appreciated.

Sincerely,

8802290332 880222

PDR ADOCK 05000271 0 ** ! * " " ' *"* ? ! !. t

O PDR- 7-  :.: .

William V. Johnston, Acting Director

Division of Reactor Safety

Enclosure: NRC Region 1 Inspe tion Report Number 50-271/87-19

fl@

OFFICIAL RECORD COPY IR VY 87-19 - 0001.0.0

02/16/88

i.

,- .

-  :'

.

-

Vermont Yankee Nuclear 2

Power Corporation

cc w/ enc 1':

J. Gary Weigand, President and Chief Executive Officer

J. P. Pelletier, Plant Manager

John DeVincentis, Vice President,. Yankee Atomic f

R. W. Capstick, Licensing Engineer

Cort Richardson, Vermont Public Interest Research Group, Inc. .,

Gerald Tarrant, Commissioner, Vermont Department of Public Service '

Peter W. - Agnes, Assistant Secretary of Public Safety, .

Commonwealth of Massachusetts

U. Patapovs, NRR/RVIB

0. J. Holody

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of New Hampshire

State of Vermont

Commonwealth of Massachusetts

bec w/ enc 1:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

Section Chief, DRP

H. Eichenholz, SRI, Yankee

V. Rooney, PM, NRR

Robert J. Bores, DRSS

X. Abraham,~ PA0 (9) (SALP Reports Only)

GfC

RI:DRS RI:DRS

h

RI:DRS

Cheung/sh/rw Anderson Durr

'

1/ d /88 .9//6/88 f 1//&/88

0FFICIAL RECORD COPY IR VY 87-19 - 0002.0.0

02/01/88

. __ _.

._ - - - -

- .