ML20149L460

From kanterella
Jump to navigation Jump to search
Forwards for Review,Salp Rept for San Onofre Nuclear Generating Station for Period 951231-970705 & Meeting to Discuss Rept Scheduled for 970827 at Training & Education Ctr at Facility
ML20149L460
Person / Time
Site: San Onofre  Southern California Edison icon.png
Issue date: 07/29/1997
From: Merschoff E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Ray H
SOUTHERN CALIFORNIA EDISON CO.
Shared Package
ML20149L463 List:
References
50-361-97-99, 50-362-97-99, NUDOCS 9708010181
Download: ML20149L460 (4)


Text

e

/ "O /, UNITED ST AT ES

/ NUCLEAR REGULATORY COMMISSION 5 i H EGloN IV

$ (11 RY AN PL AZA OR6VE, SUITE 400

't.

.....- ARUNGTON T E X AS 760118064 July 29, 1997 Harold B. Ray, Executive Vice President Southern California Edison Co.

San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, California 92674-0128

SUBJECT:

SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE (SALP)

REPORT 50-361/97-99;50-362/97-99

Dear Mr. Ray:

Enclosed for your review is the SALP report for the San Onofre Nuclear Generating Station, Units 2 and 3 for the period of December 31,1995, through July 5,1997. A public -

meeting to discuss this report with you and your staff has been scheduled for 10 a.m. (PDT) on August 27,1997, at the Training and Education Center at the San i Onofre facility. During this meeting you are encouraged and expected to candidly comment on our report. Although this meeting is a forum between Southern California Edison and the NRC, it will be open to observation by members of the public and other interested parties.

In accordance with NRC policy, I have reviewed the recommendations of the SALP Board .

and concur with the ratings and views. The Maintenance and Plant Support functional areas were assigned Category 1 ratings, reflecting superior safety performance, and the Plant Operations and Engineering areas were assigned Category 2 ratings, reflecting overall good safety performance.

Overall performance in the area of Plant Operations was good, with strong performance ,

noted during plant evolutions and improved performance noted during outages. Instances l of inconsistent performance related to operator attentiveness, procedure implementation, communications, and control of field activities were noted.

In the Maintenance area, safety performance improved to a superior level due to  !

improvement in the overall material condition of the station,' reduction in the problem identification threshold, and the conduct of maintenance activities in the field. We  ;

encourage your continued efforts to improve the plant material condition and to improve performance in the areas of surveillance testing and welding.

Performance in the area of Engineering was good. Strong performance was noted in the areas of corrective actions, self assessments, and outage support, although inconsistencies were noted with management oversight and quality of engineering support to certain activities. Particularly strong performance was noted in the resolution of the degraded steam generator tube supports (i.e., eggerates) in Unit 3.

I 9708010181 970729 I i PDR ADOCK 05000361  !

G PDR

o Southern California Edison Co. Overall performance in the Plant Support area remained superior. Radiological protection during the steam generator chemical cleaning activities was strong.

Safety assessment and quality verification activities continue to be a strength at San Onofre. You have demonstrated strong self-assessment performance by your line organizations and the Nuclear Oversight organization.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter and its enclosures will be placed in the NRC Public Document Room.

Should you have any questions or comments, I would be pleased to discuss them with you. While no written response is required, you may provide written comments within 30 days of the public SALP meeting.

Sincerely,

/

Ellis W. Mers ff Regional Administrator Docket Nos.: 50-361 50-362 License Nos. NPF-10 NPF-15

Enclosure:

NRC SALP Report 50-361/97-99; 50 362/97-99 cc w/ enclosure:

Chairman, Board of Supervisors County of San Diego 1600 Pacific Highway, Room 335 San Diego, California 92101 Alan R. Watts, Esq.

Woodruff, Spradlin & Smart l 701 S. Parker St. Suite 7000 I

Orange, California 92868-4720 4

l i

I

1 1 .

Southern California Edison Co. Sherwin Harris, Resource Project Manager Public Utilities Department City of Riverside '

3900 Main Street Riverside, California 92522 R. W. Krieger, Vice President Southern California Edison Company San Onofre Nuclear Generating Station P.O. Box 128 San Clemente, California 92674-0128 Dr. Harvey Collins, Chief Division of Drinking Water and Environmental Management California Department of Health Services P.O. Box 942732 Sacramento, California 94234-7320 Terry Winter, Manager Power Operations San Diego Gas & Electric Comoany P.O. Box 1831 t San Diego, California 92112 Mr. Steve Hsu Radiological Health Branch State Department of Health Services 1 P.O. Box 942732 Sacramento, California 94234 Mayor City of San Clemente 100 Avenida Presidio l l San Clemente, California 92672 Mr. Truman Burns \Mr. Robert Kinosian  ;

California Public Utilities Commission 1 505 Van Ness, Rm. 4102 San Francisco, California 94102 ,

l i

l

3 4

Southern California Edison Co. E-Mail report to T. Boyce (THB)

E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK) bec to DCD (IE40) bec distrib. by RIV:

Regional Administrator Resident inspector DRP Director DRS-PSB Branch Chief (DRP/F, WCFO) MIS System Senior Project inspector (DRP/F, WCFO) RIV File Branch Chief (DRP/TSS) M. Hammond (PAO, WCFO)

WCFO File Carol Gordon The Chairman (MS: 16-G-15) Records Center, INPO Commissioner Rogers (MS: 16-G-15) Deputy Regional Administrator Commissioner Dicus B. Henderson, PAO Commissioner Diaz DRP Commissioner McGaffigan SRis at all RIV sites L. J. Callan, EDO (MS: 17-G-21) B. Murray, DRS/PSB Associate Dir. for Projects, NRR C. A. Hackney Associate Dir. for Insp., and Tech. Assmt, NRR SALP Program Manager, NRR/lLPB (2 copies)

J. W. Roe, NRR, Director, Division of Reactor Projects Ill/IV M. B. Fields, NRR, Project Manager DOCUMENT NAME: R:\_SO23\SO799SF. DRP To receive copy of document, Indicate in box: "C" = Copy without enclosures "E" = Copy with enclosures "N" = No copy RIV: SRI C:DRP/F D:DRS D;WCFO PE:DRP/F l l JASloan* DGAcker* DFKirsch

  • ATHowell* KEPerkins
  • 7/22/97 7/21/97 7/22/97 7/22/97 7/22/97 NRR:D/DRP lil/IV l DRA l RAyf/ ) l l l '-

JWRoe

  • JEDyer (ptg @schoff 7/22/97 7t]$97 701/97
  • previously concurred OFFICIAL RECORD COPY

Southern California Edison Co. E-Mail report to T. Boyce (THB) I E-Mail report to NRR Event Tracking System (IPAS)

E-Mail report to Document Control Desk (DOCDESK) I bec to DCD (IE40) bec distrib. by RIV:

Regional Administrator Resident inspector DRP Director DRS-PSB Branch Chief (DRP/F, WCFO) MIS System Senior Project inspector (DRP/F, WCFO) RIV File Branch Chief (DRP/TSS) M. Hammond (PAO, WCFO) ,

WCFO File Carol Gordon '

The Chairman (MS: 16-G-15) Records Center, INPO Commissioner Rogers (MS: 16-G-15) Deputy Regional Administrator

)

Commissioner Dicus B. Henderson, PAO Commissioner Diaz DRP Commissioner McGaffigan SRis at all RIV sites L. J. Callan, EDO (MS: 17-G-21) B. Murray, DRS/PSB Associate Dir. for Projects, NRR C. A. Hackney Associate Dir. for Insp., and Tech. Assmt, NRR SALP Program Manager, NRR/lLPB (2 copies)

J. W. Roe, NRR, Director, Division of Reactor Projects Ill/IV M. B. Fields, NRR, Project Manager i

DOCUMENT NAME: R:\_SO23\SO799SF. DRP 1 To receive copy of document, indicate in box: "C" = Copy with. rut enclosures "E" = Copy with enclosures "N" = No copy RIV: SRI PE:DRP/F l C:DRP/F l D:DRS D:WCFO JASloan* DGAcker* DFKirsch

  • ATHowell' KEPerkins" l 7/22/97 7/21/97 7/22/97 7/22/97 7/22/97 NRR:D/DRP lil/IV DRA RVJ) j JWRoe
  • JEDyer (ygf Mschoff 7/22/97 7r)0/97 721/97
  • previously concurred )

OFFICIAL RECORD COPY

,