Forwards SE Related to 960729 Requests for Relief from Requirements of Section XI of ASME Boiler & Pressure Vessel Code,1980 Edition Through Winter 1981 Addenda.Relief Request Not Necessary
ML20149L792
Person / Time
Site: Clinton Constellation icon.png
Issue date: 11/12/1996
From: Marcus G
NRC (Affiliation Not Assigned)
To: Telthorst P
ILLINOIS POWER CO.
Shared Package
ML20149L794 List:
References
TAC-M96230, NUDOCS 9611180112
Download: ML20149L792 (5)


Text

Hovember 12, 1996

'Mr. Paul J. Telth:rst DirIcter - Licensing

.Clinton Power Station P. 0. Box 678 Mail Code V920 Clinton, IL 61727

SUBJECT:

ASME SECTION XI RELIEF REQUESTS REGARDING PERFORMANCE OF LEAKAGE AND PRESSURE TESTING FOR THE FIRST 120-MONTH INSERVICE INSPECTION INTERVAL - CLINTON POWER STATION (TAC NO. M96230).

Dear Mr. Telthorst:

By letter dated July 29, 1996 (U-602614), Illinois Power submitted two requests for relief from the requirements of Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,1980 Edition through Winter 1981 Addenda. These requests were with regard to the performance of leakage and pressure testing for primary containment isolation valves and selected ASME Code Class 2 pressure retaining components penetrating the drywell and primary containment. As stated in your letter, inspection activities for the first 120-month inservice inspection interval are due to be completed during the sixth refueling outage at Clinton Power Station, currently scheduled to begin October 13, 1996.

Relief Request 1004 was a request to allow a change in the required frequency of pressure testing selected ASME Code Class 2 pressure etaining components penetrating the drywell and primary containment. As stated in the enclosed safety evaluation, the staff has determined that the affected components are not required to be tested by the Code and, therefore, a relief request is not necessary.

Relief Request 2037 was a request to use Part 10, Paragraph 4.2.2.2,

" Containment Isolation Valves," of ASME/ ANSI OMa 1988 Addenda to ASME/ ANSI OM 1987 (OM-10) for leakage rate testing of primary containment isolation valves, j

This request, which will allow the use of extended valve leak rate test frequencies allowed by 10 CFR Part 50, Appendix J - Option B, is approved pursuant to 10 CFR 50.55a(f)(4)(iv).

Sincerely, Original signed by:

} Call H. Marcus, Director h

Project Directorate III-3 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket No. 50-461 K'O\\ ( \\

Enclosure:

As stated cc w/ encl:

See next page-DISTRIBUTION: See attached sheet.

DOCUMENT NAME:

G:\\CLINTON\\CLI96230.LTR To,ooseve e ospy of this doousnent, indioses in the ben: "C" = Copy without enclosures *E" = Copy with enclosures

  • N" = No copy 0FFICE LA:PDIII-3 l E PM:PDIII-3, d E SC:EMEB l

BC;EMCB l

NAME DFoster-Cursten DPickettu " 5 TScarbrough*

GBagchi**

DATE l$/4/96 46 1(/4/96 08/07/96 09/17/96 0FFICE PD:PDIII-3 E

OGC NAME GMarcus 6fh1 MYoung***

DATE 1$/7 /96 10/16/96 0FFICIAL RECORD COPY

  • Memo from TScarbrough to GMarcus dated 8/7/96
      • See previous concurrence 3 c.** Memo from Bagchi to GMarcus dated 9/17/96 r

9611100112 961112 PDR ADOCK 05000461 P

_PDR

November 12, 1996 i

Mr. Paul J. Telthorst 1

Directer - Licensing l

Clinton Power Station P. 0. Box 678 Mail Code V920 j

Clinton, IL 61727

SUBJECT:

ASME SECTION XI RELIEF REQUESTS REGARDING PERFORMANCE OF LEAKAGE AND 1

PRESSURE TESTING FOR THE FIRST 120-MONTH INSERVICE INSPECTION l

INTERVAL - CLINTON POWER STATION (TAC NO. M96230)

Dear Mr. Telthorst:

By letter dated July 29, 1996 (U-602614), Illinois Power submitted two i

requests for relief from the requirements of Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,1980 Edition through Winter 1981 Addenda. These requests were with regard to the performance of leakage and pressure testing for primary containment isolation i

valves and selected ASME Code Class 2 pressure retaining components j

penetrating the drywell and primary containment. As stated in your letter, inspection activities for the first 120-month inservice inspection interval i

i are due to be completed during the sixth refueling outage at Clinton Power Station, currently scheduled to begin October 13,~1996.

l Relief Request 1004 was a request to allow a change in the required frequency l

of pressure testing selected ASME Code Class 2 pressure retaining components penetrating the drywell and primary containment. As stated in the enclosed i

safety evaluation, the staff has determined that the affected components are j

not required to be tested by the Code and, therefore, a relief request is not necessary.

Relief Request 2037 was a request to use Part 10, Paragraph 4.2.2.2, l

" Containment Isolation Valves," of ASME/ ANSI OMa 1988 Addenda to ASME/ ANSI OM i

1987 (OM-10) for leakage rate testing of primary containment isolation valves.

j This request, which will allow the use of extended valve leak rate test frequencies allowed by 10 CFR Part 50, Appendix J - Option B, is approved pursuant to 10 CFR 50.55a(f)(4)(iv).

j Sincerely, j

Griginal signed by:

Gail H. Marcus, Director Project Directorate III-3 i

Division of Reactor Projects III/IV Office of Nuclear Reactor Res lation Docket No. 50-461

Enclosure:

As stated cc w/ encl: See next page DISTRIBUTION:

See attached sheet.

DOCUMENT NAME:

G:\\CLINTON\\CLI96230.LTR To,eemise a empy of this deeunient, hedoses in the ben: *C" = Copy without enclosures *E" = Copy with enclosures m - we.epy 0FFICE LA:POIII-3 l E PM:PDIU-3,el E SC: EMES l

BC;EMCB l

NAME DFoster-Cursten DPickettu " '

TScarbrough*

GBagchi**

DATE l$/4/96 dK 1(/4/96 08/07/96 09/17/96 0FFICE PD:PDIII-3 E

OGC NAME GMarcus 6fft1 MYoung***

DATE l$/~1/96 10/16/96 0FFICIAL RECORD COPY

  • Memo from TScarbrough to GMarcus dated 8/7/96
      • See previous concurrence
    • Memo from GBagchi to GMarcus dated 9/17/96 J

s@ MGuqk UNITED STATES g

g j

NUCLEAR REGULATORY COMMISSION

'2 WASHINGTON, D.C. 20066 0001 1

\\

,,/

November 12, 1996 Mr. Paul J. Telthorst Director - Licensing Clinton Power Station P. 0. Box 678 Mail Code V920 Clinton, IL 61727

SUBJECT:

ASME SECTION XI RELIEF REQUESTS REGARDING PERFORMANCE OF LEAKAGE AND PRESSURE TESTING FOR THE FIRST 120-MONTH INSERVICE INSPECTION INTERVAL - CLINTON POWER STATION (TAC NO. M96230)

Dear Mr. Telthorst:

l By letter dated July 29, 1996 (U-602614), Illinois Power submitted two requests for relief from the requirements of Section XI of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,1980 Edition through Winter 1981 Addenda. These requests were with regard to the performance of leakage and pressure testing for primary containment isolation valves and selected ASME Code Class 2 pressure retaining components penetrating the drywell and primary containment. As stated in your letter, inspection activities for the first 120-month inservice inspection interval are due to be completed during the sixth refueling outage at Clinton Power Station, currently scheduled to begin October 13, 1996.

Relief Request 1004 was a request to allow a change in the required frequency of pressure testing selected ASME Code Class 2 pressure retaining components penetrating the drywell and primary containment. As stated in the enclosed safety evaluation, the staff has determined that the affected components are not required to be tested by the Code and, therefore, a relief request is not necessary.

Relief Request 2037 was a request to use Part 10, Paragraph 4.2.2.2,

" Containment Isolation Valves," of ASME/ ANSI OMa 1988 Addenda to ASME/ ANSI OM 1987 (OM-10) for leakage rate testing of primary containment isolation valves.

This request, which will allow the use of extended valve leak rate test frequencies allowed by 10 CFR Part 50, Appendix J - Option B, is approved pursuant to 10 CFR 50.55a(f)(4)(iv).

Sincerely, m

Gail H. Marcus, Director Project Directorate III-3 Division of Reactor Projects III/IV Office of Nuclear Reactor Regulation Docket No. 50-461

Enclosure:

As stated cc w/ enc 1: See next page

I I

rM Distr' bution w/ encl: Clinton Relief TAC NO. M96230 dated Nnvomhor 19 iQQA i

TDecket1 i

PUBLIC i

PDIII-3 Reading J. Roe E. Adensas (E) i ACRS

'0GC

~G. Hill (2)

B. McCabe J. Caldwell, RIII 1

4

\\

1 5

4 l

l 1

)

j i

Mr. Paul J. Telthorst Clinton Power Station 1

Illinois Power Company Unit No. I cc:

Mr. Wilfred Connell Illinois Department Vice President of Nuclear Safety Clinton Power Station Office of Nuclear Facility Safety Post Office Box 678 1035 Outer Park Drive Clinton, Illinois 61727 Springfield, Illinois 62704 Mr. Daniel P. Thompson Manager Nuclear Station Engineering Department Clinton Power Station Post Office Bor, 678 Clinton, Illinois 61727 Resident Inspector U.S. Nuclear Regulatory Commission RR#3, Box 229 A Clinton, Illinois 61727 Mr. R. T. Hill Licensing Services Manager General Electric Company 175 Curtner Avenue, M/C 481 San Jose, California 95125 Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, Illinois 60532-4351 Chairmar,of DeWitt County c/o County Clerk's Office DeWitt County Courthouse Clinton, Illinois 61727 Mr. J. W. Blattner Project Manager Sargent & Lundy Engineers 55 East Monroe Street Chicago, Illinois 60603