ML20149H188

From kanterella
Jump to navigation Jump to search
Forwards SALP Repts 50-277/97-99 & 50-278/97-99 for Peach Bottom Atomic Power Station,Units 2 & 3 for Period 951015- 970607.Management Meeting Scheduled for 970729 to Discuss Assessment of Repts
ML20149H188
Person / Time
Site: Peach Bottom  Constellation icon.png
Issue date: 07/17/1997
From: Miller H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Danni Smith
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20149H192 List:
References
50-277-97-99, 50-278-97-99, NUDOCS 9707240268
Download: ML20149H188 (5)


See also: IR 05000277/1997099

Text

._

.. -.

.

- .

- - . . .

-.

- -.

~

,

.

l:

,

'-.

4.

,

e -

}

July 17, 1997

I

L

,

Mr. D.M. Smith, President -

,

PECO Nuclear.

PECO Energy Company

-Nuclear Group Headquarters

l

Correspondence Control Desk

P.O. Box 195 -

'

Wayne, Pennsylvania 19087-0195

SUBJECT: SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE (SALP),-

PEACH BOTTOM ATOMIC POWER STATION, UNITS 2 AND 3, REPORT NOS.

- 50-277/97-99 AND 50 278/97-99)

8

,

' Dear Mr. Smith:

j

This letter forwards the SALP report for the Peach Bottom Atomic Power Station, Units 2

j

and 3, for the period October 15,1995, to June 7,1997 (Enclosure 1). This assessment

was conducted under the SALP process that was implemented by the Nuclear Regulatory

Commission (NRC) in July 1993. In this process, the NRC rates the performance of

j

licensees in four functional areas: Operations, Maintenance, Engineering, and Plant !

.

Support. The Plant Support area comprises radiological and effluent controls, chemistry,

i

security, emergency preparedness, fire protection, and housekeeping.

The.overall performance of the Peach Bottom Atomic Power Station remained excellent this

period. The areas of Operations and Maintenance were rated Category 1 as a result of

strong management oversight, excellent personnel performance, good planning and

. effective work control. The plant material condition was, in general, very good. The area

of Plant Support was also rated Category 1 with continued overall effectiveness of

- radiation protection, emergency preparedness, fire protection and security activities.

The area of Engineering was rated Category 2. While overall engineering performance was

'

. good,'there were several instances where operating procedures, surveillances, and tests

were not consistent with the design and licensing bases. Equipment material condition

i

remained excellent, in general. However, some balance of plant' equipment problems

challenged operators, indicating continued attention to equipment performance is needed.

' Also, we found problems with the development and management oversight of efforts to

implement the maintenance rule program.

,.

.

'

f

i

9707240268 970717

0

PDR

ADOCK 05000277

/

l

\\

G

PDR

.

.

-

.

-

-.

.-.

.

-

_.

-

-

--

.

.

. ,.

.

..-

L

Mr. D.M. Smith

2

The problem _ identification program continued to be effective in identifying, evaluating, and

correcting issues with appropriate thresholds and prioritization. Station management

' maintained a strong emphasis on self-assessment in all areas. Strong performance was

also noted concerning oversight and independent review organizations, particularly the

Independent Safety Engineering Group (ISEG) and the Nuclear Review Board (NRB).

Nuclear Quality Assurance (NOA) generally reviewed safety related activities well.

However, oversight of the maintenance rule implementation by these organizations did not

identify the maintenance rule program weaknesses prior to NRC verification.

We have scheduled a management meeting with you at 7:00 p.m. on July 29,1997, at

the Peach Bottom Site Management Building. The meeting will be open to public

observation. At the meeting, you should be prepared to discuss our assessment and any

initiatives you have ongoing or planned to address the issues identified in our assessment.

Enclosure 2 provides the schedule and basis for the NRC inspections of your facility

planned for the next year. We willinform you of any changes required to the attached

inspection schedule. The routine resident inspection effort is not included in this schedule.

We appreciate your cooperation.

Sincerely,

g73 - .v q:

y

huh .a d. !..mLQ3

Hubert J. Miller

Regional Administrator

Docket Nos. 50-277;50-278

,

Enclosure:

Systematic Assessment of Licensee Performance Report Nos. 50-277/97-99

and 50-278/97-99

l

i

)

i

.

.

.

-

-.

. . ,

. - - .

.

. . . . .

i

'

' * ',-..

-

. .>

-

.

.

Mr. D.M. Smith

3

.

"

cc w/ encl:

G. A. Hunger, Jr., Chairman, Nuclear Review Board and Director, Licensing

T. Mitchell, Vice President, Peach Bottom Atomic Power Station

G. Rainey, Senior Vice President, Nuclear Operations

4

D. B. Fetters, Vice President, Nuclear Station Support

-

T. Niessen, Director, Nuclear Quality Assurance

A. F. Kirby, Illi External Operations - Delmarva Power & Light Co.

'

G. Edwards, Plant Manager, Peach Bottom Atomic Power Station

G. J. Lengyel, Manager, Experience Assessment

J. W. Durham, Sr., Senior Vice President and General Counsel

J. A. Isabella, Manager, Joint Generation, Atlantic Electric

W. T. Henrick, Manager, External Affairs, Public Service Electric & Gas

.

R. McLean, Power Plant Siting, Nuclear Evaluations

-

J. Vannoy, Acting Secretary of Harford County Council

R. Ochs, Maryland Safe Energy Coalition

J. H. Walter, Chief Engineer, Public Service Commission of Maryland

Mr. & Mrs. Dennis Hiebert, Peach Bottom Alliance

Mr. & Mrs. Kip Adams

Commonwealth of Pennsylvania

c .-

State of Maryland

TMI - Alert (TMIA)

Chairman Jackson

Commissioner Dicus

Commissioner Diaz

Commissioner McGaffigan

'

institute for Nuclear Power Operations (INPO)

,

l

.

I

1

.

.

4

.

(

4

>

l

'

.

._ ,

, - .

-

- - ~ .

. - . _ ~

. - . - - - . - - . -

-. .

. - .-.

. ..-.

.

. e.

. .

, ..

.'

'

..

...

.,

.

. - *

,

i

Mr. D.M. Smith

4

.

Distribution w/ encl:

Region l Dccket Room (with concurrences)

1

j

L Callan, EDO

j

H. Thompson, DEDR

SALP Program Manager, NRR/lLPB(2)

,

H. Miller, RA -

C. Hehl, DRP

,

J. Wiggins, DRS

L. Nicholson, DRS

'

P. Swetland, DRP

.

K. Gallagher, DRP -

'

-

- D. Screnci, PAO (2)

-

'J. Lanning, DRM

,

NRC Resident inspector

PUBLIC -

}

_ Nuclear Safety Information Center (NSIC)

Distribution w/ encl: (Via E-Mail)

F. Miraglia, NRR -

W. Dean, OEDO

J. Lieberman, OE (OEMAIL)

<

-

D. Gamberoni, NRR.

A. Thadani, NRR

'

J. Shea, NRR

J. Stolz, PDI 2, NRR

j

inspection Program Branch, NRR (IPAS)

Nuc?ser Gaiety :-Jem::Sr Center (NS!C) -

i

R. Correia, NRR

'

F. Talbot, NRR

DOCDESK

- Region i Staff

DOCUMENT NAME: g: ranch 4\\pbsalp.pkg

Ta voceive a copy of this

to in the boa: *C' = gbpy without attachment /e lohre

"E" - Copy'with attachment / enclosure

  • N' = No copy

OFFICE

Rl:DRPgpF-

l g. Rl:DRP,/P

RI:DR$kV

RI:RA

l

NAME

PSpMdat!

LNicholson

JWiggins

HMiller

DATE-

79f/97

78/97

7/f/97.

7/ /97

OFFICIAL RECORD COPY

._ .

_

_

._ _ _ . _. _. .

, . _ _ . _ . - . .

_ _ . _

. _.

_ . _ _ . _ _ _ _ . . - .

.

". 6 * . . g .

.

.- .i

.

. , ,

l

.

,

Mr. D.M. Smith

4

Distribution w/erv.i:

Region i Docktst Room (with concurrences)

3

'L. Callan, EDO

'

H. Thompson, DEDR-

S. Collins, NRR

SALP. Program Manager, NRR/lLPB(2)

H. Miller, RA

C. Hehl, DRP

. J. Wiggins, DRS

- L. Nicholson, DRS

P. Swetland, DRP

K. Gallagher,- DRP

D. Screnci. PAO (2)

J. Lanning, DRM

NRC Resident inspector

I

PUBLIC

Nuclear Safety Information Center

. Distribution w/ encl: (Via E-Mail)

F. Miraglia, NRR

W. Dean, OEDO

J. Lieberman, OE (OEMAIL) ~

D. Gamberoni, NRR

)

T. Martin, NRR

J. Shea, NRR

J. Stolz, PDl-2, NRR

M. Padovan, NRR

' Inspection Program Branch,.NRR (IPAS)

Ne!eer 9efetyJnformauon-Gerrter-iNStC)-

R. Correia, NRR

F. Talbot, NRR

I

DOCDESK

Region l Staff

DOCUMENT NAME: g:\\ branch 4\\pbsalp.pkg

T3 recchre e copy of this document, Indicate in the boa: "C" = fopy without attachment / enclosure

  • E' = Copy with attachment / enclosure

"N* = No copy

^

OFFICE

RI:DRP

l

Rl:DRP /f

RI:DRS

NRR:PD1-2

l

Rl:RA .

l

NAME

PSwetland"

LNicholson*

JWiggins*

JStolz *

H iller

Per Teleconf.

DATE

7/b'/97

7/9/97

7/9/97

7/9 /97

7pp97

OFFICIAL RECORD COPY

l

"See Previous Concurrence Copy