Forwards Safety Insp Repts 50-456/88-03 & 50-457/88-03 on 880101-0213.No Violations Noted
ML20149M947
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 02/25/1988
From: Forney W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20149M948 List:
References
NUDOCS 8802290306
Download: ML20149M947 (2)


See also: IR 05000456/1988003

Text

/ ,

p p

';

t

FEB 2 51989

Docket No. 50-456

Docket No. 50-457

Commonwealth Edison Company

ATTN: Mr. Cordell Reed

Senior Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Messrs.

T. M. Tongue, T. E. Taylor, and J. M. Jacobson of this office from January 1

through February 13, 1988, of activities at the Braidwood Station, Units 1

and 2, authorized by NRC Operating License Nos. NPF-72 and NPF-75, and to

the discussion of our findings with Mr. E. E. Fitzpatrick and others of your

staff at the conclusion of the inspection.

The anclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative tecords, observations, and

interviews with personnel.

No violations or NRC requirements were identified during the course of this

inspection.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter and the enclosed inspection report will be placed in the NRC

Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

8802290306 080225 6

PDR ADOCK 0500

0

M W. L. Forney, Chief

Reactor Projects Branch 1

Enclosure: Inspection Report

No.50-456/88003(DRP;

No. 50-457/88003(DRP

See Attached Distribution g

RIII

ik)

III RIII

V

R

I

h \

VanSickle/jp aco son Hinds gorney

2/i9/28 2 /u/rP I#

)

. _ _ _ . _. -- _ _ . _

_ _

,_,,,

,. . . ,

..,

..

i 6.

,

FEB 2 51980

Connonwealth Edison Company 2

Distribution

cc w/ enclosure:

. T. ' J. Maiman,' Vice President,

PWR Operations

D.1Butterfield, Nuclear

Licensing Manager

M. Wallace,-Manager of Projects

D. Shamblin, Project Manager

D. O'Brien, Station Services

Superintendent

W. Vahle, Construction

Superintendent

E. E. Fitzpatrick, Station

Manager

F. L. Barnes, Regulatory

Assurance Su

DCD/DCB (RIDS)pervisor

Licensing Fee Management-Branch

Resident Inspector, RIII

'Braidwood

Resident Inspector, RIII Byron

D. W. Cassel, Jr., Esq.

Richard Hubbard

J. W. McCaffrey, Chief, Public

Utilities Division '

H. S. Taylor, Quality Assurance

Division '

E..Chan, OGC

G. Berry, OGC

'

S. Sands, NRR

The Honorable A. Dixon Callihan, ASLB

The Honorable Richard F. Cola, ASLB

The Honorable Ivan W. Smith, ASLB

l The Honorable Gary J. Edles, ASLAP

L The Honorable Dr. W. Reed Johnson, ASLAP

l The Honorable Christine N. Kohl, ASLAP

,

I