Text
t occoo***********************************************************************'
UNIT 1 i
OPERATING DATA REPORT cocco***********************************************************************
Docket No. 50-317 February 15, 1988 Prepared by C.Behnke Telephone:(301)260-4871 OPERATING STATUS
~~~~~~~~~~~~~~~~
F
- 1. UNIT NAME Calvert Cliffs Unit 1
- 2. REPORTING PERIOD JANUARY 1988 3.
LICENSED THERMAL POWER (MWT) 2700
- 4. NAMEPLATE RATING (GROSS MWe) 918 5.
DESIGN ELECTRICAL RATING (NET MWe) 845
- 6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 860
- 7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 825
- 8. CHANGE IN CAPACITY RATINGS none
- 9. POWER LEVEL TO WHICH RESTRICTED n/a
- 10. REASONS FOR RESTRICTIONS n/a Cumulative This month Year-to-Date to Date
- 11. HOURS IN REPORTING PERIOD 744 744 111,637
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 744.0 744.0 87,131.2
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 3,019.4
- 14. HOURS GENERATOR ON LINE 718.4 718.4 85,171.3
- 15. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY OENERATED (MWH) 1,876,265 1,876,265 213,950,983
- 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 632,079 632,079 70,847,791
- 18. NET ELECTRICAL ENERGY GENERATED (MWM) 605,596 605,596 67,641,557
- 19. UNIT SERVICE FACTOR 96.6 96.6 76.3
- 20. UNIT AVAILABILITY FACTOR 96.6 96.6 76.3
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 98.7 98.7 73.5
- 22. UNIT CAPACITY FACTOR (USING DER NET) 96.3 96.3 71.7
- 23. UNIT FORCED OUTAGE RATE 3.4 3.4 10.1
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):
April 8, 1988, Refueling shutdown for 48 days.
- 25. IF SMUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:
N/A Note: Line 21 "Cumulative" factor uses a weighted average.
i AM 8802230013 880131 PDR ADOCK 05000317 l
R DCD
l AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-317 Calvert Cliffs Unit No. 1 February 15, 1988 Completed by C.
Behnke Telephone: (301) 260-4871 JANUARY 1988 Average Daily Power Level Average. Daily Power Level Day (MWa-Net)
Day (MWe-Net) 1 870 17 875 2
847 18 877 3
854 19 875 4
869 20 874 I
5 869 21 857 6
870 22 846 7
872 23 846 8
869 24 845 9
872 25 844 10 872 26 843 11 873 27 844 12 873 28 844 13 874 29 823 14 874 30 0
I I
i 15 874 31 234 16 876 i
i J
I l
J
~.
IINIT SINTI1MMtS AM) 11MIR RIINKTIONS IIllCKIT MI. 50-317 gggy m., Calvert Cliffs U-1 Iwli February 15, 1988 O M'lJ M])IlY C. Behnke-RI'.11RT PSWill JANUAlty 1988
.IV.II.I'lIllNI; (301) 260-4871
.o C
O O
c-es oup C
om c
co 1.ie caisev E
0*n C;isese & Cens s ect.i ve 0
-at O
"U
- e r3 0 -t C O As t,awi i es 4>
oo&
l.ves el u0 O'o i
Nei.
lkit e 9,.
s to to c p cd H
h 0
- U R* *I" 1. //
>. o o
Isi ve,it. Ree : si in e-oc y.c g:
en u d-
- s. uo.s u
0 88-01 880130 F
25.6 11 N/A N/A IIJ PJPEXX Itemoved from grid to effect repair
,of' leak on high pressure turbine extraction piping.
4 I
M ttwMI:
l' AI'il8 i 8 ' ( 18'St '1'CI i e "'M l:
l4,,ce,I Reamni:
A-l elis i nnevil l'.ii l'.se (l'.xlel;iiii) 1 -Kieu nal l' ens l*si paa at.iewi eil'. I Ant a
.s: S lu slielcul i
ll-niisit ceiain c ese Te-st, 2-Mesuial N'e*:i'n, l'ait. y % < 1.s l' ens-I.ie caise-C-Rel'e sel i nin
^
3-Asel ennat,ic N ;uw.
liv csil. H elpen l.
(f.lR) Iile ll-Regalat.eir y Re st. irl.iews 4-tH IM r- (Ihplaisi)
(NtRIM-Olbf) 1;-fign al os Te aisiirig & l.ie esiw* INamisia*. osi l>- Asimissist.r at.i ve 5 ' thliiliit. I
.%w.%iew c f ut n al.iennial I~.rsue (l..spla.nes) i II-01In e- (l;xplaise)
L
-v.
w-n
,.,.nw w.
..n-
,w,-
7 w,
y.e.,.
n.
---s-4-
,e-,
e.-,
e
,,4,
. ~
s Surnary of U-l Operating Experience January 1988 1/1 Unit began this reporting period at 100% reactor' power and (860 MWe).
At 2200, power was reduced to 840 MWe to allow Fuel Management to conduct moderator temperature coefficient determination.
1/3 At 1555, returned to full reactor power.
1/21 At 0600, reduced power to 840 MWe to remove moisture separator reheaters from service.
This was to prevent further damage to No. 11 MSR tube bundles and/or divider plates.
1/29 At 2146, commenced power reduction to repair steam leak at high pressure turbine extraction pipe.
1/30 At 0222, Unit was removed from main grid.
1/31 At 0400, paralleled Unit to main grid.
The Unit ended this reporting period at 95% power and escalating to 974.
February 4, 1988 REWELING.. INPDRMATION REQUEST 1.
Name of facility: Calvert Cliffs Nuclear Power Plant, Unit No. 1.
2.
Scheduled date for next refueling shutdown: April 8, 1988 3.
Scheduled date for restart following refueling: May 26, 1988 4.
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of the plant with a fresh reload batch and reshuffled core for unit l's first 24 month cycle.
5.
Scheduled date(s) for submitting proposed licensing action and supporting information.
February 17, 1988 6.
Important licensing considerations associated with the refueling.
Reload fuel will be similar to that reload fuel inserted into Calvert Cliffs Unit 2 Eighth cycle except for four lead demonstration arsemblies manufactured by Advanced Nuclear Fuels.
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
(a) 217 (b) 1138 Spent fuel pools are common to Units 1 and 2.
8.
(a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies.
(a) 1830 (b) 0 i
9.
The projected date of the last refueling that can be oischarged to the j
Spent Fuel Pool assuming the present licensed capacity and maintaining 1
space for one full core offload.
April, 1991 1
1
ococc*********************************w*********(ea*************************
UNIT 2 OPERATING DATA REPORT ococc***********************************************************************
Docket No. 50-318 February 15, 1988 Prepared by C.Behnke Telephone:(301)260-4871 OPERATING STATUS
~~~~~~~~~~~~~~~~
- 1. UNIT NAME Calvert Cliffs Unit 2
- 2. REPORTING PERIOD JANUARY 1988 3.
LICENSED THERMAL POWER (MWT) 2700
- 4. NAMEPLATE RATING (GROSS MWe) 918
- 5. DESIGN ELECTRICAL RATING (NET MWe) 845
- 6. MAXIMUM DEPENDABLE CAP'Y (GROSS MWe) 860
- 7. MAXIMUM DEPENDABLE CAP'Y (NET MWe) 825
- 8. CHANGE IN CAPACITY RATINGS none 9.
POWER LEVEL TO WHICH RESTRICTED n/a
- 10. REASONS FOR RESTRICTIONS n/a Cumulative This month Year-to-Date to Date
- 11. HOURS IN REPORTING PERIOD 744 744 94,992
- 12. NUMBER OF HOURS REACTOR WAS CRITICAL 732.0 732.0 78,575.8
- 13. REACTOR RESERVE SHUTDOWN HOURS 0.0 0.0 1,296.6
- 14. HOURS GENERATOR ON LINE 728.2 728.2 77,409.8
- 13. UNIT RESERVE SHUTDOWN HOURS 0.0 0.0 0.0
- 16. GROSS THERMAL ENERGY GENERATED (MWH) 1,926,204 1,926,204 195,266,868
- 17. GROSS ELECTRICAL ENERGY GEN'TED(MWH) 656,615 656,615 64,544,716
- 18. NET ELECTRICAL ENERGY GENERATED (MWH) 629,690 629,690 61,620,748
- 19. UNIT SERVICE FACTOR 97.9 97.9 81.5
- 20. UNIT AVAILABILITY FACTOR 97.9 97.9 81.5
- 21. UNIT CAPACITY FACTOR (USING MDC NET) 102.6 102.6 78.6
- 22. UNIT CAPACITY FACTOR (USING DER NET) 100.2 100.2 76.8
- 23. UNIT FORCED OUTAGE RATE 2.1 2.1 5.5
- 24. SHUTDOWNS SCHEDULED OVER THE NEXT SIX MONTHS (TYPE, DATE AND DURATION):
February 26, 1988, Maintenance shutdown for 28 days.
- 25. IF UNIT IS SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF START-UP:
N/A Note: Line 21 "Cumulative" factor no longer uses a weighted average.
l AVERAGE DAILY UNIT POWER LEVEL Docket No. 50-318 Calvert Cliffs Unit No. 2 February 15, 1988 i
Completed by C. Behnke Telephone (301) 260-4871 JANUARY 1988 Average Daily Power Level Average Daily Powsr Level Day (MWe-Net)
Day (MWe-Net)
~~-----------------------------------------~~~----------
1 877 17 868 2
876 18 869 3
875 19 868 4
874 20 868 5
874 21 867 6
674 22 343 7
864 23 636 8
873 24 871 9
873 25 871 10 872 26 871 a
11 871 27 871 12 670 28 872 13 870 29 872 l
14 870 30 869 j
s 15 870 31 872 l
1 l
16 869 1
I I
i
. l
IINIT SiltrI1X)WNS AND l'tMI]( RI1MJCTIONS INXVIT NO.
50-318 IINIT NAF9'. Calvert Cliffs U 2 11A11-; February 15, 1988 OIMI*IE113) IlY C. 15chnke RI-:11N{T PS)ffill JANUAltY 1988 I13.El'lIONE (301) 260-4871 l
I L
w o
o Ce ra o tf6 o c
3g
,cg 1.i rce w v g
g*Q Caense & Ceuerrt.ive c
Nee.
Dat e b
u3 ouo I.ve sit uo t
Art ines t o nO n
rue
,' y o
H 43 y
y]
Rel= ort. #
u l*re vesit. Re a norsviu e-gg b
n us s u
0 88-01 880122 F
15.8 H
3 88-02 Cti INSTRU Trip on low steam generator water level. This was induced by the opening of circuit breaker 52-l 20429 due to a fault in the com-puter inverter's dummy load test.
Corrective Action:
- 1. Maintenance electricians' review of events Iceding to trip.
- 2. Design review of coordination of breaker / fuse timing.
- 3. Increase the use of special procedures for complex trouble-shooting.
I l:
l'oe rcel iterisen s :
M t luxt:
3:sisilsi8 G-Inst si'r8 i'ais A-lipsi mu nl l'ailsne (1:spl a i n )
1 - Ftis u aa l l'a n l'orIn.as at ia nt "I' Ilat a S: Seluwleelcol l
ll FLiint cruuur os-1 cst.
2 4tunial Scram.
list ry Slicet.s l'or !.is ruse C-Itci'ep l isin 3-Anst e nnat ic Scram.
1;tenit Helwis t-IllRI I ile-D - P,cgis l a t ory Resi r i e t. i on s 4 (M lier- (lislalaiss)
( NIIRI G-O l te l )
I:-t h= s al es: Training: & l.ircisse l'.sami nal. i e n e l'- Asieni n i st.s.it. i ve
'i I 'I'II"I I ~ N# "" ' S' '" ' ' "
G ahn s at.iews.il 1:rae.c (l.splain) 11-01Iw s- (I:splaisi)
L n
Summary of U-2 Operating Experience January 1988 1/1 Unit began this reporting period at full power (860 MWe).
f 1/7 At 1500, reduced reactor power to 90% to remove No. 26 Circulating Water Pump from service.
A faulty connection at temperature element for thrust bearing gave the computer a false signal, the high temperature caused the Centrol Room to stop tha pump.
At 1800, returned to full reactor power.
1/22 At 1000, reactor trip on low steam generator water level.
This was induced by the opening of ekt bkr 52-20429 due to a fault in the computer invertor's dummy load test.
At 2300, reactor critical.
i 1/23 At 0147, Unit paralleled to Main Grid.
At 1200, Unit at full reactor power.
1/31 Unit end this cycle at full reactor power.
I l
i 4
.l 1
i 4
-r
~
-e
6 February 4, 1988 REWELING IN MRMATION REQUEST 1.
Name of facility: Calvert Cliffs Nuclear Power Plant, Unit o.
2.
2.
Scheduled date for next refueling shutdown: April 1, 1989 3.
Scheduled date for restart following refueling: May 15, 1989 4
Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?
Resumption of operation after refueling will require changes to Technical Specifications. The changes will be such as to allow operation of t.he plant with a ficah reload batch and reshuffled core.
5.
Scheduled date(s) for submiteing proposed licensing action and supporting information.
February 9, 1989 6.
Important licensing considerations associated with the refueling.
Reload fuel will be similar to that reload fuel inserted into the previous j
cycle.
7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool.
i (a) 217 (b) 1138 Spent fuel pools are common to Units 1 and 2.
}
t 8.
(a) The present licensed spent fuel pool storage capacity, and (b) the size of any increase in licenseo storage capacity that has been requested or is planned, in number of fuel assemblies.
1 (a) 1830 (b) 0 4
9.
The projected date of the last refueling that can be discharged to the l
Spent Fuel Pool assuming the present licensed capacity and maintainin5 space for one full core offload.
April, 1991 i
4 k
l l
i
s I
oAs AND ELECTRIC W#
OX W5.B.RW CHARLES CENTER < P. O. B February 16, 1988
. LguQN3
$marusut y Commission
. Nuclcar Regulator 20555 rt Cliffs hington, D.C.
Control Deskta Reports for Calve 50-318)
Document January Operating Dakets 50-317 and l'ENTION:
Units 1 and 2 (Doc
.BJECT:
required by to you as cntionen:
are being sent 9 1 6.
Carl Behnke, cubject reports contact rechnical specification 6any questions, pleas e
Cho are If there260-4871 Sincerely, (301)
[
f M
I ons Depa N Pe Manager-Nuclear i
JRL/CB/jaf Enclosures W. T. Russell (NRC) 3, A. McNeil (NRC) cci (NRC)
T. Foley (tmC)
T. Magette (DNR)
P. Ross D. ReillY (INPO)K. Gibbard (DOE) i K. Gromack (CE) i r
. - - - - -,