ML20149J814

From kanterella
Jump to navigation Jump to search
Forwards 36 Oversize Drawings for Third 10-yr IST Program for SR Pumps & Valves Inadvertently Omitted from 970430 Submittal
ML20149J814
Person / Time
Site: Calvert Cliffs  
Issue date: 07/23/1997
From: Cruse C
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20149J816 List:
References
NUDOCS 9707290111
Download: ML20149J814 (40)


Text

.

o CHARLES II. CRU$E Baltimore Gas and Electric Company Vice President Calvert Cliffs Nuclear Power Plant Nuclear Energy 1650 Calvert Cliffs Parkway Lusby, Maryland 20657 410 495-4455 July 23,1997 U. S. Nuclear Regulatory Commission Washington, DC 20555 ATTENTION:

Document Control Desk

SUBJECT:

Calvert Cliffs Nuclear Power Plant Unit Nos.1 & 2; Docket Nos. 50-317 & 50-318 Unit 2 Drawings for the Third Ten-Year Inservice Test Program for Safety-delated Pumns and Valves

REFERENCES:

(a)

Letter from Mr. C. H. Cruse (BGE) to NRC Document Control Desk, dated April 30,1997, " Third Ten-Year Inservice Test Program for Safety-Related Pumps and Valves" (b)

Letter from Mr. C. H. Cruse (BGE) to NRC Document Control Desk, dated March 18,1997, " Notification of Extension of the Inservice Test and Inservice Inspection Program Second Ten-Year Intervals" We inadvertently omitted the enclosed Unit 2 drawings from our April 30,1997 letter (Reference a).

Also note that there was an error in a reference listed in the April 30,1997 letter. The correct reference information is as shown in Reference (b) above. Reference (b) was submitted on March 18,1997, not on October 30,1996 as shown in the April 30,1997 letter. We regret any confusion this may have caused.

Should you have questions regarding this matter, we will be pleased to discuss them with you.

g Etii Very truly yours, g

Biiiiii 9707290111 970723

/

m7g;:"

PDR ADOCK 05000317 i

P PDR EE*

p gp AC#p CHC/JMO/ dim

/

Attachment:

(1)

Drawings for the Third Ten-Year Inservice Testing Interval Program for Calvert Cliffs Nuclear Power Plant Unit 2 cc:

(Without Enclosure to Attachment 1)

/

R. S. Fleishman, Esquire Resident Inspector, NRC

_h/,

/

l J. E. Silberg, Esquire R. I. McLean, DNR Director, Project Directorate I-1, NRC J. H. Walter, PSC r*,m H. J. Miller, NRC A. W. Dromerick, NRC

'~v0009 Rcwww s IOc sMd l a CLi )i/ Al l$/h i a

~

4 i

ATTACHMENT (1) i i

i t

i i

i l

i LIST OF DRAWINGS FOR TIIE TIIIRD TEN-YEAR INSERVICE TESTING INTERVAL t

PROGRAM PLAN FOR l

CALVERT CLIFFS NUCLEAR POWER PLANT i

j UNIT 2 4

I i

1 Baltimore Gas and Electric Company July 23,1997 i

v-ATTACHMENT (1)

LIST OF DRAWINGS FOR Tile TillRD TEN-YEAR INSERVICE TESTING INTERVAL PROGRAM FOR CALVERT CLIFFS NUCLEAR POWER PLANT UNITS 1 AND 2 UNIT 2 DRAWINGS Operations & Maintenance BGE Drawing System (s)

Drawing Number Number OM-036 Sheet 1 62700 Sheet 1 Main Steam OM-040 Sheet 4 62702 Sheet 4 Feedwater OM-047 Sheet 2 62706 Sheet 2 Service Water OM-056 Sheet 2 60714 Sheet 2 Fire Protection OM-058 60716 Spent Fuel Pool OM-059 Sheet 1 60717 Sheet 1 Auxiliary Feedwater OM-065 Sheet 1 60723 Sheet 1 Containment Ventilation OM-065 Sheet 2 60723 Sheet 2 Containment / Containment Ventilation OM-066 Sheet 1 60724 Sheet 1 Component Coolmg/ Primary & Post-Accident Sampling /Reacior Coolant OM-066 Sheet 3 60724 Sheet 3 Primary & Post-Accident Sampling OM-068 60726 Nitrogen OM-069 Sheet 1 60727 Sheet 1 Service Water OM-069 Sheet 3 60727 Sheet 3 Service Water OM-076 Sheet 2 60733 Sheet 2 Plant Drains OM-076 Sheet 4 60733 Sheet 4 Plant Drains OM-077 Sheet 1 60734 Sheet 1 Liquid Waste OM-077 Sheet 3 60734 Sheet 3 Extraction Steam OM-078 Sheet 1 60735 Sheet 1 Waste Gas OM-098 Sheet 1 60738 Sheet 1 Area Radiation Monitoring OM-450 Sheet 2 62708 Sheet 2 Saltwater OM-452 Sheet 1 62710 Sheet 1 Component Cooling OM-452 Sheet 2 62710 Sheet 2 Component Cooling OM-454 Sheet 3 62712 Sheet 3 Instrument Air OM-460 Sheet 1 62729 Sheet 1 Demineralized Water / Reactor Coolant OM-461 Sheet 1 62730 Sheet 1 Chemical & Volume Control OM-461 Sheet 2 62730 Sheet 2 Chemical & Volume Control OM-461 Sheet 3 62730 Sheet 3 Chemical & Volume Control OM-462 Sheet 1 62731 Sheet 1 Safety injection / Containment Spray OM-462 Sheet 2 62731 Sheet 2 Safety injection / Containment Spray OM-462 Sheet 3 62731 Sheet 3 Safety Injection / Containment Spray OM-463 Sheet 1 60744 Sheet 1 Gas Analyzing OM-463 Sheet 2 60744 Sheet 2 Gas Analyzing OM-465 62749 Service Water / Steam Generator Blowdown OM-479 Sheet 2 60746 Sheet 2 Plant Air OM-479 Sheet 3 60746 Sheet 3 Plant Water OM-801 62583 Auxiliary Feedwater/ Main Steam 1

, ~. _. _. _.. _

ENCLOSURE TO ATTACHMENT (1) 1 DRAWINGS FOR THE THIRD TEN-YEAR INSERVICE TESTING INTERVAL PROGRAM PLAN FOR CALVERT CLIFFS NUCLEAR POWER PLANT i

i UNIT 2 i

i i

i l'

i i

Baltimore Gas and Electric Company

,1 July 23,1997 i

}

i i

DOCUMENT l

PAGE(S) PULLED 1

l mmmmmmmmmmmmmmmmmmmmmmmmmme i

i l

SEE APERTURE CARD FILES I

APERTURE CARD / PAPER COPY AVAILABLE THROUGH NRC FILE CE l

                                                                                                                                        • NTER

\\

l

                                                                                                                        • (S) $h NUMBER OF OVERSIZE PAGES FILMED ON APERTURE CARD l

ACCESSION NUMBERS OF OVERSIZE PAGES:

1 b

i

,