Text
/
p
,
p
';
t
FEB 2 51989
Docket No. 50-456
Docket No. 50-457
Commonwealth Edison Company
ATTN: Mr. Cordell Reed
Senior Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the routine safety inspection conducted by Messrs.
T. M. Tongue, T. E. Taylor, and J. M. Jacobson of this office from January 1
through February 13, 1988, of activities at the Braidwood Station, Units 1
and 2, authorized by NRC Operating License Nos. NPF-72 and NPF-75, and to
the discussion of our findings with Mr. E. E. Fitzpatrick and others of your
staff at the conclusion of the inspection.
The anclosed copy of our inspection report identifies areas examined during
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative tecords, observations, and
interviews with personnel.
No violations or NRC requirements were identified during the course of this
inspection.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter and the enclosed inspection report will be placed in the NRC
Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
8802290306 080225
ADOCK 0500
6
0
W. L. Forney, Chief
M
Reactor Projects Branch 1
Enclosure:
Inspection Report
No.50-456/88003(DRP;
No. 50-457/88003(DRP
See Attached Distribution
g
h
RIII
III
RIII
R
ik)
V
I
\\
VanSickle/jp
aco son
Hinds
gorney
2/i9/28
2 /u/rP
I#
)
,_,,,
.
_ _ _ .
_.
--
_ _ .
_
_
_
- ,. . . ,
. . ,
..
i
6.
FEB 2 51980
,
Connonwealth Edison Company
2
Distribution
cc w/ enclosure:
. T. ' J. Maiman,' Vice President,
PWR Operations
D.1Butterfield, Nuclear
Licensing Manager
M. Wallace,-Manager of Projects
D. Shamblin, Project Manager
D. O'Brien, Station Services
Superintendent
W. Vahle, Construction
Superintendent
E. E. Fitzpatrick, Station
Manager
F. L. Barnes, Regulatory
Assurance Su
DCD/DCB (RIDS)pervisor
Licensing Fee Management-Branch
Resident Inspector, RIII
'Braidwood
Resident Inspector, RIII Byron
D. W. Cassel, Jr., Esq.
Richard Hubbard
J. W. McCaffrey, Chief, Public
Utilities Division
'
H. S. Taylor, Quality Assurance
Division
'
E..Chan, OGC
G. Berry, OGC
S. Sands, NRR
'
The Honorable A. Dixon Callihan, ASLB
The Honorable Richard F. Cola, ASLB
The Honorable Ivan W. Smith, ASLB
l
The Honorable Gary J. Edles, ASLAP
L
The Honorable Dr. W. Reed Johnson, ASLAP
l
The Honorable Christine N. Kohl, ASLAP
,
I