ML20149M875
| ML20149M875 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 02/22/1988 |
| From: | Wang A Office of Nuclear Reactor Regulation |
| To: | Mroczka E CONNECTICUT YANKEE ATOMIC POWER CO. |
| Shared Package | |
| ML20149M876 | List: |
| References | |
| TAC-66165, NUDOCS 8802290195 | |
| Download: ML20149M875 (2) | |
Text
.
February 22, 1988 Docket No.: 50-213 DISTRIBUTION i
,D555tTTE EJordan hRC/ Local POR JPartlew i
l t'r. Edwarc. J. i'roczka, Sonicr Vice Fresident FD14 R/F TCarnhart (4) i Nuclear Engiru ring and Operations WJones i
Nang(10) l Connecticut Yankte Attnic Power Corpany ACRS GPA/PA l
Post Office Ecx 270 DHagan EBoger i
Hartford, Connecticut (6141-0270 CCC-Ceth Sfiorris Cear I:r. f:rc<2ka:
EPutche:-
Abbng ARit/LFPE t
SUBJECT:
ISSUANCE OF Al'ENCFENT (TAC 66165) i The Cceissicn has issued the enclosed Arrendrent flo. 99..to Facility Cperating License No. CFR-61 for the Haddam Neck Plant. This amendrent is in respense to your application dated Septu ber 9, 1907.
This artendrent revises Technical Specification 5.4, "Containtrent," by deleting Section S.4.B., "Penetrations," which references the design inforration conce.rning the ccr.tainrent penetratiens and their associated bases. Specific design infortattori concerning pu.etratict.s is currently discussed in S(:ction 3.P ard 0.3 of the Haddam tieck Plant Updated Firal Safety Analysis Pepert (UFSAR).
A ccpy of the Safety Evaluation is enclosed. A Notice of Issuarce will be incit.ded in the Ccrmission's bi-nekly Federal Register Notice.
Sincerely, l
original signed by I
Alan E. Wang, Project ifanager i
Froject Directorate I 4 Divisicn of Reactor Projects I/II
Enclosures:
l 1.
/rendrent fio. 99 to i
License No. LFR-01 P.
Safety Evaluatico l
cc w/enciesures:
i
.[/ A
/#f See rest page iki/fd
,W LA:JDl4 FI':FD14
'A DCEA:TSB 4
0GC Bethesd St N Narg /M JSt Eutch
/M,//m i
(R /J1/87 it./4/87
/%/ /87
/4t$
l2/tt /87 CFFICIAL RECOR COPY ydd ""
h SE eg229m9s 800222 p
ADOCK 05000213 PDR
Mr. Edward J. Hroczka Connecticut nkee Atomic Power Conany Haddam Neck Plant ec:
Gerald Garfield, Esquire R. M. Kacich, Manager Day, Berry and Heward Ccurselors at I.aw Generation Facilit<es Licensirs City Place Northeast Utilities Service Company Post Office Box P70 Hartford, Connecticut 06103-3499 Hartford, Connecticut 06141 C270 W. D. Ree6 erg, Vice President D. O. Nordquist, Director Nuclear Operations Northeast Utilities Service Company Quality Services Departrent Post Office Box 270 Northeast Utilities Services Ccepary Post Office Box 270 Hartford, Connecticut 0$141-0270 Hartford, Connecticut 06141-0270 Kevin McCarthy, Director Radiation Contt31 Unit Regional Administrator Region 7 Department of Envirenrental Protection U. 5. Nuclear Regulatory Comission State Off*:e Building (31 Park Avenue Hartford, Connecticut. 06106 King of Prussia, Pennsylvania 194Cf Bradford 5. Chase, Under Secretary Board cf Selectmer.
Energy Civisico Town Hall Office of Policy and Mansgement Haddam, Connecticut 06103 20 Washin Hartford,gton Street Connecticut 06106 J. T. Shedtesky, Resident Inspector Haddam Neck Plant D. B. Miller. Station Superintendent i
Haddam Neck Plant c/o U. 5. Nuclear Regulatcry Cow.issier l
l RFD f 1 Fest Office Bcx 116 i
i Post Office Bcx 127E East Haddam Post Office East Haddam, Connecticut 06423 East Harcter., Connecticut 06424 G. H. Bouchard, Unit Superintendent Haddar. Neck Plant RTD / 1 Post Office Box 127E East Harpten, Ccnnecticut 06424 I
i i