_ _ _ _ _ _.
MEE Log # TXX-88219 Fi1e # 10130
._,=
r IR 86-22 1R 86-20 7UELECTRIC Ref # 10CFR2.201 w nu.,. c. comm February 15, 1988 ime, n,a nawa.,
U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.
20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET N05. 50-445 AND 50-446 INSPECTION REPORTS N05. 50-445/86-22 AND 50-446/86-20 l
REVISED DATE OF FULL COMPLIANCE FOR NOTICE OF VIOLATION ITEM A (445/8622-V-02; 446/8620-V-03)
REFERENCE:
(1) 10 Electric letter TXX-6993 from W. G. Counsil to NRC dated November 20, 1987 l
[
Gentlemen:
Reference (1) provided a revised date of full compliance to NOV Item A (445/8622-V-02; 446/8620-V-03).
In that letter we stated that nonconformance documents would be dispositioned by February 15, 1988.
Due to unanticipated i
delays in obtaining related information from the valve supplier (Crosby).
disposition and closure of these nonconformance documents is expected to be i
complete by April 15, 1988.
l i
Additionally, Reference (1) stated that a response delineating any required additional corrective action that may result from ISAP Vll.a.9 would be provided by February 15, 1983.
This was based upon an expected ISAP Vll.a.9 completion by mid January.
Currently, publication of ISAP Vll.a.9 is not expected before early March 1988.
Consequently, our response delineating any additional corrective action will be provided by April 15, 1988.
j very truly yours, l
W. G. Counsil ROD /ck C-Hr. R. D. Martin, Region IV NI Resident inspectors, CPSES (3)
IC l
" '
- 3"un mt Marmn.w 9003220095 880215 PDR ADOCK 05000445 1
0 DCD i