July 17, 1997
I
L
,
Mr. D.M. Smith, President -
,
PECO Nuclear.
PECO Energy Company
-Nuclear Group Headquarters
l
Correspondence Control Desk
P.O. Box 195 -
'
Wayne, Pennsylvania 19087-0195
SUBJECT: SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE (SALP),-
PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3, REPORT NOS.
- 50-277/97-99 AND 50 278/97-99)
8
,
' Dear Mr. Smith:
j
This letter forwards the SALP report for the Peach Bottom Atomic Power Station, Units 2
j
and 3, for the period October 15,1995, to June 7,1997 (Enclosure 1). This assessment
was conducted under the SALP process that was implemented by the Nuclear Regulatory
Commission (NRC) in July 1993. In this process, the NRC rates the performance of
j
licensees in four functional areas: Operations, Maintenance, Engineering, and Plant !
.
Support. The Plant Support area comprises radiological and effluent controls, chemistry,
i
security, emergency preparedness, fire protection, and housekeeping.
The.overall performance of the Peach Bottom Atomic Power Station remained excellent this
period. The areas of Operations and Maintenance were rated Category 1 as a result of
strong management oversight, excellent personnel performance, good planning and
. effective work control. The plant material condition was, in general, very good. The area
of Plant Support was also rated Category 1 with continued overall effectiveness of
- radiation protection, emergency preparedness, fire protection and security activities.
The area of Engineering was rated Category 2. While overall engineering performance was
'
. good,'there were several instances where operating procedures, surveillances, and tests
were not consistent with the design and licensing bases. Equipment material condition
i
remained excellent, in general. However, some balance of plant' equipment problems
challenged operators, indicating continued attention to equipment performance is needed.
' Also, we found problems with the development and management oversight of efforts to
implement the maintenance rule program.
,.
.
'
f
i
9707240268 970717
0
ADOCK 05000277
/
l
\\
G
.
.
-
.
-
-.
.-.
.
-
_.
-
-
--
.
.
. ,.
.
..-
L
Mr. D.M. Smith
2
The problem _ identification program continued to be effective in identifying, evaluating, and
correcting issues with appropriate thresholds and prioritization. Station management
' maintained a strong emphasis on self-assessment in all areas. Strong performance was
also noted concerning oversight and independent review organizations, particularly the
Independent Safety Engineering Group (ISEG) and the Nuclear Review Board (NRB).
Nuclear Quality Assurance (NOA) generally reviewed safety related activities well.
However, oversight of the maintenance rule implementation by these organizations did not
identify the maintenance rule program weaknesses prior to NRC verification.
We have scheduled a management meeting with you at 7:00 p.m. on July 29,1997, at
the Peach Bottom Site Management Building. The meeting will be open to public
observation. At the meeting, you should be prepared to discuss our assessment and any
initiatives you have ongoing or planned to address the issues identified in our assessment.
Enclosure 2 provides the schedule and basis for the NRC inspections of your facility
planned for the next year. We willinform you of any changes required to the attached
inspection schedule. The routine resident inspection effort is not included in this schedule.
We appreciate your cooperation.
Sincerely,
g73 - .v q:
y
huh .a d. !..mLQ3
Hubert J. Miller
Regional Administrator
Docket Nos. 50-277;50-278
,
Enclosure:
Systematic Assessment of Licensee Performance Report Nos. 50-277/97-99
and 50-278/97-99
l
i
)
i
.
.
.
-
-.
. . ,
. - - .
.
. . . . .
i
'
' * ',-..
-
. .>
-
.
.
Mr. D.M. Smith
3
.
"
cc w/ encl:
G. A. Hunger, Jr., Chairman, Nuclear Review Board and Director, Licensing
T. Mitchell, Vice President, Peach Bottom Atomic Power Station
G. Rainey, Senior Vice President, Nuclear Operations
4
D. B. Fetters, Vice President, Nuclear Station Support
-
T. Niessen, Director, Nuclear Quality Assurance
A. F. Kirby, Illi External Operations - Delmarva Power & Light Co.
'
G. Edwards, Plant Manager, Peach Bottom Atomic Power Station
G. J. Lengyel, Manager, Experience Assessment
J. W. Durham, Sr., Senior Vice President and General Counsel
J. A. Isabella, Manager, Joint Generation, Atlantic Electric
W. T. Henrick, Manager, External Affairs, Public Service Electric & Gas
.
R. McLean, Power Plant Siting, Nuclear Evaluations
-
J. Vannoy, Acting Secretary of Harford County Council
R. Ochs, Maryland Safe Energy Coalition
J. H. Walter, Chief Engineer, Public Service Commission of Maryland
Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance
Mr. & Mrs. Kip Adams
Commonwealth of Pennsylvania
c .-
State of Maryland
TMI - Alert (TMIA)
Chairman Jackson
Commissioner Dicus
Commissioner Diaz
Commissioner McGaffigan
'
institute for Nuclear Power Operations (INPO)
,
l
.
I
1
.
.
4
.
(
4
>
l
'
.
._ ,
, - .
-
- - ~ .
. - . _ ~
. - . - - - . - - . -
-. .
. - .-.
. ..-.
.
. e.
. .
- , ..
.'
'
..
...
.,
.
. - *
,
i
Mr. D.M. Smith
4
.
Distribution w/ encl:
Region l Dccket Room (with concurrences)
1
j
L Callan, EDO
j
H. Thompson, DEDR
SALP Program Manager, NRR/lLPB(2)
,
H. Miller, RA -
C. Hehl, DRP
,
J. Wiggins, DRS
L. Nicholson, DRS
'
P. Swetland, DRP
.
K. Gallagher, DRP -
'
-
- D. Screnci, PAO (2)
-
'J. Lanning, DRM
,
NRC Resident inspector
PUBLIC -
}
_ Nuclear Safety Information Center (NSIC)
Distribution w/ encl: (Via E-Mail)
F. Miraglia, NRR -
W. Dean, OEDO
J. Lieberman, OE (OEMAIL)
<
- -
D. Gamberoni, NRR.
A. Thadani, NRR
'
J. Shea, NRR
j
inspection Program Branch, NRR (IPAS)
Nuc?ser Gaiety :-Jem::Sr Center (NS!C) -
i
R. Correia, NRR
'
F. Talbot, NRR
DOCDESK
- Region i Staff
DOCUMENT NAME: g: ranch 4\\pbsalp.pkg
Ta voceive a copy of this
to in the boa: *C' = gbpy without attachment /e lohre
"E" - Copy'with attachment / enclosure
- N' = No copy
OFFICE
Rl:DRPgpF-
l g. Rl:DRP,/P
RI:DR$kV
RI:RA
l
NAME
PSpMdat!
LNicholson
JWiggins
HMiller
DATE-
79f/97
78/97
7/f/97.
7/ /97
OFFICIAL RECORD COPY
._ .
_
_
._ _ _ . _. _. .
, . _ _ . _ . - . .
_ _ . _
. _.
_ . _ _ . _ _ _ _ . . - .
.
". 6 * . . g .
.
.- .i
.
. , ,
l
.
,
Mr. D.M. Smith
4
Distribution w/erv.i:
Region i Docktst Room (with concurrences)
3
'L. Callan, EDO
'
H. Thompson, DEDR-
S. Collins, NRR
SALP. Program Manager, NRR/lLPB(2)
H. Miller, RA
C. Hehl, DRP
. J. Wiggins, DRS
- L. Nicholson, DRS
P. Swetland, DRP
K. Gallagher,- DRP
D. Screnci. PAO (2)
J. Lanning, DRM
NRC Resident inspector
I
PUBLIC
Nuclear Safety Information Center
. Distribution w/ encl: (Via E-Mail)
F. Miraglia, NRR
W. Dean, OEDO
J. Lieberman, OE (OEMAIL) ~
D. Gamberoni, NRR
)
T. Martin, NRR
J. Shea, NRR
J. Stolz, PDl-2, NRR
M. Padovan, NRR
' Inspection Program Branch,.NRR (IPAS)
Ne!eer 9efetyJnformauon-Gerrter-iNStC)-
R. Correia, NRR
F. Talbot, NRR
I
DOCDESK
Region l Staff
DOCUMENT NAME: g:\\ branch 4\\pbsalp.pkg
T3 recchre e copy of this document, Indicate in the boa: "C" = fopy without attachment / enclosure
- E' = Copy with attachment / enclosure
"N* = No copy
^
OFFICE
RI:DRP
l
Rl:DRP /f
RI:DRS
NRR:PD1-2
l
Rl:RA .
l
NAME
PSwetland"
LNicholson*
JWiggins*
JStolz *
H iller
Per Teleconf.
DATE
7/b'/97
7/9/97
7/9/97
7/9 /97
7pp97
OFFICIAL RECORD COPY