ML20149M676

From kanterella
Jump to navigation Jump to search

Forwards SE Evaluation Accepting Licensee 960807 Results of Analyses of Operability Evaluation of Main Steam Sys W/Bent Rod Hangers at Plant
ML20149M676
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 01/22/1997
From: Raghavan L
NRC (Affiliation Not Assigned)
To: Beard P
FLORIDA POWER CORP.
Shared Package
ML20149M679 List:
References
TAC-M95788, NUDOCS 9701240254
Download: ML20149M676 (3)


Text

.

January 22, 1997 Mr. Percy M. Beard, Jr.

Senior Vice President, Nuclear Operations Florida Power Corporation ATTN: Manager, Nuclear Licensing (SA2A)

Crystal River Energy Complex 15760 W Power Line Street i

Crystal River, Florida 34428-6708

SUBJECT:

CRYSTAL RIVER NUCLEAR GENERATING PLANT UNIT 3 - OPERABILITY EVALUATION OF MAIN STEAM SYSTEM WITH BENT R0D HANGERS (TAC NO. M95788)

Dear Mr. Beard:

On May 10, 1996, you discovered, during a routine wa'lkdown, two bent rod hangers on two main steam systems, CR-5 and CR-6, at Crystal River, Unit 3.

On June 12, 1996, you replaced the bent rod hangers with straight rod hangers.

You performed an operability evaluation of this condition and by letter dated August 7,1996, you submitted to the NRC staff the results of your analyses.

We have reviewed your analyses and find them acceptable.

The attached safety evaluation documents our conclusion.

If you have any questions regarding this matter, please write or call me at (301)-415-1471.

Sincerely,

/S/

o rec o a II-Division of Reactor Projects - I/II i

Office of Nuclear Reactor Regulation i

Docket No. 50-302

Enclosure:

As stated i

cc w/ enclosure:

See next page i

Distribution Docket File Public CR3-Reading S. Varga ll.

J. Zwolinski ACRS X. Landis, RII R. Wessman i'I M. Hertzman T. Harris (1tr/SE) f If DOCUMENT NAME: G:\\ CRYSTAL \\95788.SER 240046 D

To receive a copy of this document, indicate in the box:

"C" - Copy without attachment / enclosure "E

= Copy with attachment / enclosure "N" - No copy 0FFICE PDII-3/PM l

PDII-3/LA B PDII-3/D,)

E l

NAME LRaghavan W BClayto W FHebdon tvl' DATE 01/ 24 /97 01/p-/97 01/ <%/97 0FFICIAL RECORD COPY 9701240254 970122 PDR ADOCK 05000302 P

PDR

psd 44 p

4 UNITED STATES g

y NUCLEAR REQULATORY COMMISSION WASHINGTON, D.C. 20666 4 001

%g

/

January 22, 1997

.....j Mr. Percy M. Beard, Jr.

Senior Vice President, Nuclear Operations Florida Power Corporation ATTN: Manager, Nuclear Licensing (SA2A)

Crystal River Energy Complex 15760 W Power Line Street Crystal River, Florida 34428-6708

SUBJECT:

CRYSTAL RIVER NUCLEAR GENERATING PLANT UNIT 3 - OPERABILITY EVALUATION OF MAIN STEAM SYSTEM WITH BENT R0D HANGERS (TAC NO. M95788)

Dear Mr. Beard:

On May 10, 1996, you discovered, during a routine walkdown, two bent rod hangers on two main steam systems, CR-5 and CR-6, at Crystal River, Unit 3.

On June 12, 1996, you replaced the bent rod hangers with straight rod hangers.

You performed an operability evaluation of this condition and by letter dated August 7,1996, you submitted to the NRC staff the results of your analyses.

We have reviewed your analyses and find them acceptable.

The attached safety evaluation documents our conclusion.

If you have any questions regarding this matter, please write or call me at (301)-415-1471.

Sincerely,

^ \\/

L. Raghavan, Project Manager Project Directorate II-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-302

Enclosure:

As stated

Mr. Percy M. Beard, Jr.

CRYSTAL RIVER UNIT NO. 3 Florida Power Corporation GENERAT7NG PLANT

{

4 CC:

i Mr. R. Alexander Glenn Chairman Corporate Counsel Board of County Commissioners Florida Power Corporation Citrus County MAC-A5A 110 North Apopka Avenue P.O. Box 14042 Iverness, Florida 34450-4245 St. Petersburg, Florida 33733-4042 Mr. Larry C. Kelley, Director Mr. Bruce J. Hickle, Director Nuclear Operations Site Support Nuclear Plant Operations (NA2C)

(SA2A)

Florida Power Corporation.

Florida Power Corporation Crystal River Energy Compi..

Crystal River Energy Complex 15760 W. Power Line Strett 15760 W. Power Line Street Crystal River, Florida 34428-6708 Crystal River, Florida 34428-6708 Mr. Robert B. Borsum Senior Resident Inspector B&W Nuclear Technologies Crystal River Unit 3 1700 Rockville Pike, Suite 525 U.S. Nuclear Regulatory Commission Rockville, Maryland 20852 6745 N. Tallahassee Road Crystal River, Florida 34428 Mr. Bill Passetti Office of Radiation Control Mr. Gary Boldt Department of Health and Vice President - Nuclear Production Rehabilitative Services Florida Power Corporation 1317 Winewood Blvd.

Crystal River Energy Complex Tallahassee, Florida 32399-0700 15760 W. Power Line Street Crystal River, Florida 34428-6708 Attorney General Department of Legal Affairs Regional Administrator, Region II The Capitol U.S. Nuclear Regulatory Commission Tallahassee, Florida 32304 101 Marietta Street N.W., Suite 2900 Atlanta, Georgia 30323 Mr. Joe Myers, Director Division of Emergency Preparedness Mr. Kerry Landis Department of Community Affairs U.S. Nuclear Regulatory Commission 2740 Centerview Drive 101 Marietta Street, N.W. Suite 2900 Tallahassee, Florida 32399-2100 Atlanta, Georgia 30323-0199