ML20149J444

From kanterella
Jump to navigation Jump to search
Forwards Insp Rept 50-267/88-01 on 880101-31.No Violations or Deviations Noted
ML20149J444
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 02/19/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20149J445 List:
References
NUDOCS 8802230058
Download: ML20149J444 (2)


See also: IR 05000267/1988001

Text

. _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ ____ __ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _

.

'

i

s ,

!

'

In Reply Refer To:-

Docket: 50-267/88-01

FEB 19 m t

.

'

Public Service Company of Colorado  ;

"

ATTN: Robert 0. Williams, Jr. ,

Vice President, Nuclear

Operations

'

2420 West 26th Avenue, Suite 15c

Denver, Colorado 80211- .

!'

, Gentlemen:

This refers to the inspection conducted by Messrs. R. E. Farrell and +

,

P. W. Michaud of this office during the period January 1-31, 1988, of

activities' authorized by NRC Operating License DPR-34 for the Fort St. Vrain ,

'

Nuclear Generating Station and to the discussion of our findings with you and

other members of your staff at.the conclusion of the inspection.

Areas examined during the inspection included operational safety verification,

followup of NRC bulletin, licensee action on licensee event reports, core '

3 safety limit, monthly surveillance observation, monthly maintenance

observation, radiological protection, and monthly security observation. Within

these areas, the inspection consisted of selective examination of procedures

and representative records, interviews with personnel, and observations by the

inspector. The inspection findings are documented in the enclosed inspection

'

report, j

I Within the scope of'the inspection, no violations or deviations were

identified.

Should you have any questions concerning this inspection, we will be pleased to ,

discuss them with you.

Sincerely, ,

,

i,. Origlaal Sigacd By,

L. J. Callan, Director r

Division of Reactor Project

Enclosure: (see next page)  ;

'

'

l

i

l

'

4f%

RIV: SRI

4f#

RI PS/8 T D:DRP

Q  ;

l

REFarrell/ld PWMichaud TFWesterman allan [

s lo c /88 2. /t UB8 in / j(,/88 f(/88

i

'

$8g22a gegoj7 JE o I j

G -

7

. - . - -. _ _ _ _ . . . _ _.._ .__ ,. _ ._

. - _ _ _ _ _ _ _ _ _ _ _ _ - _ . _ _ _ . _ _ - .

_ _ _ _ - . _ _ _ _ _ _ _ _ _ _ _ _ . _- -_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

- _ - - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _

$ ,

Public Service Company of Colorado -2-

Enclosure:

Appendix - NRC Inspection Report

50-267/88-01

cc w/ enclosure:

Manager, Nuclear

Production Division

Fort St. Vrain Nuclear Generating Station

16805 WCR 19 1/2

Platteville, Colorado 80651

P. Tomlinson, Manager, Quality

Assurance Division

(Same Address)

Colorado Radiation Control Program Director

Colorado Public Utilities Commission

bec to DMB (IE01)

bcc distrib. by RIV:

  • D:DRP R. D. Martin, RA
  • RRI DRSP
  • Section Cn.ef (RS/B) *RIV File
  • Section Chief (RSB/ES) *R&SPB
  • RSTS OPERATOR * MIS System
  • RSB * Project Inspector
  • D Weiss, RM/ALF *W. Beach
  • w/766

,