ML20149H280
| ML20149H280 | |
| Person / Time | |
|---|---|
| Site: | LaSalle |
| Issue date: | 11/09/1994 |
| From: | Greenman E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Querio R COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20149H281 | List: |
| References | |
| NUDOCS 9411220093 | |
| Download: ML20149H280 (3) | |
See also: IR 05000373/1994017
Text
.
3M Dj
c'
o
November 9, 1994
Commonwealth Edison Company
ATTN: Mr. R. Querio
Site Vice President
LaSalle County Station
2601 North 21st Road
Marseilles, IL 61341
SUBJECT:
Notice of Violation (Inspection Report Nos. 50-373/94017(DRP);
EC-374/94017(DRP))
Dear Mr. Querio:
This refers to the inspection conducted by P. Brochman and other NRC
inspectors, and by R. Zuffa of the Illinois Department of Nuclear Safety, on
August 20 through October 7, 1994. The inspection included a review of
authorized activities for your LaSalle County Station, Units 1 and 2,
facility. At the conclusion of the inspection, the findings were discussed
with those members of your staff identified in the enclosed report.
Areas examined during the inspection are identified in the report. Within
these areas, the in pection consisted of selective examinations of procedures
and rerctesentative records, interviews with personnel, and observation of
activities in progress.
During this inspection, certain of your activities related to incorrectly
oriented orifices appeared to be in violation of NRC requirements, as
specified in the enclosed Notice of Violation (Notice). This violation is of
concern because it demonstrates a continued weakness in your corrective action
program. After the close of this inspection, we identified an additional
orifice that was installed backwards.
In your response to the Notice of
Violation, please include your plan and schedule for addressing the issue of
incorrectl.y oriented orifices in safety-related and important to safety
'
systems.
Overall, the inspectors determined that engineering performance was acceptable
with some improvements noted.
However, the inspectors identified a number of
concerns which merit continued management attention (Section 3 of this report
and Section 3.1 of its attachment).
Some of these concerns were identified in
our inspection of progress made in fulfilling your commitments described in
Attachment B to your April 1, 1994, response to inspection reports
50-373/93026; 50-374/93026 and 50-373/93035; 50-374/93035.
In addition to
your required response to the Notice of Violation, we request you provide the
projected schedule and current status' of your corrective actions described in
Attachment B to your April 1,1994, response, specifically in the areas of
equipment reliability and preventative maintenance (Sections E.2, F.4.a and
F.4.b).
9411220093 941109
ADOCK 05000373
~ -[D[;} l
G
8
n_ =
'
Commonwealth Edison Company
2
{
You are required to respond to this letter and should follow the instructions
,,
soecified in the enclosed Notice when preparing your response.
In your
response, you should document the specific actions taken and any additional
actions you plan to prevent recurrence. After reviewing your response to this
,
Notice, including your proposed corrective actions and the results of future
inspections, the NRC will determine whether further NRC enforcement action is
,
necassary to ensure compliance with NRC regulatory requirements.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your response to this letter will be placed
in the NRC Public Document Room.
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
Edward G. Greenman, Director
Division of Reactor Projects
Docket Nos. 50-373/50-373
Enclosures:
1.
2.
Inspection Reports
!
No.
50-373/9e"7(DRP);
No.
50-374/9 % 7(DRP)
,
cc w/ encl:
J. C. orons, Vice President,
Nuclear Support
J. S. Perry, Vice President, BWR Operations
D. J. Ray, Station Manager
L. Gerner, Regulatory Assurance
Supervisor
D. Farrar, Nuclear Regulatory
Services Manager
Richard Hubbard
Nathan Schloss, Economist
Office of the Attorney General
State Liaison Officer
Chairman, Illinois Commerce
Commission
Distribution:
Docket File w/ encl
DRP w/ encl
PUBLIC IE-01 w/ encl
RIII PRR w/ encl
OC/LFDCB w/ encl
W. L. Axelson, RIII w/ encl
SRI, LaSalle, Dresden,
Quad Cities w/ encl
Project Manager, NRR w/ encl
DOCUMENT NAME: 7:lasa.ir\\las94017.drp
To esocivs a copy of this docush.. . 44ca*! *.. sne von:
"C" = Uny without attachment / enclosure
'E' = Copy with attachment! enclosure
'N' = No copy
0FFICE
RIII
lE
Rill
IE RIII
l // RIII
l4 RIII
lg
I
+
NAME
Hills t eTr-
Schweibinz$2/
Gardner/Fr #
Creed %
Pedersond g /o
DATE
//_.r
44
/ /- 7 '/ y
/ / - 7-1y
w\\(\\\\M
n / 7/3 y
'
0FFICE
RIII
l
RIII
l
l
l
l]
NAME
LaTorre
Greenman
DATE
__
-_-
_
..
..
..
.. .
. _ -
Commonwealth Edison Comp iny
2
~
l
You are required to respond to this letter and should follow the instructions
~
specified in the enclosed Notice when preparing your response.
In your
response, you should document the specific actions taken and any additional
actions you plan to prcvent recurrence. After reviewing your response to this
Notice, including your proposed corrective actions and the results of future
inspections, the NRC will determine whether further NRC enforcement action is
necessary to ensure compliance with NRC regulatory requirements.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
i
this letter, the enclosures, and your response to this letter will be placed
in the NRC Public Document Room.
The responses directed by this letter and the accompanying Notice are not
subject to the clearance procedures of the Office of Management and Budget as
i
'
required by the Paperwork Reduction Act of 1980, Pub. L. No.96-511.
We will gladly discuss any questions you have concerning this inspection.
l
Sincerely,
Edward G. Greenman, Director
i
Docket Nos. 50-373/50-373
License Nos. NPF-ll; NPF-18
Enclosures:
1.
2.
Inspection Reports
No.
50-373/94017(DRP);
No.
50-374/94017(DRP)
cc w/ encl:
J. C. Brons, Vice President,
Nuclear Support
J. S. Perry, Vice President, BWR Operations
D. J. Ray, Station Manager
L. Gerner, Regulatory Assurance
Supervisor
D. Farrar, Nuclear Regulatory
i
Services Manager
I
Richard Hubbard
Nathan Schloss, Economist
Office of the Attorney General
State Liaison Officer
Chairman, Illinois Commerce
Commission
Distribution:
Docket File w/ encl
DRP w/ encl
PUBLIC IE-01 w/ encl
RIII PPR w/ encl
OC/LFDCB w/ encl
W. L. Axelson, RIII w/ encl
SRI, LaSalie, Dresden,
Quad Cities w/ encl
Project Manager, NRR w/ encl
(SEE PREVIOUS CONCURRENCE)
DOCUMENT NAME: g:lasa.ir\\las94017.drp
To ,ecela a copy of this document, indicate in the boa: "C" - Copy without attachment / enclosure
- E" = Copy with attachment / enclosure
- N' = No copy
0FFICE
RIII
l
RIII
l
RIII
l
RIII
l
Rill
NAME
Hills
Schweibinz
Gardner
Creed
Pederson
DATE
OFFICE
RIII
,Qs ( l (, RIII
',l
Rill
l
l
l
NAME
AxelsonB \\. \\ ,3
LaTorts f
Greeruhn
DATE
\\
% \\'M
'(!
h\\nM
'
.
.
J