Text
DEP.. !! ' 37 17:!7 NE'" HEliME CENIER EEinEjM R r,e,
\\
undtTs0 sT ATss NUCLEAR REQULATORY COMM18810N e
unse,*,otoei, o. c. actes Deceeber 11, 1987 Docket hot, 50 154 and 50 265 Mr. L. D. Butterfield, Jr.
Managar hucleer Licensing Post Office lex 767 Commonwealth Edison Company Chicago, Illinois 00690 Dear Mr. Butterfield SAFETY EYALUATION FOR EXEMPTION $ FROM THE FIRE PROTECTION
$UlJECT:
SECTION !!!.6 REQUIREMENTSOF10CFR50.APPENDIXR42024,62025,63556.AND63557)
(TAC N05, 57282, 57283, 61291, 61292, In response to NRC staff positions on 10 CFR 50, Appendix R prescribed by 19,1943, Commonwealth Edison Company Seneric Letter (GL))83 33, dated Octoberconducted an independent reevaluati J
(Ceco,thelicensee Subsequently,by nuclear Power Station (QCNPS) fire protection program.18,1944, CEC 4 tubmitted letter dated Decoster reverification efforts which included certain technical exemption requestsSection !!!.4, a from the firt protection requirssents of Appendix R, interim compensatory fire hasards analysis, and detailed descriptions of unasures (!Ges) in effect at QCNPS (until plant modifications to comply with Since this original submittal, based upon further AppendixRarecompleted).
staff guidance (i.e. G' 4610 and IEN 84-25) ard continued self evaluations.
Ceco has sutaitted several more letters dated Deces6er 4,1985 June 25,1M6, IN7, and November 23, 1987 ehich requested additional exemptIsas,ober 1modifIcationofpreviousexe July 22, 1988, septsaber 30,1987 Oct requests, and witheawal of others. During staff review of all Appendix R related subarittals, several site visits were conducted (on September 9,1987 23,1987, and October 28,1987) to walk down plant specific February configurattens and confer with QCNPI personnel. contains the staff's safety Evaluation (SE) of all Appendix R axemption requests contained in the aforementioned Ceco subetttals except those 1987. Another SE will be issued at a deteo, since and tecluding, Septester 30laterdatewhichwillencompassth Appendix R fire protection requirements of Section !!!.G received to date.
Concurrent with this later $E a farinal regulatory 'Enemption' will be issued The to Ceco and published in the Federal Register by separate correspondence.
subject of ICMs has already been addressed in NRC letter dated December 1.1987 eso226co86eej2Q34 0
i 1
^
l 2-In acsition to the te:nnical emeraptions mentioned above, Ceco has requested schedular exemptions f rom the provisions of 10 CFR 50.48 for various inconplete By letter dated December 4,1987, plant modifications required by Appendix R.
CICo provided a comprehensive list of referenced letters which detailed the chronology of their submittals requesting schedular estmotions for QChP5 fren 10 CFR 50.48, including related status updates on coseletion of Appendia R To date, all plant eD41fications required to congly with sedtfications.
Appendix R (except for technical esemptions that were granted or are pending) with only two exceptions. As such, excluding emergency have been completed,lve reisted modifications, schwular exemotions from lighting and RCIC va Consequently, the staff considers the 10 CFR 40.48 are no longer necessary.
status of these schedular exemption requests to be moot, and does not plan any further review effort. The two outstanding nodifications will be addressed at teme later date.
With regard to a letter dated April 9.1M7. Ceco requested NRC staff approval to replace the foes water spray system, used to protect recirculation pump Additionally, motor generator (MG) sets, with a standard water spray system.
this letter highlightad a previous modification in the associated fire detection system which resulted in installation of compensation type thennostats vice The staff recognitet this plant alteration of name or inferec detectors.
fire protection features for the recirculation pue, MG sets and finds them acceptable.
Th erry M. Ross, Project Manager Project Directorate 1112 Division of Reactor Projects - 111, !Y, V and Special Projects
Enclosures:
Safety Evaluation cc w/ enclosures:
see attached list 1
ii
.