Advises That Reactor & Senior Reactor Operator Exams Scheduled for Wk of 880424 & Simulator/Operating Exams for 880425-28.Ref Matls in Encl Requested
ML20149H034
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 02/10/1988
From: Julian C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Kingsley O
SYSTEM ENERGY RESOURCES, INC.
References
NUDOCS 8802190072
Download: ML20149H034 (10)


Text

.-

l 1

i i

February 10, 1988 i

s l

l i

System Energy Resources, Inc.

[

ATTN: Mr. 0. D. Kingsley, Jr.

Vice President, Nuclear Operations l

l P. O. Box 23054

)

Jackson, MS 39205 I

Gentlemen.

j

SUBJECT:

REACTOR OPERATOR AND SENIOR OPERATOR LICENSING EXAMINATIONS In a telephone conversation between Mr. M. Shelly, Operations Training Supervisor, and Mr. D. C. Payne, NRC Region 11 Operator Licensing Section 1, arrangements i

were made for administration of the replacement examinations at the Grand Gulf Nuclear Station.

t The written examinations are scheduled for the week of April 24, 1988. The i

simulator / operating examinations are scheduled for April 25-28, 1988, at the

[

Grand Gulf simulation f acility. The plant oral examinations are scheduled for April 25-28, 1988.

l i

In order for us to meet the above schedule, it will be necessary for the facility to furnish the approved reference material listed in Enclosure 1, i

"Reference Material Requirements for Reactor / Senior Reactor Operator Licensing i

Examinations," by February 19, 1988. Any delay in receiving properly bound and i

indexed reference material will result in a delay in administering the

[

examinations. Our examinations are scheduled far in advance with considerable i

planning to utilize our present limited examiner manpower and to meet the

[

examination dates requested by the various facilities. Therefore, missing the l

February 19, 1988 deadline, even by a few days, will likely result in a long i

delay, because it may not be possible to reschedule examinations at other i

facilities. Mr. Shelly has been advised of our reference material sets that i

are required, and the examiners' names and addresses where each set is to be i

mailed.

The facility management is responsible for providing adequate space and accom-i modations in order to properly conduct the written examinations.

"Requirements for Administration of Written Examinations," describes our t

requirements for conducting these examinations. Mr. Shelly has also been j

informed of these requirements.

In addition, to better document simulator examinations, the chief examiner 1

will have the facility simulator operator record prespecified plant conditions (i.e., plant pressure, temperature, pressurizer level, etc.), for each simulator scenario.

The candidate will be responsible for providing this information.

l along with any appeal of his simulator operating examination.

Therefore, the j

i facility training staff should retain the simulatur examination scenario l

l information until all candidates taking the examination have either passed 1

the operating examination or all appeals filed by the candidates who failed 1

the operating examination have teen completed.

l j

l l

h hNO 16 J

V DCD

/

.rd > 2

System Energy Resources, Inc.

2 February 10, 1988 also contains the Rules and Guidelines that will be in effect during the administration of the written examination. The facility management is responsible for ensuring that all candidates are aware of these Rules.

All reactor operator and senior reactor operator license application information should normally be submitted at least 60 days before the first examination dates so that we will be able to review the training and experience of the candidates, 4

process the medical certifications, and prepare final examiner assignments af ter candidate eligibility has been determined.

If the application information is not received at least 30 days before the examination dates, it is possible that a postponement will be necessary.

This request for information was approved by the Office of Management and Budget under Clearance Number 3150-0101 which expires on May 31, 1989.

Comments on burden and duplication may be directed to the Office of Management and Budget, Reports Management, Room 3208, New Executive Office Building, Washington, DC 20503.

The facility staff review of the written examination will be conducted in accordance with requirements specified in Enclosure 3. "Requirements for Facility Review of Written Examination."

Mr. Shelly has been informed of these requirements.

Thank you for your consideration in this matter.

If you have any questions regarding the examination procedures and requirements, please contact Mr. J. F. Munro, Chief, Operator Licensing Section 1, at 404/331-5544 Sincerely, (oRic:NAL SIGNED BY C. A. JULIAN)

Caudie A. Julian, Chief Operations Branch Division of Reactor Safety

Enclosures:

1.

Reference Material Requirements 2.

Requirements for Administration of Written Exams 3.

Facility Review Requirements cc w/encls:

K. Beatty, Training Superintendent C. R. Hutchinson, Plant Manager bec:

(See page 3)

~

b System Energy Resources, Inc.

3 February 10, 1988 bec w/encis:

Projects Manager, NRR H. Dance, Section Chief, DRP C. Payne OL Examiner Sejlor Resident Inspector AEocument Control Desk State of Mississippi l

l l

RI R1 Rll R".

'j.

11 f~

t

/

' haw:obw Payne JF,upro CAht' n

02/.V/88 02/ f /88 02/$/88 02/ /88 1

I

l p

ENCLOSURE 1 REFERENCE MATERIAL REQUIREMENTS FOR REACTOR / SENIOR REACTOR OPERATOR LICENSING EXAMINATIONS 1.

Existing learning objectives and lesson plans (including training manuals, plant orientation manual, system descriptions, reactor theory, thermo-dynamics,etc.)

Training naterials should include all substantive written r.aterial used for preparing candidates for initial R0 and SR0 licensing.

The written material should be inclusive of learning objectives and the details presented during lecture, rather than outlines. Training materials should be identified by plant and unit, bound, and indexed.

Failure to provide complete, properly bound and indexed plant reference material will result in canceling or rescheduling of the examinations.

Training materials which include the following should be provided:

a.

System descriptions including descriptions of all operationally relevant flow paths, components, controls and instrumentation.

System training material should draw parallels to the actual procedures used for operating the applicable system, b.

Complete and operationally useful

, ions of all safety-system interactions and, where available em interactions under emergency and abnormal condition.

..ig consequences of enticipated operator error, maintenonue error, and equipment failure.

c.

Training material used to clarify and strengthen understanding cf emergency operating precedures.

d.

Comprehensive theory naterial that includes fundamentals in the area of theory of reactor coeration, thermodynamics, heat transfer and fluid flow, as well as specific application to actual in-plant components.

For example, nachanical theory material on punps should include pump theory as well as descriptions of how these principles actually apply to major plant pumps and the systems in which they are installed (i.e., Reactor Coolant pumps, all ECCS pumps, Recirculation pumps, Feedwater pumps and Er.ergency Feedwater pumps).

Reactor theory material should include descriptions that draw explicit ties between the fundamentals and the actual operating limits followed in the plant (i.e., reactor theory material should contain explanations of how principles relate to the actual curves used by operators to verify shutdown cargin or calculate an ECP).

j

2 2.

Procedure Index (alphabetical by subject) 3.

All administrative procedures (as applicable to reactor operation or safety) 4.

All integrated plant procedures (normal or general operating procedures) 5.

Energency procedures (emergency instructions, abnormal or special procedures) 6.

Standing orders (important orders that are safety-related and may supersede the regular procedures) 7.

Fuel-handling and core-loading procedures, (initial core-loading procedure, when appropriate) 8.

Annunciator procedures (alarm procedures, including set points) 9.

Radiation protection manual (radiation control manual or procedures)

10. Emergency plan inplementing procedures
11. Technical Specifications 12.

System operating procedures 13.

Piping and instrumentetion diagrams, electrical single-line diagram, or flow diagrams 14 Technical Data Book, and/or plant curve information as used by cperators and facility precautions, limitations, and set points (PLS) for the facility

15. Questions and aniwers that the facility licensee has prepared (voluntary by facility licensee)
16. The folicwing on the plant reference simulation facility a.

List of all readily available initialization points b.

List of all preset malfunctions with a clear identification number, The list should include cause and effect information.

Specifically, for each malfunction, a concise description of the expected result, or range of results, that will occur upon implementation should be provided.

Additionally, an indication of which annunciators are to be initially expected should be given, c.

A description of simulator failure capabilities for valves, breakers, indicators and alams.

3 d.

Where the capability exists, an explanation of the ability to vary the severity o' a particular malfunction should be provided, i.e., ability to vary tre size of a given LOCA or steam leak, or the ability to cause a slow fa lure of a component such as a feed pump, turbine generator or major valle (e.g., drifting shut of a main feedwater control valve) e.

An identi'ication of modeling conditions / problems that may impact the examination f.

Identification of any known Performance Test Failures not yet completed g.

Identification of significant differences between the simulator and the reference plant's control room b.

Copies of facility generated scenarios that expose the candidates to situations of degraded pressure control (PWR), degraded heat removal capability (PWR and BWR), and containment challenges (BWR) may be provided (voluntary by licensee) i.

Simulator instructors manual (voluntary by licensee) j.

Description of the scenarios used for the training class (voluntary by licensee)

17. All material different from that listed in items 1-16 that is specific to the Operator Requalification Training Program
18. Additicnal material required by the examiners to develop examinations that meet the requirements of these standards and the regulations.

The above reference material shculd be approved, final issues and should be so marked.

If a plant has not finalized some of the material, the chief examiner shall verify with the facility that the most complete, up-to-date material is i

available and that agreement has beer, reached with the licensee for limiting changes before the administration of the examination.

All procedures and reference material should be beund with appropriate indexes or tables of centents so that they can be used efficiently.

S y

ENCLOSURE 2 i

REQUIREMENTS FOR ADMINISTRATION OF WRITTEN EXAMINATIONS i

1.

A single room shall be provided for completing the written examination.

1 The location of this room and supporting restroom facilities shall be such as to prevent contact with all other facility and/or contractor j

personnel during the duration of the written examination.

If necessary, the facility should make arrangements for the use of a suitable room at a local school, motel, or other building.

Obtaining this room is the l

responsibility of the licensee.

2.

Minimum spacing is required to ensure examination integrity as determined by the chief examiner. Minimum spacing should be one candidate per table, with a 3-ft. space between tables.

No wall charts, models, and/or other i

training materials shall be present in the examination room.

3 Suitable arrangements shall be made by the facility if the candidates are to have lunch, coffee, or other refreshments.

These arrangements shall l

comply with item 1 above.

These arrangements shall be reviewed by the examiner and/or proctor.

4.

The facility staff shall be provided a copy of the written examination and answer key after the last candidate has ccmpleted and handed in his written examination.

The facility staff shall then have five working days to pruvide formal written comments with supporting documentation en the exanination and answer key to the chief examiner or to tne ranional t

l office section chief.

5.

The fac-Ility licensee shall prov'ce pads of 8-1/2 by 11 inch lined paper s

in unopened packages for each candidate's use in completing the examination.

The examiner shall distribute these pads to the candidates. All reference j

material needed to complete the examination shall be furnished by the examiner.

Candidates can bring pens, pencils, calculators, or slide l

rules into the examination room, and no other equipment or reference 1

material shall be allowed.

L l

6.

Only black ink or dark pencils should be used for writing answers to l

questions.

l i

I i

l 4

L}

i 1

r

2 NRC RULES AND GUIDELINES FOR LICENSE EXAMINATIONS During the administration of this examination the following rules apply:

1.

Cheating on the examination means an automatic denial of your application and could result in more severe penalties.

2.

Restroom trips are to be limited and only one candidate at a time may leave. You must avoid all contacts with anyone outside the examination room to avoid even the appearance or possibility of cheating.

3.

Use black ink or dark pencil only to facilitate legible reproductions.

4.

Print your name in the blank provided on the cover sheet of the examination.

5.

Fill in the date on the cover sheet of the examination (if necessary).

6.

Use only the paper provided for answers.

7.

Print your name in the upper right-hand corner of the first page of each section of the answer sheet.

8.

Consecutively number each answer sheet, write "End of Lategory

" as appropriate, start each category on a new page, writs on only one side of the pape*, and write "Last Page" on the"Tast answer sheet.

9.

Number each answer as to category and r, umber, for example,1.4, 6.3.

10.

Skip at least three lines between each answer.

11. Separate answer sheets from pad and place finished answer sheets face down on your desk or table.
12. Use abbreviations only if they are commonly used in facility literature.
13. The point value for each question is indicated in parentheses af ter the question and can be used as a guide for the depth of answer required.

14.

Show all calculations, methods, or assumptions used to obtain an answer to mathematical problems, whether indicated in the question or not.

15.

Partial credit may be given.

Therefore, ANSWER ALL PARTS OF THE QUESTION AND 00 NOT LEAVE ANY ANSWER BLANK.

t 3

16.

If parts of the examination are not clear as to intent, ask questions of the examiner only.

17.

You must sign the statement on the cover sheet that indicates that the work is your own and you have not received or been given assistance in completing the examination.

This must be done after the examination has been completed.

18. When you complete your examination, you shall:

a.

Assemble your examination as follows:

(1) Exam questions on top.

(2) Exam aids - figures, tables, etc.

(3) Answer pages including figures which are a part of the answer.

b.

Turn in your copy of the examination and all pages used to answer the examination questions.

c.

Turn in all scrap paper and the balance of the paper that you did not use for answering the questions, d.

Leave the examination area, as defined by the examiner.

If after leaving, you are found in this area wnile the examination is still i

in prcgress, your license may be denied er revuked.

ENCLOSURE 3 REQUIREMENTS FOR FACILITY REVIEW 0F WRITTEN EXAMINATION 1.

There shall be no review of the written examination by the facility staff before or during the administration of the examination.

Following the administration of the written examination, the facility staff shall be provided a marked-up copy of the examination and the answer key.

2.

The facility will have five (5) working days from the day the written examination is given to provide formal comment submittal.

The submittal will be made to the responsible regional office by the highest level of coperate managenent for plant operations, e.g., Vice President for Nuclear Operations.

A copy of the submittal will be forwarded to the chief examiner, as appropriate.

Comments not submitted within five (5) working days will be considered for inclusion in the grading process on a case by case basis by the regional office section chief.

Should the corment submittal deadline not be met, a long delay for finalization of the examination results may occur.

3.

The following format should be adhered to for submittal of specific comments:

a.

Listing of NRC question, answer and reference b.

Facility comment c.

Supporting documentation NOTES:

1.

No change to the examination will be made without submittal of complete, current, and approved reference material.

2.

Cor: rents made without a concise facility recommendation will not be addressed.