ML20149L641
| ML20149L641 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 02/18/1988 |
| From: | Martin T NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Mroczka E NORTHEAST NUCLEAR ENERGY CO. |
| Shared Package | |
| ML20149L642 | List: |
| References | |
| NUDOCS 8802240339 | |
| Download: ML20149L641 (2) | |
See also: IR 05000423/1987032
Text
_ _ _ _ _ _ _ _ _
___ ___
_ _ _ _
____
_ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ _ _ _ _ _ _ _ _ _ _ _ _ .
.
k
O
FEB18 m8
Docket No. 50-423
Northeast Nuclear Energy Company
ATTN: Mr. E. J. Mroczka
Senior Vice President - Nuclear
Engineering and Operations Group
P. O. Box 270
Hartford, Connecticut 06141-0270
Subject:
Inspection Report No. 50-423/87-32
This refers to the routine safety inspection in the area of nonradiological
chemistry conducted by Mr. H. Zibulsky and Dr. J. Jang of this office on
Decerter 14-18, 1987 at the Millstone Unit 3 Nuclear Power Plant, Waterford,
Connecticut of activities authorized by NRC License No NPF-49 and to the
discussions of our findings held by Mr. Zibulsky and Dr. Jang with
Mr. C. Clement and other members of your staf f at the conclusion of the
inspection.
Areas examined during this inspection are described in the NRC Region !
Inspection Report which is enclosed with this letter. Within these areas, the
inspection consisted of selective exaninations of procedures and
representative records, interviews with personnel, and observations by the
inspectors.
Within the scope of this inspection, no violations were observed.
No reply to this letter is required.
Your cooperation with us in this matter
i
is appreciated.
1
Sincerely,
Sd Jy:
p, M any
,.
Thccas T. Martin, Director
Division of Radiation Safety
and Safeguards
cc w/ encl:
W. D. Rocterg, Vice President, Nuclear Operations
R. M. Kacich, Manager, Generation Facilities Licensing
D. O. Nordquist, Manager of Quality Assurance
l
S. E. Scace Station Superintendent
j
Public Document Poom (PDR)
local Public Docurent Roon (LPDR)
I
{
l
Nuclear Safety Inferration Center (NSIC)
i
NRC Senior Resident Inspector
'F-'
State of Connecticut
{p
i
0802240339 000210
.
,.
_. !.'.] i.'F ng ff;*fu
'
ADOCK 05000423
p
qCi i .;m;
.
i,
_g
.w vJ e
o
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ - _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _
_ _ _ - _ _ _ _
.
Northeast Nuclear Energy
2
FEB 181993
i
Company
I
tcc w/ encl:
I
Region!DocketRoom(withconcurrences)
Managerent Assistant. ORMA (w/o encl)
DRP Section Chief
l
B. Doolittle LPM, NRR
l
l
L. Prividy, RI, Beaver Valley Ur.it 2
T. Rebelowski, SRI. Millstone 1&2
I
Robert J. Bores. DRSS
l
l
1
o
b
d
g/f %!MRSS
RI:0RLS
- DR'
R!:0RSS h
-,
Ma
Zibulsky
tak
Eellamy
Jang ; g
1/2.(/66
/88
V $/88
1////
1/ /6
'
0FFICIAL RECORD COPf
ir mil 87-32
1/15/88
.