Forwards Insp Repts 50-245/87-33 & 50-336/87-29 on 871201-31 & Notice of Violation.Corrective Actions Noted in 871023 & 1120 Ltrs Verified
ML20149J049
Person / Time
Site: Millstone  Dominion icon.png
Issue date: 02/16/1988
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
Shared Package
ML20149J052 List:
References
NUDOCS 8802220251
Download: ML20149J049 (2)


See also: IR 05000245/1987033

Text

_ _ _ _ _ ._. .__ _ ._ _ __ _ . - _ _ _ _ _ - _ _ _ _

_ _ _ _ _ _ _ _ -

f

(, . -b

-.

f .

. FEB 161988

Docket Nos. 50-245; 50-336

Northeast Nuclear Energy Company

' ATTN: Mr. Edward J. Mroczka

Senior Vice President - Nuclear

Engineering and Operations Group

P~. O. Box 270

Hartford, Connecticut 06141-0270

Gentlemen:

Subject: Inspection 50-245/87-33; 50-336/87-29 (12/1-31/87)

This refers to the above subject resident inspection of Millstone 1 and 2 by

Mr. W. J. Raymond and Ms. L. M. Kolonauski of this office. The inspection results

are described in'the enclosed report and were discussed with Mr. S. E. Scace of

your staff.

Based upon inspection report 50-245/87-09 and additional review during this in-

spection, it appears that certain of your activities were not in full compliance

with NRC requirements, as specified in the Notice of Violation enclosed herewith

as Appendix A. The first violation involves not reporting the failure of multiple

automatic pressure relief (APR) system check valves in 1985. Based on review of

your letter dated November 20, 1987, operability of the APR valves has been accept-

ably addressed. Therefore, the response to this violation need only address the

actions necessary to preclude recurrence of the failure to report under 10 CFR

50.72.

The second apparent violation occurred during the Unit 2 steam generator outage

in January - February, 1987 when use of overtime was not controlled in accordance

with your administrative procedures. We are concerned that inadequately controlled

overtime may adversely affect safety and will place ongoing emphasis upon control

of overtime. However, our inspector found your corrective actions acceptable on

this violation, and no written reply is required.

Our inspector reviewed the actions described in your October 23, 1987 response to

our September 24, 1987 letter (Inspection Report 50-245/87-21). We have no further

questions on administrative control of Instrumentation and Control department sur-

ve111ances. We found your actions responsive to our concerns and we will continue

to evaluate their effectiveness during routine insp.ections.

Your cooperation with us is appreciated.

Sincerely,

Oric tr" M H 'y r

L N 1. . - m

Lee H. Bettenhausen, Chief

S Projects Branch No. 1

g22h51e cw Division of Reactor Projects

0

0FFICIAL RECORD COPY OL50-245/87-33 - 0001.0.0

02/08/88 /

l

. .

.

Northeast Nuclear Energy Company 2 FEB 161989

.

Enclosure: NRC Region I Report 50-245/87-33 and 50-336/87-29

cc w/ enc 1:

W. D. Romberg, Vice President, Nuclear Operations

S. E. Scace, Station Superintendent

D. O. Nordquist, Manager of Quality Assurance

R. M. Kacich, Manager, Generation Facilities Licensing

Gerald Garfield, Esquire

K. T. Eccleston, NRR

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Connecticut

bec w/ encl:

Region I Docket Room (with concurrences)

Management Assistant, DRMA (w/o enc 1)

DRP Section Chief

J. Shediosky, SRI, Haddam Neck

M. Boyle, LPM, NRR

D. Jaffe, LPM, NRR

R. Bores, DRSS

M. Shanbaky, DRSS (See Detail 3)

L. Doerflein, DRP (See Detail 7)

R. Summers, DRP

RI:DRP RI:DRP RI:DRP

[

Ray @mond/meo 2

McCabe

A

(ettenhausen

2/2188

ti

alst 1//(/ ski

l

l

'

OFFICIAL RECORD COPY DL50-245/87-33 - 0002.0.0

02/08/88

l