Forwards Insp Repts 50-361/96-10 & 50-362/96-10 on 961021-25,1104-08 & 1118-21.No Violations Noted
ML20149M445
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 12/13/1996
From: Gwynn T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Ray H
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML20149M447 List:
References
NUDOCS 9612170053
Download: ML20149M445 (5)


See also: IR 05000361/1996010

Text

E

=

UNITED STATES

  • / g "%qIt NUCLEAR REGULATORY COMMISSION

'

'

REGloN IV

e 's - g

S & 611 RYAN PLAZA DRIVE, SulTE 400

'V

5

9.....[ AR LINGT oN, TE XAS 76011 8064

DEC l 31996

Harold B. Ray, Executive Vice President

Southern California Edison Co.

San Onofre Nuclear Generating Station

P.O. Box 128

San Clemente, California 92674-0128

SUBJECT: NRC INSPECTION REPORT 50-361/96-10:50-362/96-10

Dear Mr. Ray:

An NRC inspection was conducted October 21-25, November 4-8, and November 18-21,

1996, at your San Onofre Nuclear Generating Station, Units 2 and 3, reactor facilities. The

enclosed report presents the scope and results of that inspection. The overall results of

this inspection were discussed with Mr. D. Breig of your staff on November 8, and with

Mr. G. Gibson on December 5 and 12,1996.

We have determined that your staff's implementation of the motor-operated valve program,

as revised in response to several concerns raised during the inspection, has successfully

met your commitments to Generic Letter 89-10, " Safety-Related Motor-Operated Valve

Testing and Surveillance." Consequently, the NRC review of your Generic Letter 89-10

motor-operated valve program has been closed. The NRC will evaluate your periodic

verification program, as well as your response to emerging motor-operated valve

performance issues, within the framework of Generic Letter 96-05, " Periodic Verification of

Design Basis Capability of Safety-Related Motor-Operated Valves."

4

it is our understanding that during the exit meeting on November 8,1996, Mr. D. Breig,

Station Technical Manager, stated that Southern California Edison Co. would perform

additional diagnostic testing of valves 2HV-9348 and 3HV-9306 under differential pressure

conditions during the next scheduled refueling outage. Testing of these valves will resolve

concerns for anomalous behavior displayed during design basis testing and potential

effects of lubrication of valve internals, in your letter dated November 14,1996,you

confirmed this regulatory commitment and that our understanding of this commitment is

correct.

We noted with some concern the lack of quality assurance involvement in the

motor-operated valve program, in particular the lack of recent comprehensive self

assessments or audits displaying technical depth. We recognize that recent improvements

have been made in this area, and we encourage further efforts on your part to enhance the

quality oversight of the long-term aspects of your program.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter

and its enclosure will be placed in the NRC Public Document Room (PDR).

~

9612170053 961213

PDR ADOCK 05000361

G PDR

.

~,!

.

Southern California Edison Co. -2-

3

!

i

i Should you have any questions concerning this inspection, we will be pleased to discuss

them with you.

.

-

Sincerely,

,

'

  • . .

!

.

/ / , i

l Thomas P. Gwynn, Direct r

i Division of Reactor S

1

'

Docket Nos.: 50-361;50-362

License Nos.: NPF-10; NPF-15 j

4 l

i Enclosure: I

j NRC inspection Report l

i 50-361/96 10:50-362/96-10 '

'

s cc w/ enclosure:

! Chairman, Board of Supervisors

j County of San Diego

1600 Pacific Highway, Room 335

j San Diego, California 92101

.

Alan R. Watts, Esq.

! Rourke & Woodruff

'

701 S. Parker St. No. 7000

'

,

Orange, California 92668-4702  ;

,

Sherwin Harris, Resource Project Manager

l Public Utilities Department l

3

City of Riverside

'

3900 Main Street

Riverside, California 92522

R. W. Krieger, Vice President

Southern California Edison Company

i San Onofre Nuclear Generating Station

P.O. Box 128

l

San Clemente, California 92674-0128

i

j

l

. .. - . . . -

A

,.. ___._._. ____.. _ _. _ __._ ____ _ __ _ _ _ __. . _ _ . . . . . . . . _ _ _ . -._m___. _ .

.

.

Southern California Edison Co. -3-

Dr. Harvey Collins, Chief

'

Division of Drinking Water and

Environmental Management

California Department of Health Services

P.O. Box 942732

Sacramento, California 94234-7320

l Terry Winter, Manager

j Power Operations

San Diego Gas & Electric Company

P.O. Box 1831

San Diego, California 92112

Mr. Steve Hsu

! Radiological Health Branch

State Department of Health Services

P.O. Box 942732

Sacramento, California 94234

Mayor

City of San Clemente

100 Avenida Presidio

San Clemente, California 92672

Mr. Truman Burns \Mr. Robert Kinosian

California Public Utilities Commission

505 Van Ness, Rm 4102

San Francisco, California 94102

i

i

l

e

!

i  !

'

)

- -- . . - - . -

--

.-

9

.

4

Southern California Edison Co. -4-

E-Mail report to D. Nelson (DJN)

E-Mail report to NRR Event Tracking System (IPAS)

Q bec to DMB (IE01):

bec distrib. by RIV:

L. J. Callan Resident inspector

DRP Director DRS-PSB

Branch Chief (DRP/F, WCFO) MIS System

Senior Project inspector (DRP/F, WCFO) RIV File

J

Branch Chief (DRP/TSS) M. Hammond (PAO, WCFO) i

Leah Tremper (OC/LFDCB, MS: TWFN 9E10)  !

E. Kelly, RI j

P. Fredrickson, Rll j

W. Kropp, Rlli i

T. Scarbrough, NRR

,

)

\

s

DOCUMENT NAME: R:\ REPORTS \SO610RP.CJM

To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy wth enclosures "N" = No copy

RIV:RI:EB Rl:EB NRR C:EB E D:DRP D:DRSb y

MRunyan/Imb" CMyers' RWessman* CVanDenburgh * JEDyer* TPGwynn\ '

12/06/96 12/06/96 12/06/96 12/10/96 12/09/96 12/y96

'Previously concurred OFFICIAL RECORD COPY

I70003

.

!

.

,

Southern California Edison Co. -4-

! ,

E-Mail report to D. Nelson (DJN)

E-Mail report to NRR Event Tracking System (IPAS)

bec to DMB (IE01)

,

bec distrib. by RIV:

L. J. Callan Resident inspector l

DRP Director DRS-PSB '

Branch Chief (DRP/F, WCFO) MIS System .

Senior Project inspector (DRP/F, WCFO) RIV File l

Branch Chief (DRP/TSS) M. Hammond (PAO, WCFO) l

Leah Tremper (OC/LFDCB, MS: TWFN 9E10) l

!

E. Kelly, RI l

P. Fredrickson, Rll

W. Kropp, Rlll

T. Scarbrough, NRR

!

,

l \

'

l

,

l

l

!

!

DOCUMENT NAME: R:\ REPORTS \SO610RP.CJM

To receive copy of document, indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy

RIV:RI:EB RI:EB NRR C:EB E D:DRP D:DRSb ' y

MRunyan/Imb* CMyers' RWessman* CVanDenburgh* JEDyer* TPGwynn\

12/06/96 12/06/96 12/06/96 12/10/96 12/09/96 12/996

  • Previously concurred OFFICIA'. RECORD COPY

l

)