ML20149H348
| ML20149H348 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 11/10/1994 |
| From: | Lanksbury R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Stetz J CENTERIOR ENERGY, TOLEDO EDISON CO. |
| Shared Package | |
| ML20149H351 | List: |
| References | |
| NUDOCS 9411220140 | |
| Download: ML20149H348 (2) | |
See also: IR 05000346/1994011
Text
a
bed /kb
.
.
November 10, 1994
Centerior Service Company
ATTN: Mr. John P. Stetz
Vice President - Nuclear
Davis-Besse
c/o Toledo Edison Company
300 Madison Avenue
Toledo, OH 43652
Dear Mr. Stetz:
SUBJECT:
ROVIINE RESIDENT INSPECTION AT DAVIS-BESSE (50-346/940ll(DRP))
This refers to the inspection conducted by Messrs. S. Stasek, J. Shine,
D. Kosloff, and D. Shepard of this office on September 14, 1994, through
October 25, 1994.
The inspection included a review of activities authorized
for your Davis-Besse Nuclear Power Station.
At the conclusion of the
inspection, the findings were discussed with those members of your staff
identified in the enclosed report.
Areas examined during the inspection are identified in the report.
Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
Based on the results of this inspection, certain of your activities appeared
to be in violation of NRC requirements, as specified in the enclosed Notice of
Violation (Notice). The violation is of concern because it involved
weaknesses associated with foreign material exclusion (FME) controls for the
reictor cavity / refuel canal area. Since similar FME weaknesses were
pr(viously identified associated with the spent #
' pool (reference NRC
in;pection report 50-346/94006), we conclude your m lowup actions to that
earlier incident were not sufficiently effective to prevent the subject
violation from occurring.
The NRC is concerned that the potential
,
consequences to plant safety of inadequately implemented FME controls is not
fully recognized by many personnel at Davis-Besse.
You are required to respond to this letter and should follow the instructions
specified in the enclosed Notice when preparing your response.
In your
'
response. you should document the specific actions taken and any additional
actions you plan to prevent recurrence. After reviewing your response to this
Notice, including your proposed corrective actions and the results of future
inspections, the NRC will determine whet S r further NRC enforcement action is
necessary to ensure compliance with NRC N.gulatory requirements.
9411220140 941110
gi
'
ADOCK 05000346
O
v'
I
.
P
,
Centerior Service Company
2
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your responses to this letter will be placed
in the NRC Public Document Room.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
~
L;cm1E;cneu17n,n,unyct;yy
Roger D. Lanksbury, Chief
Reactor Projects Section 3B
Docket No. 50-346
Enclosures:
1.
2.
Inspection Report
No. 50-346/940ll(DRP)
cc w/ encl:
D. C. Shelton, Senior
Vice President - Nuclear
J. K. Wood, Plant Manager
W. T. O'Connor, Manager
Regulatory Affairs
State Liaison Officer, State
of Ohio
Robert E. Owen, Ohio
Department of Health
A. Grandjean, State of Ohio,
Public Utilities Commission
Distribution:
Docket File w/ encl
DRP w/ encl
PUBLIC IE-01 w/ encl
RIII PRR w/ enc 1
OC/LfDCB w/ encl
SRI, Davis Besse w/ encl
Project Mananit, NRR w/ encl
Document:
R:
g 7.g... . ..y .,\\.insprpts\\ powers.\\.davi\\.dav940ll .drp
. . .
. . . . . . . .
i .
c . coy ..
. ., .. f.
i c - c y ..
.ii.ei/..ci
c-
0FFICE
Rlll
E
Rill
RIII
N
<
Burdichik~'i# ~ Pirok.[])
Lanksbury N I-
NAME
(Sec1.[1?3)
//' /0 ' #/
Nelh
DATE
0FFICIAL RECORD COPY