ML20149H355

From kanterella
Jump to navigation Jump to search
Amend 108 to License DPR-39,revising Allowable Snubber Insp Periods to Delay Insp for Approx 30 Days
ML20149H355
Person / Time
Site: Zion File:ZionSolutions icon.png
Issue date: 02/05/1988
From: Muller D
Office of Nuclear Reactor Regulation
To:
Shared Package
ML20149H322 List:
References
NUDOCS 8802190226
Download: ML20149H355 (4)


Text

'

sa nuovq'o UNITED STATES g

[

g NUCLEAR REGULATORY COMMISSION u

wAssmorou, o, c. rosss

  • s...../

COMMONWEALTH EDISON COMPANY DOCKET NO. 50-295 ZION NUCLEAR POWER STATION, UNIT 1 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 108 License No. DPR-39 1.

The Nuclear Regulatory Comission (the Comission) has found that:

A.

The application for amendment by Comonwealth Edison Company (the licensee)datedSeptember 22, 1987, modified by letter dated October 27, 1987, complies with the standards and requirements of theAtomicEnergyActof1954,asamended(theAct)andthe Comission's rules and regulations set forth in 10 CFR Chapter I; 8.

The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Comission; C.

There is reasonable assurance (1) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.

The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the public, ano E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Comission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license anendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-39 is hereby amended to read as follows:

(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.tOS, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications.

$h[$DO

[

P

-4

,a.

i

.g.

l t

3.

This license amendment is effective as of the date of its issuance.

FOR THE NUCLEAR REGULATORY COMMISSION r

Daniel R. Muller, Director Project Directorate III-2 Division of Reactor Projects - III, i

IV, V and Special Projects l

Attachment:

[

Changes to the Technical Specifications Date of Issuance: February 5,1988 I

i i

t t

t r

l

ATTACHMENT TO LICENSE AMEN 0MENTS l

AMENDMENT NO.108 FACILITY OPERATING LICENSE NO. OPR-39 DOCKET NO. 50-295 Revise Appendix A as follows:

Remove Page insertPage 295AA1 295AA1 l

I

LIRITING CONDITIONS FOR OPERATION SURVEILLANCE 'tEqu!REMENT 4.

3.22.

Shock Suppressors (Snabbers) (Continued) 4.22. Shock Suppressors (Saubbers) 2.

Hydraulic Snubbers

2. Hydraulic snubbers A.

All safety related hydraulic A. Each hydraulic snubber shall be demonstrated OPERABLE by perform nce of the following snubbers listed in station procedures shall be OPERA 8tE.

augmented inservice inspection program.

1. V1sual Inspections - Hydraulic Snubbers APPLICA81LITY: MODES 1,2,3,4 and 7 All hydraulic snubbers shall be visually (MODES 5 and 6 for snubbers located inspected in accordance with the following on systems required DPERABLE in schedule:

those MODES.)

No. Inoperable Snubbers Subsequent Visual per Inspection Period Inspection Period *.#.

l

~

ACTION:

0 18 months + 251 1,2 12 months i 25%##

l With one or more snubbers inoperable, within 3,4 6 months i 25%

~

72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> replace or restore the inoperable 5-8 124 days i 25%

snubber (s)_to_DPERABLE_ status ahd_perferis_ati 9-14

- -~~ ~

62 days

+ 251

~~ 25% - -

l engineering evaluation per Specification 15,16 31 days i

4.22.2.A.3 on the supported component or declare tha supported system inoperable and The snubbers may be categorized into two groups: Those accessible and.these follow the appropriate ACTION statement for that system.

Snaccessible during reactor operation. Eacle group may be inspected independently la i

i accordance with the above schedule.

l

  • The inspection interval shall not be lengthened more than one step at a time.'

l j

A

  1. The prowlsions of Specification 4.9.2 are l

not applicable.

- ## For Fall 1986. Unit 1 outage,- the I

subsequent visual inspection period, may be j

dalayed until achieving Cold' Shutdown

~

dur M the Spring ig88 Refueling Detage.

I for inaccessable snubbers only.

i AMENDMENT N0. 108 11560/11570 295AA1

_