ML20149J767
| ML20149J767 | |
| Person / Time | |
|---|---|
| Site: | Browns Ferry |
| Issue date: | 02/12/1988 |
| From: | Zech G NRC OFFICE OF SPECIAL PROJECTS |
| To: | |
| Shared Package | |
| ML20149J770 | List: |
| References | |
| NUDOCS 8802230210 | |
| Download: ML20149J767 (15) | |
Text
_____ __ _______________ - _____
e f***%c g..
UNITED STATES y
iW g
NUCLEAR REGULATORY COMM!SSION g
.j WA$N NG TON, D. C. 205$5 V...../
l l
TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-259 BROWNS FERRY NUCLEAR PLANT, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 144 License No. DPR-33 1.
The Nuclear Regulatory Comistion (the Comission) has found that:
A.
The application for amendaent by Tennessee Valley Authority (the licensee) dated August 28, 1985 as supplemented April 7, 1986, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (tle Act), and the Comission's rules and regulations set forth in '0 CFR Chapter I; B.
The facility will operate in confomity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assuraece (i) that the activities authorized by this amendment can be condt.cted without endangering the heal"h and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; 0.
The issuance of this amendment will not be inimical to the comen i
defense and security or to the health and safety of the public; and i
E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
3 3802230210 880212 PDR ADOCK 0500 9
P
. 2.
Accordingly, the license is acended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Facility Operating License No. DPR-33 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.144, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of its date of issuance and shall be implemented within 60 days from the date of issuance.
FOR THE NUCLEAR REGULATORY C0tiMISSION
)
W d
Gary Zech, Assistant Director for Projects TVA Projects Division Office of Special Projects
Attachment:
Changes to the Technical Specifications Date of Issuance: February 12, 1988 i
l
a ATTACHMENT TO LICENSE AMFNDMENT N0.144 FACILITY OPERATING LICENSE NO. DPR-33 DOCKET NO. 50-259 Revise the Appendix A Technical Specifications by removing the pages identified below and inserting the anclosed pages.
The revised pages are identified by the captioned amendment number and contain marginal lines indicatino the area of change. Overleaf pages* sre provided to ma'intain document completeness.
REMOVE INSERT 3.2/4.2-46 3.2/4.2-46*
3.2/4.2-47 3.2/4.2-47
E$=
n TABLE 4.2.8 (Continued)
SURVElttANCE R[QUIRLftNIS FOR INSIRUPENIAll0N IMI INiilAIE OR CONIROL If E CSCS Function Functional Test
_ Calibration Instramw'nt Clw ck Instrument CNnnel -
(1) once/3 months noe feH hmp Discharge Pressure Ins *.rument Channel -
(Il once/3 months s%.c Core Spray Pump Discharge Pressure Core Spray Sparger to RPV d/p (1) once/3 months once/ day Trip System Bus Power Monitor once/ operating Cycle N/A ncne Instrument Channel -
(I) once/3 months r.one Condensate Header low level (LS-13-56A, 8)
Instrument CNnnel -
(1) once/3 months nonc Suppression CNnber High tevel u
Instrument Channel -
(1) once/3 months osKc/d.ny "w
Reactor High Water level Instrument Channel -
(1) once/3 months nona y
RCIC furbine Stem Line liigh Flow Instrument Channel -
(I) once/3 months none RCIC Stem Line Space liigh Temperature BIN 4 kilt i N
3
'E 3-O N
En TABLE 4.2.B (Continued)
SURVEILLMCE REQUIRLft.Nis FOR IN51RtPLNIA110N llMI IN!!!AIE OR CONINOL IHL CSCS c.
Function functional Test Calibration Instriment Check Instrument Channel -
(I) once/3 samths none WCl turbine Steam Line High Ilow instrument Channel -
(I) once/3 months none HPCI Steam Line Space High Temperature Core Spray Systems Logic once/18 months (6)
N/A RCIC System tinitiating) Logic once/18 sonths N/A N/A RCIC System (Isolation) Logic once/18 months (6)
N/A WCl System (Initiating) Logic once/I8 months (6)
N/A WCl System (Isolation) Logic once/18 months (6)
N/A ADS Logic once/18 months (6)
N/A LPCI (Initiating) Logic once/18 samths
- 6)
N/A LPCI (Contaisement Spray) Logic once/18 months (6)
N/A Core Spray System Auto Initiation once/18 months (F)
N/A N/A
'f inhibit (Qwe Spe'ay Auto c-Initiation) u LPCI Auto Initiation Inhibit once/18 months (7)
N/A N/A (LPCI Auto Initiation)
BIN-Unit I N
R 4
p 8%g
,o1
,00, UNITFD STATES y
- e. <
g SYUCLE AR REGULATORY COMMISSION WASHING TON, D. C. 20555
,f TEM!ESSEE VALLEY AUTHORITY DOCKET NO. 50-260 BROWNS, FERRY NUCLEAR PLANT, UNIT 2 AMENDMENT TO FACILITY OPERATING LICENSE Arrendment No.140 License No. DPR-52 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The appl cation for amendment by Tennessee Valley Authority (the licensee) dated August 28, 1985 as supplemented April 7, 1986, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission s rules and regulatio1s set forth in 10 CFR Chapter I; B.
The facil ty will operate in conformity wi+.h the application, the provision; of the Act, and the rules and retlulations of the Comission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endargering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the comon defense and security or to the health and safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.
i
2-2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C.(2) of Facility Operating License No. DPR-52 is hereby amended to read as fellows:
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment Ne. 140, are hereby incorporated in the s
license. The licensee shifl1 operate the facility in accordance with the Technical Specifications.
3.
This license amendment is affective as of its date of issuance and shall be implemented within 60 days frcm the date of issuance.
i FOR THE NUCLEAR REGULATORY COMMISSION Gary G. Zech, Assistant Director for Projects TVA Projects Division Office of Special Projects
Attachment:
Changes to the Technical Specificatiens Date of Issuance: February 12, 1988 1
l y
y
--~g v--aw-
+- --,- -
ATTACHMENT TO LICENSE AMENDMENT NO.140 FACILITY OPERATING LICENSE NO. DPR-52 DOCKET NO. 50-260 Revise the Appendix A Technical Specifications by removing the pages identified below and inserting the enclosed pages.
The revised pages are identified. by the captforied amendment number and contain marginal lines indicatihg the area of change. Overleaf pages* are provided to maintain document completeness.
REMOVE ESERT 3.2/4.2-46 3.2/4.2-46*
3.2/4.2-47 3.2/4.2-47 h
c oo 3.2 IABLE 4.2.8 (Continued)
$URVEl;tANCE R[QUIREMLNIS IOR IN51HUMLNIAIION I.lAI INIIIATE OR CONIHOL 1HL CSC5 Function functional Test Calibration Instrisacnt Check Instrassent Channel (1)
Once/3 nionths none fem Pump Disclurge Pressure Instrssuent Channel (l)
Once/3 mionths none Core Spray 5%sup Discharge
~~
Pressure Core Spray Sparger to RPV d/p (I)
Once/3 mionths once/d.ny Irip Systein Bus Power Monitor once/operatirg Cycle N/A none Instrument Channel Condensate (1)
Once/3 mionths none Header Ltar Level Instrisment Channel (1)
%ce/3 months none Sugpression Chamber High Level Instrument Channel (1)
Once/3 months inc/ Liy Reactor High W Ler level u
Instrument Channel (1)
Once/3 sionths none RCIC Iurbine Stem Line liigh Flow u
Instrument Channel (1)
Once/3 months none RCIC Steam Line Soace 1:igh N
e Temperature e
llIN-Unit 2 N
a R
3 n
O.
m
c tn 3
'1 it3LE 4.2.B (Continued)
StmvEILLANCE REQUIRLE NIS FOR INSIRUMLNIAI10N llMI INIllATE OR 00NIROL IHE C5C5 Function functional Test Calibration Instnament Check Instrument Channel (1)
Once/3 months none IFCI lurbine Steam Llae High Flow Instrument Channel (1)
Once/3 months none HPCI Steami Line Sp u e Hi $
Tenperature Core Spray Systein Logic once/18 months (6)
N/A 9CIC System (Initiating) Logic once/18 months N/A N/A RCIC System (Isolation) togic once/10 months (6)
N/A IFCI Syst o (Initiating) togic once/18 months (6)
N/A IFCI Systein (Imlation) Logic once/18 months (6)
N/A ADS Logic once/18 months (6)
N/A LPCI (Initiating) Logic once/18 months (6)
N/A w
L LPCI (Contairunent Spray) togte once/18 months (6)
N/A w"
Core Spray System Auto Initiation.
Once/18 months (1)
N/A N/A
.y Inhibit (Core Spray Auto s-In h - iatlon) l LPCI Auto Initiation Inhibit once/18 months (7)
N/A N/A (LPCI Auto Initiation) g SIN-Unit 2 s
'Ee G
c)
pa crag
/
g UNITED STATES y
- (
p, NUCLE AR REGULATORY COMMISSION I
s-l WASHINGTON, D. C. 20555 TENNESSEE VALLEY AUTHORITY DOCKET NO. 50-296 BROWNS FERRY NUCLEAR PLANT, UNIT 3 AMENDMENT TO FACILITY OPEpATING LICENSE i
Amendment No.115 License No. DPR-68 1.
The Nuclear Regulatory Comission (the Comission) has found that:
A.
The application for arrendment by Tennessee Valley Authority (the licensee) dated August 28, 1985 as supplemented April 7, 1956, complies with the standards and requirements of the Atomi:: Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The facility will operate in conformity with the r.pplication, the provisions of the Act, and the rules and regulations of the Comission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conoucted without ondangering the health and safety of the public, and (ii) that sue.n activities will be conducted in compliance with the Cor.ission'e egulations; D.
The issuance of this amendment will not be iiwical to the comon defense a..d security or to the health and safety of the public; and E.
The issuance of this amendmeat is 'in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied, i
5 h
' 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license arenoment and paragraph 2.C.(2) of Facility Operating License No. DPR-68 is hereby ar. ended to read as iollows:
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.115, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of its date of issuance and shall be implemented within 60 days from the date of issuance, FOR THE NUCLEAR REGULATORY COMMISSION (3
p 4c-Q Gary G.
ech, As'ITstant Director for Projects TVA Projects Division Office of Special Projects
Attachment:
Charges to the Technical Specifications Date of Issuance: February 12, 1988 i
i 1
ATTACHMENT TO LICENSE AMENDMENT NO.115 FACILITY OPERATING LICENSE NO. DPR-68 DOCKET NO. 50-296 1
Revise the Appendix A Technical Specifications by removing the pages identified below and inserting the er. closed pages.
The revised pages are identified, by the captioned amendment number and contain marginal lines indicatihg the area of change. Overleaf pages* are provided to maintain document completeness.
REMOVE IllSERT 3.2/4.2-45 3.2/4.2-45*
3.2/4.2-46 3.2/4.2-46 I
I
\\
9
9 E *n
^2 IARLE 4.2.8 (Cont *d) y SURVEllLANCE RLQUlHLfENIS FOR INSIHUMLNIAIION THAI INIIIAIC OR CONIHOL lit C5CS Iunction f_unctional lest Calibration Instrument Check Instrument Chaenel -
(1) once/3 months none feet hap Discharge Pressesre Instrument Channel -
(1) once/3 months none-Core Spray Pump Discharge Pressure Core Spray Sparger to RPV d/p (1) once/3 months once/ day Trip Systeen Bus Power Monitor once/ operating Cycle N/A none Instrument Channel --
(I) once/3 months none Condensate Header level (LS-F3-56A, 8)
Instrument Channel -
(1) once/3 months none 5sgression Chandser liigh level Instrument Channel -
(1) once/3 months once/ day y
Reactor High Idater level n
Instrument Channel -
(I) once/3 months none N
l' LCIC Turisine Stem Line liigh Flou j
instrument Channel -
(1) once/3 months nonc RCIC Stem Line Space High u
Temperature i
BIN 4hiit 3 3
a E;
w I
c tn 3
'2 1ARLE 4.2.8 (Cont'd)
,7 %
SURVEllLANa R[QUlfM M NIS FOR INSIHUMENIAI!ON IBMI INIIIAIE OR 00NINOL IHE CSCS f~ unction ftmctional Test Calibration Instrument Check Instriment Channel -
(1) ri.cc/3 m mths none IFCi Iurbine Steam Line High Flow Instrument Charnel -
(I) once/3 months none IFCI Steam Line Space High Temperature Core Spray System Logic once/18 months (6)
N/A RCIC System (Initiating) Logic ence/18 months N/A tuA RCIC System (Isolation) togic once/18 mmths (6)
N/A
!4'Cl System (Initiating) togic once/Id months (6)
N/A IFCI System (Isolation) Logic once/18 mmths (6)
N/A ADS togic once/18 monti:s (6)
N/A LPCI (Initiating) togic once/18 months (6)
N/A sa "o
LPCI (Contaimeent Spray) Logic once/18 months (6)
N/A N
to E
lifM-tinit 3 m
1 3
8 i
~
f 4
1 4.11 l
m
.m
-