gO 7/-fs/f RETURN.TO 396-SS as weear er,ergy wrrsaca,vn wxtay dt#WM [ S'(fC (( W7 PU Su732 W,"y 7 NC2M0?
s' w ! w February 9, 1988 a
V) 8%/c s
\\
Mr. Cnarles E. MacDonald, Chief 2- (c #
7 8
t Transportation Certification Branch Z
C 8
[8
[k.
Division of Fuel Cycle & Material Safety f
U.S. Nuclear Regulatory Commission p
Washington, D.C.
20555 h[ISTT1fhg<p
Dear Mr. MacDonald:
N 1
Subject:
NRC Certificate of Compliance USA /9019/AF G
a
References:
- 2) Application from TP: Winslow to CE MacDonald dated
/
3) t from CE MacDonald TP Winslow dated occtato (9
6/18/86 I
UCG V
2 7/11/86 9;
[
M-j$~.cs 12/22/86 rt' c tti jd
0'%
O
)
In your December 11, 1987 letter you identified additional information needed by your office in order to complete the review of the above referenced application as supplemented.
The information you requested has been incorporated as page changes j
to Section 5.0 and Section 6.0 of the application (Attachment 1 to this letter).
Since the changes effect most of these sections' pages, new Sections 5.0 and 6.0 are being provided in their entirety and are identified as Revision 3, 2/09/88.
l The following is the information requested in your letter dated 12/11/87, and our corresponding response with reference to where the page changes were made within Section 5.0 8802230256 980209
~C
{i } ! ('['[-- )
<M7,1 F g'j
{DR ADOCK 071 9
L-g V%'.b'E 2
O Mr. Charles E. MacDonald February 9, 1988 Page 2 NRC Request GE Response "1.
The last item under Section The last item in'Section 5.1.2 5.2.1' (5.1.2) should be has been changed to exclude the revised to explicitly gasket surface from having any exclude the gasket surface rust spots, from the criteria accepting rust spots no larger than one square inch."
"2.
Should add a statement to A new fourth item in Section Section 5.1.2 regarding 5.1.2 has been added regarding gasket inspection and gasket inspection and acceptanca acceptance criteria."
criteria.
"3.
The instruction under The third item in Section 5.1.4 Section 5.1.4 should also has been changed to include a state a maximum torque maximum torque requirement, requirement to preclude failure due to over-torquing."
"4.
Section 5.1.4 should An eighth item in Section 5.1.4 contain a statement has been added to include the indicating compliance with requirements of 10 CFR 71.89.
The following are additional changes that hsve been made in order to be consistent with the above NRC requests.
1.
The third item in Section 5.1.2 has been changed to prohibit rust spots on the inner drum gasket surfaces.
2.
The third item in Section 5.3.2 has been changed to prohibit rust spots on the inner drum gasket surface, l
3.
The last sentence of the fourth item in Section 5.3.2 has been rewritten to assure the gasket on the BU-7's inner container is changed before being allowed to be shipped if that gasket is over 12 months old.
I i
4.
GE Licensing Drawing 112D1592, Revision 6, Note:
8, identifies the minimum torque for the inner container closure bolts.
Revision 7 of this drawing is provided adding the maximum allowable torque to Note:
8.
See Attachment 1, Section 6.0, i
Appendix A.
\\
Mr. Charles E.
MacDonald February 9, 1988 Page 3 i
In our 9/29/87 submittal, we identified a 1/16" stainless steel identification plate that will be riveted to the outside surface of the BU-7 shipping container.
Once the NRC Certificate of Compliance is issued incorporating this feature, we anticipate needing six months to install this plate on BU-7s scheduled for shipment.
We
. request the certificate include a statement that the licensee shall have six months from the date of the certificate revision to attach the 1/16" stainless steel identification plates onto the outside surface of BU-7s scheduled for shipping.
Please contact me if you have any questions regarding this matter.
Sincerely, GE NUCLEAR ENERGY T.
Preston Winslow, Manager Licensing & Nuclear Materials Management
/sbm Attachment 2
- i
ATTA acm '1 PAGE CHANGES TO THE ORIGINAL 12/22/86 BU-7 SHIPPING
?ACKAGE SUBMITTAL.
THESE ARE REPLACEMENT PAGES TO SECTIONS 5.0, 6.0, AND APPENDIX A AND ARE IDENTIFIED AS REVISION 3, DATED 02/09/88.
l 5.0 OPERATING PROCEDURES, ACCEPTANCE TESTING AND MAINTENANCE i
l
- PROGRAM 5.1 OPERATING PROCEDURES The following procedures represent the activities involved in loading the BU-7 package.
i 5.1.1 Prior to placing the three or five gallon pails in the' BU-7's inner drum, the pails are inspected.
This inspection includes:
o Physical integrity (no holes, broken seals, or cracks) o No excessive rust o
Proper fitting lids o
No dents greater than 1/2 inch deep o
Unbroken tampersafe seals are in place 5.1.2 Prior to loading, BU-7 inner drums are inspected to assure:
o There are no visible cracks o
There is no visible moisture inside container o
Inner drum gasket surfaces are visibly clean, smooth j
and flat with no holes except bolt holes and with no i
rust spots LICENSE S!JM-1097 DATE 02/09/88 PAGE 3
DOCKET 71-9019 REVISION 3
o Gasket is in good condition and does not have any-defects, nicks, or cracks. Also, containers may not be shipped if the gasket on the inner drum has been in service for over 12 months.
o Inner drum is visibly clean, painted, and with no rust spots larger then 1 square inch o
Bolts or studs are in good condition o
Inner container cover is clean, flat, dry, painted, no rust spots larger than one square inch, Gasket surf ace visibly smooth ar.d flat with no rw.st spots.
5.1.3 Prior to loading BU-7, outer drums are inspected to assure:
o Exterior paint is in good condition o
Container is durably marked o
There are no visible holes, punctures, or cracks o
Closure rings and bolts are in goed condition o
The four 1/4 inch holes are covered from the inside j
with water-proof tape o
No visible dents greater than 1/2 inch deep i
o Phenolic Foam plug in good condition LICENSE SNM-1097 DATE 02/09/88 PAGE DOCKET 71-9019 REVISION 3.
o' outer drum cover in good condit1on with no-holes or cracks 5.1.4 BU-7 drums are packed as follows:-
o Three 3-gallon or two_5-gallon pails are placed inside inner drum o
Place gasket in position o
Bolt inner lid in position using a minimum torque of 12.5 ft. lbs. and a maximum torque must not exceed 22.0 ft. lbs.
o Insert insulation plug o
Install cover and secure closure ring with bolt and nut o
Affix tampersafing seal to the bolt o
The maximum weight of material per drum is verified.
Limits are based upon the quantities authorized by the certificate of compliance.
o Prior to delivery of a package to a carrier for transport, the licensee shall ensure that any special instructions needed to safely open the package have been sent to or otherwise made available to the consignee for the consignee's use in accordance with 10 CFR 20.205 titled "Procedures for Picking Up, i
j Receiving, and Opening Packages" (10 CPR 71.89).
LICENSE SNM-1097 DATE 02/09/88 PAGE l
DOCKET 71-9019 REVISION 3
- 1*7 -
5.2 ACCEPTANCE TESTING The following represent the tes'ts or inspections'that are performed prior to the first use of packaging:
5.2.1 Inspection Criteria Typical Typical Container Characteristic Inspection Specifications Phenolic Plug 15 lbs. minimum weight of plug r
Submerged bubble' pressure 15 PSIG minimum test for the inner container Leak tightness is verified by a submerged bubble pressure test at 15.0 PSIG, minimum.
Submersion time is one minute minimum.
Test is conducted using the silicone rubber container gasket as the only sealing agent, between flange and Cover.
Verification of Based on approved container measurements dimensions on licensed drawing Appearance integrity No visible holes or cracks, (Visual) and no significant absence of paint.
LICENSE SNM-1097 DATE 02/09/88 PAGE DOCKET 71-9019 REVISION 3 '
5.2.2 Failures are-rejected and,-where appropriate, reworked and retested.
5.3 MAINTENANCE PROGRAM 5.3.1 The BU-7 outer drum and cover are inspected to assure:
o Good adherence of paint o
No visible holes or cracks in the metal surfaces 9
o No dents which affect drum integrity o
closure rings and bolts are in good condition o
The four 1/4 inch holes in sides near top of drum are covered with weatherproof tape o
Phenolic foam insulation plug is in serviceable condition o
Container is appropriately marked 5.3.2 The BU-7 inner drum and lid are inspected to assure:
l o
Inner drum is visibly clean and painted o
Inner drum gasket sealing surface is clean, smooth and flat with no rust spots j
1 LICENSE SNM-1097 DATE 02/09/88 PAGE DOCKET 71-9019 REVISION 3.--__
o A new gasket is used, or the existing gasket is replaced with a new gasket if inspection shows any l
defects.
Inner drums sealed with gaskets that are 1
over 12 months old must have those gaskets changed before shipping.
o Threads are in good condition i
I o
There is no visible indication of holes 5.4 Replacement Schedules Containers, or their components.or subsystems, are replaced, on an as-needed basis, when they do not meet the inspection criteria.
5.5 Criteria for Repair of Components and Subsystems Outer container and inner container covers are replaced l
when they will not meet inspection criteria.
Inner gaskets are replaced every 12 months, or sooner if found damaged when inspected.
Phenolic foam insulation plugs are replaced if found damaged when inspected.
Damaged or deficient bolts and nuts are replaced at inspection during the packing process.
l l
l l
l 1
LICENSE SNM-1097, DATE 02/09/88 PAGE DOCKET 71-9019 REVISION 3 1
)
I
6.O BU-7 TRANSPORT-PACKAGE SPECIFICATIONS' P
Specifications for the BU-7 transport package are shown
[
on General Electric Drawing 112D1592 in Appendix A.
f i
A I
LICENSE SNM-1097 DATE 02/09/88 PAGE DOCKET 71-9019 REVISION 3 4
s 1
-t i
-4
.I
. APPENDIX A f
DRAWING 112D1592-7 "SHIPPING CONTAINER - MODEL BU-7" l
J 4
i 1
t 4
i 1
J t
a 4
1 i
LICENSE SNM-1097 DATE 02/09/88 PAGE j
DOCKET 71-9019 REVISION 3
A 1
2 m v
l 2
l l ll r l l
4 I
s i
II e
R IGI ail @ FliG 22 14
FLR #C lY,TUIAL5 E E2M MIFlGTim y. g AS pirlQ Ff GGP T)UT5 VL - 729 E rp. m A
DCT 17H,16 GAJ
~
CCRRX A110N REA gg7g,7,g7y M T 17.H, 12 SEE h01E I / 1/16 V FORGED LUGS, 5/8 IIA. BoL1
\\
B IIII I Z-(SEE f(TAIL 2 crit g.
(SEE D A L Z E D.2)
\\
/
j FOLA E u tLY stActo Ifc pig, yggy gggg3 i
hE AR IM, COVERED KITH hATERPR00F IAPE i
s 7/IE* DIA ThEJ 12 HDLES E0. 5 % ED ON A 15-3/P DIA. 3.C.
\\
Vip-C FLM2 41 (SEE ICTAIL hunt w I Mule m v II* b!A
+
e
- O E3 Jim (w? $
m r/ttfc
~
e y
~
I %E4 Ltc 3/16*Th!CK STL. rLATE 55 GALLok, I
p 18 EA2 sit.
{l 1
IIkilFICA110hPLAlEs/
1 1/16" STA!hlESS STEEL (SEE h0TES 5 A 6) v E
M$22
!%ER DRf.
16 GAL., 1; GASE
- SEE N;iE 2 STELL tR*f N
I
,spERTOBE
('. A 1: D cas wlmT: m us. m. tcA:ce Alf*o AvaVahle 0:
1
'Apwture Card I
r* -i--=-;
L --i 1___________
______1____________
,l l
7 l
0 ll ll 0 l l
GENER ALCILECTR:;
Il2Ol692
= wrzm r
.a
.n
,g C
i)7.D$(32 SW1PPI% C,0M%)NE.R-MODE.L BU l mo wm.
..u,
b b
/
a t.lcEMB1 N& DR AWih!G 6
J J
C0iiR blTH ChE
" THE PERIPHERY.
CLOSLtf Plh5 WITH CROP LLED CD IdPIAXD FOR I'
M WT. (SEE OTE 7) 1.
LEAK T!6HThESS 15 VERIFl[D BY A SUE.*LRSED BUBBLE PRESSURE TEST j
1 CONE rut!EP, CASKET KR AT 15.0 PSIG, MlhlMUM. TEST 15 C0hDUCTED USlhG THE SILIC0%E
- ES, CLASS 1. ca In, GRAX 50.
RulBER CONTAINER 6&ET AS THE ONLY SEAtlhG AGEhT. BEThtEn
~
ptog g; c37g, 9
2.
C0hYEXITY OF BOTTOM HEAD: 3/8* Mit 10 3/4' PAX.
3.
MIh!NM CAVITY DEPTH REC'JfRED TO ACCOMODATE PRODUCT CthTAlhERS.
g 6
4.
ALL FA!RICATION AO PACH!nl4G Dl'ik!!0h5 ARE hYlut UEESS ago CTHERWISE lOICATED.
4.25 5.
IXhTIFICATim PLATES TO EE RIVITED TO THE OUTER C0hTAthER WITH 1/8* EIA. STA!EIS! STEEL ElthD RistTS, SEALED WITH ROOM g
TEPPEPATUPi VULCMllikG, (RTV) 51LICME RUE!ER.
E.
PEP?A\\EnTLY PAPX BY ER5RAvlNG, ETChl%6 OR METAL STArp, USlh5 1/2' x l-1/2' x 3/I!* STEEL
.CAE H-9) 1/2* (P.Ih!M) CHARACTERS, PER 10 CFR 71.85 (c), THE FOLLOW!h; IhF0P?ATION.
.wtim (riat trt.f o-s tas, eta cu. n.)
GENEFAL ELECTPlt COMPMY m :r := am.mz wirw ace mwaa Wil'!h;TCh. hC, USA scirienim SP-9 cm As airic ev caer PCDEL EU-7
.=eWPEA.
USA / 9019 / AF PJX. CPOSS WElGHT 370 LIS.
7.
AFFIX TA?PER SAFE SEAL TO THE 5/8' EIA 20LT, PER THE
~
27.:D Pf0CIPEPEhTS OF 10 CFR 71.:.! (b).
~
n r>
8.
TOFQUE 5/IE* DIA.!hNER CONTA!KER BOLTS TO 150 INCH-POUCS O' 17-H, OP UTC PULE a Sct Vt 3 (MINIPt;M). PAX 17tJM TORQUE MJST NOT EXCEED 2(4 IKH-POUCS,
]
{-
L D M, h IF. Site tlA.
35.750 3.(25 i-Hri:m mitw Co.t= crr U
PRELIPlhApy 9
kRC APPROVAL Or ms;ca pfgggggg 88D2230266 0/
1.D. OF IME8 C0%T4thf R M S.
1/2 eia r,v-12 P.cs
/=a 13.75
/
/
\\ 2 PLes-lF AN' k
17* 0.D i.e.
\\
- 13. 5 p'
/'
5/15' - 18 STL BXT 5/IE*- STt hASHER 4j
EQUIPMEhi CLASS CCCE 1
~
4~-
~
/
,I q \\m
}
I i
- s. V z e m lM Stem.ursarA 4 no1 GM l
PrtN 720 Q( q. (,82, 4,3,, M-5 7 lJ.Z pas I d-#
4 IJ. A z.ede tsgJ ELA%M PECN "/J S
,'> K C N 6 9 7 M.fr.'
L5lJ 2. pas Ia1.
[ rem tm9 p.- A
'actim s tos) cy~L
- m. WQ.
- ~.*: 11701692.
Yt m *#;;'lu-
.. s-i.
SW3ML g
j f
l n
l isoI
-.nu to l
I art u
~
m