Docket No.-50-424
' License No. NPF-68
,
Georgia Power Company
ATTN: Mr. James P. O'Reilly
Senior Vice President-
Nuclear Operations
P. O. Box 4545
Atlanta, GA 30302
Gentlemen:
SUBJECT:
EQUIPMENT QUALIFICATION INSPECTION OF V0GTLE ELECTRIC GENERATING
PLANT (INSPECTION REPORT NO. 50-424/88-012)
This letter confirms the dates of March 21-25, 1988, for the NRC environmer.tal
qualification (EQ) of electrical equipment inspection for the Vogtle Unit 1
facili ty.
These dates were established during a previous telephone
conversation with B. Burns on February 10, 1988, by
N. Merriweather of-this
office.
The inspection will take place at the Vogtle site.
A management entrance meeting is scheduled for 2:00 p.m. on March 21, 1988,
with . a management exit meeting tentatively scheduled for 10:00 a.m. on
March 25, 1988, at_the plant site. A plant walkdown inspection of specific EQ
equipment is planned for Wednesday, March 23, 1988, and will require escorted
service by knowledgeable EQ personnel of your organization. The walkdowns will
be performed by three walkdown teams consisting of two team members.
The inspection will include the following:
1.
Review of your implementation of 10 CFR 50.49 EQ program, including
preservation of qualified status of equipment.
2.
Review of your implementation of Technical Evaluation Report / Safety
Evaluation Report EQ corrective action commitments.
3.
Review of EQ documentation files including all supporting calculations and
performance characteristics (including instrument and loop accuracies in
which effects of decreases of insulation resistance as a result of hostile
environment degradation of equipment such as terminal blocks, cable,
splices, EPA, transmitters, etc., are evaluated (sce NUREG/CR-3691);
variation in current; voltage; frequency and other electrical
characteristics that could impact the qualification). Additional details
for auditability of EQ records are specified in IE Notice 85-39.
4.
Physical inspection of equipment from the Master List.
g22%k
p
G
.Z20 /
._
_.
__
_.
_
_ _ _ _
..
,
\\c
gd*
Georgia Power Company
2
FEB 1. a m
At' least two weeks prior to the inspection, we will require one copy of each
document identified in Enclosure 1 with a plus (+) mark.
A duplicate copy is
to be sent to:
- U
S. Nuclear Regulatory Connission .
Vidis Potapovs Chief
Equipment Qualification Inspection Section-
1 White Flint North
11555 Rockville Pike
Mail Stop 9D4
Rockville, MD 20852
All calculations and files are to be at the audit site for this inspection.
For the entrance meeting on Monday, March 21, 1908, the inspection team
requests that you provide a presentation of your EQ Program, ctatus of program
implementation and any recent EQ items that have becn identified by your staff.
The names and social security numbers of the NRC inspection team are listed in
Enclosure 2.
Your cooperation during this inspection will be appreciated.
Should you have
any questions regarding this inspection, please co' tact T. E. Conlon on (404)
331-5537.
Sincerely,
r%
%
Alan R. Herdt, Chief
Engineering Branch
Division of Reactor Safety
Enclosures:
1.
References
2.
Inspection Team Roster
cc w/encls:
P. D. Rice, Vice President, Project
Director
C. W. Hayes, Vogtle Quality
Assurance Manager
G. Bockhold, Jr., General Manager,
Nuclear Operations
L. Gucwa, Manager, Nuclear Safety
and Licensing
J. A. Bailey, Project Licensing
Manager
cc w/encls cont'd - (see page 3)
g
, - , -
g.
- . -
_ . - - - -
-
.-
._
--.
- - -
--_
.
,
.
g,;j ,f
f
i
~
o
.s,
.
.,
~
.
Georgia' Power Company
3
.cc w/encls:
(cont'd)
'
B.' W. Churchill, Esq., Shaw~,
Pittman, Potts and Trowbridge
'
D. Kirkland, III, Counsel,
-Office of the Consumer's Utility
,
Council
D. Feig, Georgians'Against:
,
Nuclear Energy:
bec w/encis:
E. Reis 0GC
M. Miller, NRR .
U. Potapovs. NRR
D. Wilson, NRR
.
T. Conlon, RII
'
A. Ruff, RII'
>
N. Merriweather, RII
-
E. Claiborne, Sandia National Laboratories
,
J. Stoffel, EG & G Idaho, Inc.
-!
B. Carpenter, EG & G Idaho, Inc.
M. Sinkule, Project Section Chief
DRS Technical Assistant
NRC Resident Inspector
'
,
Document Control Vesk
State of Georgia
,
RII o
RII
RII
RII
'gtk
1
A
NMerriweather:gb
TConlon
MfiNule
VBrownleo
,
'
02//6 /88
02/jp/88
02/rpf88
02//('/88
'
4
,
u
-
[
!
!
!
,
- - .
,- -
, .-
,
-
.-
_
. _ - - _ -
. '. 4
'
!
,
- .
s
,
,
ENCLOSURE 1
REFERENCES
. Licensee's overa11 EQ Program.
+
~
1.
2.
+NRC Safety Evaluation Reports (SER) concerning environmental qualification
of safety-related electrical equipment.
,
3.
+ Licensee's list of equipment requiring environmental qualification
4.
Generic Letter 84-24, D. G. Eisenhut to Licensee's and Applications,
dated December 17, 1984, Subject:
Certification 'of Compliance to 10 -
CFR 50.49.
5.
+ Licensee's current System Component Evaluation Worksheets (SCEW sheets)
for generic items or equivalent.
6.
+ Licensee's procedures applicable to equipment qualification (EQ program,
procurement of qualified equipment, maintenance of qualified equipment,
1
modifications to EQ equipment, EQ personnel training (site and corporate
personnel), QA/EQ interface including corporate QA, Site QA/QC audits, EQ
spare parts procurement) and licensee program for EQ related NRC Informa-
.
tion Notices /8ulletins.
,
1
7.
- Licensee's qualification documentation and/or files incl: ding all
calculations and analysis (Aging, Performance characteristics, etc.) that
support the environmental qualification.
8.
+SER or statement concerning status of Regulatory Guide 1.97 Equipment in
'
the EQ area.
!
ll
- These documents must be available for the inspectors use throughout the
inspection.
!
+These documents are requested for review before the inspection.
t
,
!
!
!
,
n
1
[
. _ _ _ , _ _. _
.
_ _ _ -,-.. _ _ _ -_
,
,
-; b .
i=- i
, ,
4
b
'
-
t
.
'
. .
.l?
^
.,tI
r
, .
J
ENCLOSURE 2
>*
. ELECTRICAL EQUIPMENT ENVIR0itMENTAL QUALIFICATION
.,
-
INSPECTION OF YOGTLE NUCLEAR STATION '
'
ON MARCH 21-25, 1988
INSPECTION TEAM ROSTER *
Name/
Social
Inspection
Organization -
Security No.
. Clearance
Area
_
Wilson, Dick
383-30-8762-
NRC-Q
Splices, SER
(NRCAsst.TeamLeader)'
Commitments, limit
Switches, Moisture
Intrusion - Seals,
f
Equipment
Status
and
Instrument
Accuracies
'in
general
,
Master EQ File and~
- Levis, William
195-48-6476
-
NRC
Determination of EQ
Parameter,
,
Solenoids-and other
i
items
'to
be
assigned later
Merriweather, Norm
420-74-6185
NRC-Q
Overall EQ Program
(NRCTeamLeader)
Coordination
1
-
Paulk, Chuck
413-88-1326
NRC-Q
IEB's and IENs,
NRC
Vendor Info into EQ
l
Program.
,
Maintenance.
,,
Programmatic
'
Review, and other
items
to
be
assigned later
Smith, Caswell
123-42-2050
NRC-Q
Spare Parts.
HRC
Procurement, EQ/QA
"
Training, QA Audits
Relative
to EQ
Program,
Modification
i
!
I
i
I
l
,
t
...
_
-
--
--
.. .
. .
.
ftg;)m';:Yy4'y
"
- + a*;a'
- Xp; ; ^
-
'"
y
"
n
n..
-
y
,yg
+f3
7 ,q^*.4
-
v: n
F,
-
n ?% _ ; g,
.
,
- . g;
g?)O
,
,
.e
,,
%.
,
' $fl;E..
,
f
O.
M
4:
d
. W i!6blosiJre 2'
.
02!
?
~
~
Sw -
p
-
2
,g,
3;)N
.
CONSULTMi$
!
'
.)
2f
i'
., ,,
A+:
- SAN 0!A NATIONAL LABORA. TORIES
'
-
-
.
- Clafborne. Ed^
-459-26-2033
P?ssible ' areas to
be
reviewed:
<
4
. Perfortnance
'C<
~
' Characteristics
.(Voltage
&
'Frequenc/
V3Mations;
Loop
t
Accuracies,'etc),-
Cables, Terminals
!
Blocks, EPA's,. Rad
.
Konitors
i
'EG8G IDAHO. INC.
{
- Stoffel, Johti
'522-34-1708
DOE-L
Possible areas - to
'!
be
reviewec:
Transmitters,
-lMtors,
' Cable:
.
Identification.
l
t
- Carpenter, Bob-
546-46 6354
DOE-L
Possible altas to
be
reviend:
[
Electrical
!
'
AssemM bt,
Limitorques, RTOs
!
i
- All leam Members are U, 5. Citizens
i
- The assignrents for these team cembers may change ~after a review of your EQ
!
master list of equipment,