l DPERATING DATA REPORT i
DOCKET No 50 369 DATE February 15. 1996 OPERATING STATUS COMPLETED BY R.A. Williaes TELEPHONE 704-382-5346
- 1. Unit Nase: McGuire i 1
- 2. Reporting Period: January 1, 1996-January 31,1996 j
- 3. Licensed Thereal Power (MWt):
3411
- 4. Naseplate Rating (Bross MWe):
13058 Notes eNaseplate Ratin0 5.DesignElectricalRating(NetMWe):
1100 (6ross MWe) calculated as
- 6. Maxieue Dependable Capacity (Bross MWe):
!!71 1450.000 MVA :.90 power
- 7. Maxisue Dependable Capacity (Not MWe):
!!29 factor per Page ill,
- 8. If Changes Occur in Capacity Ratings (Itses Nueber 3 Through 7) Since Last NUREG-0020.
Report. Give Reasons
- 9. Power Level To Which Restricted, if Any (Net NWe):
- 10. Reason For Restrictions, if any:
This Month Yr.-to-Date Cuaulative 1
!!. Hours In Reporting Period 744.0 744.0 124200.0
- 12. Nueber Of Hours Reactor Was Critical 191.6 191.6 88630.9
- 13. Reactor Reserve Shutdown Hours -0--
--0--
- 14. Hours 6enerator On-Line 131.1 131.1 87662.6 1
1
- 15. Unit Reserve Shutdown Hours
--0--
--0--
- 16. Stoss Thereal Energy 6enerated (MWH) 408518 408518 275162620
- 17. Gross Electrical Energy Generated (MWH) 107491 107491 94482771
- 18. Net Electrical Energy Generated (MWH) 94219 94219 90261790
- 19. Unit Service Factor 17.6 17.6 70.6
)
- 20. Unit AvailabM ity factor 17.6 17.6 70.6
- 21. Unit Capacity Factor (Using MDC Net) 11.2 11.2 63.4
- 22. Unit Capacity Factor (Using DER Net) 10.7 10.7 61.6
- 23. Unit Forced Outage Rate 0.0 0.0 13.6
- 24. Shutdown Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
None
- 25. If Shut Down At End Of Report Period. Estiaated Date of Startup:
- 26. Units in fest Status (Prior to Coesercial Operation):
Forecast Achieved INiilALCR!i!CALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 9602220369 960215 PDR ADOCK 05000369 R
~
OPERATING DATA REPORT DOCKET NO 50-369 i
UNIT Ncliuire 1
~ BATE February 15. 1996 C0lFLETED BY-R. A. Williams TELEPHONE 704-382-5346 MONTH Januarv. 1996
-M1 AVERA8E DAILY POWER LEVEL M1 AVERAGE DAILY POWER LEVEL (MWe-Met)
(Nue-Net) 1 0
17 0
2 0
18 0
3 0
19 0
4 0
20 0
5 0
21 0
6 0
22 0
7 0
23 0
0 0
24 0
1 0
25 0
10 0
26 11 11 0
27 223 12 0
29 711 13:
0 29
-1016 14 0
30 1124 19 0
31 1143 16 0
._.m UNIT SHUTDOWNS AWD POWER REDUCTIONS DOCKET NO.
50-369 UNIT NAME. m yvind 1-DATE uz/id/sb REPORT MONTH January 1996 COMPLETED BY x.
a nilliams TELEPHONE teus;-auz-dseb (1)
(2)
(3)
(4)
(5)
R MET-E HOD l
T A
OF LICENSE N
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE O
P DURATION O
DOWN REPORT TEM COMPONENT ACTION TO-c DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE
[
1 96 1 S
596.78 C
RC FUELXX END-OF-CYCLE 10 REFUELING OUTAGE t
1-P 96-1-25 F
B CH XXXXXX AUXILIARY FEELKATER FLOW BALANCE 2
96-1-26 S
16.12 B
HA-TURBIN TURBINE OVERSPEED TRIP TEST 2-P 96-1-27 S
B IA INSTRU INTERMEDIATE RANGE CALIBRATIONS 3-P 96-1-27 S
B RC FUELXX FLUX MAPPING 4-P 96-1-28 S
B IE-INSTRU EXCORE CALIBRATIONS i
5-P 96-1-28 S
B RC FUELXX FLUX MAPPING l
(1)
(2)
(3)
(4)
F Forced Reason-Method:
Exhibit G - Instructions S Scheduled A-Equihment Failure (Explain) 1-Manual for Preparation of, Data 1
B-Maintenance or test 2-Manual Scram Ent y Sheets For Licensee +
C-Refueling 3-Automatic Scram (LER Event Report ( M EG-0161))
D-Regulatory Restriction 4-Other (Explain)
File E-Operator Training & License Examination t
F-ABministrative (5)
(Explain) (Explain)
Exhibit I - Same Source G-Operator Error H-Other
[
F i
[
t l
)
i i
DOCKET: 50 369 i
l UNIT: McGuire I t
l Date:
02/15/96
[
i NARRATIVE
SUMMARY
.i i
l MONTil: January,1996 l
t McGuire Unit I began the month of January in end-of-cycle 10 refueling outage. The refueling outage q
spanned 42.70 days. The unit was placed on-line 01/25/96 at 2047 and held at 10% power from 2242 to 01/26/96 at 0853 due to auxiliary feedwater flow balance. On 01/26/96 at 0934 the turbine overspeed trip test was performed and the unit was placed on-line 01/27/96 at 0141. During power escalation, the unit held at 25% power from 0600 to 1110 due to intermediate range calibrations. The unit held at 38% power l
from 1748 to 2337 due to flux mapping. On 01/28/96 from 0400 to 0510 the unit held at 49% power due to excore calibrations. The unit held at 78% power from 1606 to 2105 due to flux mapping. The unit returned to 100% full power on 01/30/96 at 1525, and operated at or near 100% power the remainder of the month.
l i
i Prepared by: R. A. Williams Telephone:(704)- 382-5346 4
i
i 1.
4 1
MONT11LY REFUELING INFORMATION REOUEST I
1.
Facility name:
McGuire. Unit 1 i
4 2.
Scheduled next refueling shutdown: Februarv 1997
(
3.
Scheduled restart following refueling: May 1997 E
Tile PROJECT MANAGER llAS BEEN ADVISED BY SEPARATE COMMUNICATION OF
.l ANY T.S. CilANGE OR LICENSE AMENDMENT. TilEREFORE, QUESTIONS 4 TilROUGil 6 WILL NO LONGER BE MAINTAINED IN Tills REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification change or
[
other license amendment?
i If yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee l
regarding unreviewed safety questions?
i 5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
)
6.
Important licensing considerations (new or different design or supplier, unrevkwed design or performance analysis methods, significant changes in design or new operating procedures) 7.
Number of Fuel assemblies (a) in the core: 191 l
(b) in the spent fuel pool: 221 l
l l
8.
Present licensed fuel pool capacity: 1461 j
Size of requested or planned increase:..-
j 9.
Projected date oflast refueling which can be accommodated by present license capacity: March
- g...
4 i
)
i DUKE POWER COMPANY DATE: February 15.1996 l
Name of
Contact:
R. A. Williams Phone: (704)- 382-5346 T
4 f
1
I OPERATING DATA REPORT DOCKET NO 50-370 DATE February 15. 1996 OPERATINGSTATUS COMPLETED BY R.A. Williams TELEPHONE 704-202-5346
- 1. Unit Names McGuire 2
- 2. Reporting Period: January 1, 1996-January 31,1996
- 3. Licensed Thereal Power (MWt):
34tl
- 4. Naseplate Rating 16ross MWe):
1305 Notes eNameplate Rating
- 5. Design Electrical Rating (Net MWel 1100 (Bross MWel calculated as
- 6. Marisue Dependable Capacity (Stoss MWe):
1171 1450.000 MVA x.90 power
- 7. Maxieue Dependable Capacity (Net MWel:
!!29 factor per Page 111,
- 8. If Changes Occur in Capacity Ratings (itses Number 3 Through 7) Since Last NURE6-0020.
Report. Elve Reasons
- 9. Power Level To Which Restricted, If Any_(Net MWe):
- 10. Reason For Restrictions, if any:
This Month Yr.-to-Date Cumulative
!!. Hours in Reporting Period 744.0 744.0 104496.0
- 12. Number Of Hours Reactor Was Critical 744,0 744,0 B2499.6
- 13. Reactor Reserve Shutdown Hours
--0--
--0--
--0--
- 14. Hours Senerator On-Line 744.0 744.0 81474.8
- 13. Unit Reserve Shutdcun Hours
- --0--
--0--
- 16. Gross Thereal Energy 6enerated (MWH) 2526107 2526107 267765756
- 17. Gross Electrical Energy Generated (MWH) 882766 882766 93384042
- 18. Net Electrical Energy Benerated (MWH) 850713 850713 89563070
- 19. Unit Service Factor 100.0 100.0 78.0 20.UnitAvailabilityFacter 100.0 100.0 78.0
- 21. Unit Capacity Factor (Using MDC Net) 101.3 101.3 75.2
- 22. Unit Capacity Factor (Using DER Net) 96.9 96.9 72.7
- 23. Unit forced Outage Rate 0.0 0.0 6.3
- 24. Shutdown Schehled Over Next 6 Months (Type, Date, and Duration of Each):
Refueline - Anr11 05. 1996 - 45 days j
- 25. If Shut Down At End Of Report Period. Estinated Date of Startup:
- 26. Units In Test Status (Prior to Coseercial Operation):
Forecast Achieved INITIALCR171CAllTY INITIAL ELECTRICITY COMMERCIAL DPERATION
..... - - - - ~. -
+
OPERATING DATA REPORT
)
I DOCKET NO-50-370 UNIT incautre 2 i
DATE Fahrmary 15. 1996 l
COMPLETED BY R.A. Williams TELEPHOIE 704-382-5346 i
i i
i i
MONTH J - "ry. 1996 i
1
. E AYERAGE DAILY POWER LEVEL E
AVERASE SAILY POWER LEYEL I
f (MWe-Net)
- (flie-Net) l' 1142 17 1145-2 1140 18
!!42 3
1143 19 1142 4
1143 20 1142 5
1143 El 1143 6
1143 22 1145
)
7
-1144 23 1149 n
I B
1145 24 1150 I
9
!!45 25 1148 10 1146 26 1148 11 1141 27 1146 12 1118 28 1144 13 1145 29 1140 1
.14 1148 -
30 1145
. 15 1149-31 1132 16 '
'1149 g
J t
i
UNIT SHUTDOWMS AND POWER REDUCTIONS DOCKET NO.
50-370 U N I T N A M E ri w u l a ti 2
~DATE uz/1d/36 REPORT MONTH January 1996 COMPLETED BY.
x.
A.
nilliams TELEPHONE tius;-se2-334o (1)
(2)
(3)
(4)
(5)
R MET-E HOD T
A OF LICENSE M
Y S
SHUT EVENT SYS-CAUSE AND CORRECTIVE-O P
DURATION O
DOWN REPORT TEM COMPONENT ACTION TO DATE E
HOURS N
R/X NO.
CODE CODE PREVENT RECURRENCE NO SHUTDOWNS OR REDUCTION S (1)
(2)
(3)
(4)
F-Forced Reason-Method:
Exhibit G - Instructions S Scheduled A-Equihment Failure (Explain) 1-Manual for Preparation of, Data B-Maintenance or test 2-Manual Scram Ent y Sheets For Licensee C-Refueling 3-Automatic Scram Event Report (LER
( M EG-0161))
D-Regulato n Restriction 4-Other (Explain)
File E-Operator Training & License Examination F-Administrative (5)
(Explain) (Explain)
Exhibit I - Same Source G-Operator Error H-Other
,(
i i
DOCKET: 50-370 UNIT: McGuire 2 Date:
02/15/96 I
i 6
NARRATIVE
SUMMARY
3 MONTH: January,1996 McGuire Unit 2 began the month of January operating at 100% full power. The unit operated at or near 100% full power for the entire month.
I i
l I
i I
i I
Prepared by: R. A. Williams Telephone: (704)- 382-5346 '
MONTilLY REFUEL ING INFORMATION REOUEST 1.
Facility name:
McGuire. Unit 2 2.
Scheduled next refueling shutdown: April 1996 3.
Scheduled restart following refueling: May 1996 Tile PROJECT MANAGER IIAS BEEN ADVISED BY SEPARATE COMMUNICATION OF ANY T.S. CilANGE OR LICENSE AMENDMENT. TilEREFORE, QUESTIONS 4 TIIROUGli 6 WILL NO LONGER BE MAINTAINED IN Tills REPORT.
4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
r if yes, what will these be?
If no, has reload design and core configuration been reviewed by Safety Review Committee regarding unreviewed safety questions?
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
6.
Important licensing considerations (new or different design or supplier, unreviewed design or performance analysis methods, significant changes in design or new operating procedures).
7.
Number of Fuel assemblies (a) in the core: E (b) in the spent fuel pool: M 8.
Present licensed fuel pool capacity: L4fd Size of requested or planned increase: --
9.
Projected date oflast refueling which can be accommodated by present license capacity:
December 2001 DUKE POWER COMPANY DATE: Ecbruarv 15.1996 j
Name of
Contact:
R. A. Williams Phone: (704)- 382-5346