Forwards Insp Rept 50-454/94-26 & 50-455/94-26 on 941129- 1220.Two Apparent Violations Noted.Enforcement Conference Scheduled for 950109 to Discuss Violations
ML20149J315
Person / Time
Site: Byron  Constellation icon.png
Issue date: 12/30/1994
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Graesser K
COMMONWEALTH EDISON CO.
Shared Package
ML20149J317 List:
References
EA-94-265, NUDOCS 9501050126
Download: ML20149J315 (3)


See also: IR 05000454/1994026

Text

.

_

.

.

.

December 30, 1994

.

Commonwealth Edison Company

ATTN: Mr. K. Graesser

,

Site Vice President

Byron Nuclear Power Station

4450 North German Church Road

Byron, IL 61010

SUBJECT: BYRON SPECIAL INSPECTION (REPORTS NO. 50-454/94026(DRS);

NO. 50-455/94026(DRS))

Dear Mr. Graesser

This refers to the special inspection conducted by Messrs. R. M. Bailey,

N. D. Hilton and R. C. Paul of the Regional Office between November 29 and

December 20, 1994. The inspection included a review of the activities

authorized for your Byron Nuclear Power Station facility. At the conclusion

of the inspection, the findings were discussed with those members of your

staff identified in the enclosed report.

Areas reviewed during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, and interviews with personnel. The purpose of the

inspection was to determine whether activities authorized by the license were

conducted safely and in accordance with NRC requirements.

Based on the results of this inspection, two apparent violations were

identified and are being considered for escalated enforcement action in

accordance with the " General Statement of Policy and Procedure for NRC

Enforcement Actions" (Enforcement Policy),10 CFR 2, Appendix C (1994).

The

apparent violations pertain to the licensee's discovery that no licensed

senior operator was in the common dual unit control room for a period of 22

minutes with a unit in power operations. The violations involve (1) failure

to maintain a licensed senior operator in the common dual unit control room

with a unit in other than cold shutdown or refueling in accordance with 10 CFR 50.54(m)(2)(iii); and (2) failure to record the occurrence in the operations

shift logs in accordance with Technical Specification 6.8.1.

Accordingly, no

Notice of Violation is presently being issued for these inspection findings.

In addition, please be advised that the number and characterization of the

apparent violations described in the enclosed inspection report may change as

a result of further NRC review.

An enforcement conference to discuss these apparent violations has been

!

scheduled for 2:00 p.m. (CST) on January 9,1995, at the Region III office.

The purpose of this conference is to discuss the apparent violations, their

'

cause and safety significance; to provide you the opportunity to point out any

errors in our inspection report; to pr6 vide an opportunity for you to present

I

9501050126 941230

PDR

ADOCK 05000454

i

PDR

G

~

fu6UC ~/ 2 O )

.

-

. - .

j

e

a

!

K. Graesser

2

December 30, 1994

your proposed corrective actions; and to discuss any other information that

L

will help us determine the appropriate enforcement action in accordance with

the Enforcement Policy.

You will be advised by separate correspondence of the

results of our deliberations on this matter. No response regarding the

I

apparent violations is required at this time.

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice", a copy of

l

this letter and its enclosure will be placed in the NRC Public Document Room.

I

!

Sincerely,

l

/s/ W. D. Shafer (for)

l

Geoffrey E. Grant, Director

Division of Reactor Safety

,

l

Docket No. 50-454

l

Docket No. 50-455

EA-94-265

Enclosures:

1.

Inspection Reports

No. 50-454/94026(DRS);

No. 50-455/94026(DRS)

2.

Persons Contacted

See Attached List

a receiwa a ce ar of this docummat. indie nte in the box

"C" - Cony

without attach /enel *E* = Co nw with attachlanel

"N* = No copy

b

0FFICE

RIII:DRS

d6

RIII:DRS

6*

RIII:DRP.

RIII:0I

6

NAME

Bailey:co W

TBurdick 3

LMiller b

RPaul k Y

DATE

12/19 /94

12/70/94

12/7394

12/ /94

- receive a copy o f th i s documeent , indicate to the boa

"C" = Copy without attachfenc1

"E" = Copy with attachfenci

"N" = No copy

0FFICE

RIII:N

6

RIII:N

E, RIII:M 6

NAME

Ring S h

' JNa##$.e[/// Mdh

ye

w-

6

l

DATE

12/fS/94

12/u/94

12/ /94

0FFICIAL RECORD COPY

_ _ .

-

_

_ _ . _ .

_

.__.._ _ _ ___ _ ___ _ _ _

.

.

Distribution:

Letter to K. Graesser. Dated:

December 30, 1994

cc w/encls: J. C. Brons, Vice President

Nuclear Support

K. A. Strahm, Vice President

PWR Operations

G. Schwartz, Station Manager

D. Brindle, Regulatory Assurance

Supervisor

D. Farrar, Nuclear Regulatory

Services Manager

Richard Hubbard

Nathan Schloss, Economist

Office of the Attorney General

State Liaison Officer, Wisconsin

State Liaison Officer

Chairman, Illinois Commerce

Commission

Terry L. Schmidt, Plant Training Manager

Distribution:

Docket File w/encls

RIII PRR w/encls

PUBLIC IE-01 w/encls

SRIs, Byron, Braidwood,

OC/LFDCB w/encls

Zion w/encls

DRP w/encls

LPM, NRR w/encls

DRS w/encls

IPAS w/encls

S. A Richards, OLB, w/encls

J. Lieberman, OE w/encls

J. Goldberg, OGC w/encls

R. Capra, NRR, w/encls

i