Forwards Special Insp Rept 50-295/97-12 on 970311-0425 & NOV
ML20149G622
Person / Time
Site: Zion File:ZionSolutions icon.png
Issue date: 07/17/1997
From: Grant G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Mueller J
COMMONWEALTH EDISON CO.
Shared Package
ML20149G625 List:
References
50-295-97-12, NUDOCS 9707230377
Download: ML20149G622 (4)


See also: IR 05000295/1997012

Text

.

-

.

. . _ .

. - . .

~ . -

. . . . , .

. ..-

.

.

/"%

UNITED STATES

k

NUCLEAR REGULATORY COMMISSION

go

E

- REGloN til

<

U

t

801 WARRENVILLE ROAD

k,

[

UsLE. ILUNolS 60532-4351

July 17, 1997

Mr. J. H. Mueller

Site Vice President

Zion Station

'

Commonwealth Edison Company

101 Shiloh Boulevard

,

.

Zion, IL 60099

-

SUBJECT:

NRC SPECIAL INSPECTION REPORT 50-295/97012 AND

p

NOTICE OF VIOLATION

Dear Mr. Mueller:

On April 25,1997, the NRC completed a specialinspection of the Unit 1 loss of offsite

S

power event that occurred on March 11,1997. The enclosed report presents the results

i

of that inspection.

Your staff's response resulted in satisfactory recovery from the event with no actual

consequencer 10 the public health and safety. Licensee actions reflected a conscious

effort to emphasize a conservative operating philosophy focused on safety. However,

3

some deficiencies unnecessarily slowed the event response, including inconsistent

{

communication and coordination between departments, inefficient work planning, plant

l

_ equipment and operating procedure problems, and insufficient control of operability

assessments.

,

4

We are concerned about two violations of NRC requirements that were identified during

this inspection. The first violation involves the failure to have a procedure for responding

to a loss of offsite power event. An integrated loss of offsite power procedure could have

significantly improved event response, and resulted in a more timely restoration of plant

equipment. The second violation pertains to the f ailure to implement timely and effective

corrective actions to prevent the recurrence of malfunctions of sequence timers that

control the loading of engineered safety feature buses.

These violations are dted in the enclosed Notice of Violation, and the circumstances

surrounding the violations are described in detailin the enclosed report. Please note that

you are required to respond to this letter and should follow the instructions specified in the

enclosed Notice when preparing your response The NRC Will use your response, in part,

-

to determine whether further enforcement action is necessary to ensure compliance with

regulatory requirements.

!

I

N. ill.lR.IllE.llll.ll

i

,

9707230377 970717

PDR

ADOCK 05000295

G

PDR

.

.

l

J. H. Mueller

-2-

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,

its enclosure, and your response will be placed in the NRC Public Document Room.

We will gladly discuss any questions you have concernin : this inspection.

Sincerely,

t

0

)

%s

' bY

,

-

W

-

Geo rey E. Grant

irector

Division of Reactor Projects

Docket Nos. 50-295

l

License Nos. DPR-39

i

l

Enclosures:

1) Notice of Violation

2) Inspection Report

No. 50-295/97-12

cc w/ encl:

T. J. Maiman, Senior Vice President

Nuclear Operations Division

D. A. Sager, Vice President,

Generation Support

i

H. W. Keiser, Chief Nuclear

Operating Officer

R. Starkey, Plant General Manager

R. Godley, Regulatory Assurance

Supervisor

1. Johnsen, Acting Nuclear

Regulatory Services Manager

Richard Hubbard

Nathan Schloss, Economist

Office of the Attorney General

Mayor, City of Zion

State Liaison Officer, Wisconsin

State Liaison Officer

Chairman, Illinois Commerce

Commission

Document Control Desk-Licensing

.

.

,

.

4

J. H. Mueller

-3-

Distribution:

Docket File w/enci

Project Manager, NRR w/enci

PUBLIC IE-01 w/ encl

DRP w/enci

OC/LFDCB w/enci

Rlli PRR w/enct

SRI Byron, Braidwood,

CAA1 w/enci (E-mail)

Zion w/enci

Deputy RA, w/ encl

A B. Beach, w/ encl

RAC1 (E-Mail)

Rlli Enf, Coordinator, w/ encl

DRS (2) w/enci

TSS w/ encl

DOCDESK (E-mail)

i

k

i

!

(

,

i

.

db

4

l

1

.

.

_-

,

.

J. H. Mueller

-2-

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of this letter,

its enclosure, and your resporise will be placed in the NRC Public Document Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

/s/ G. E. Grant

Geoffrey E. Grant, Director

Division of Reactor Projects

Docket Nos. 50-295

License Nos. DPR-39

Enclosures:

1) Notice of Violation

2) Inspection Report

No. 50-295/97-12

cc w/enci:

T. J. Maiman, Senior Vice President

Nuclear Operations Division

D. A. Sager, Vice President,

Generation Support

H. W. Keiser, Chief Nuclear

Operating Officer

R. Starkey, Plant General Manager

R. Godley, Regulatory Assurance

Supervisor

1. Johnson, Acting Nuclear

Regulatory Services Manager

Richard Hubbard

Nathan Schloss, Economist

Office of the Attorney General

Mayor, City of Zion

State Liaison Officer, Wisconsin

State Liaison Officer

Chairman, Illinois Commerce

Commission

Document Control Desk-Licensing

DOCUMENT NAME: R :\\l N S PR PTS \\PO W E R S\\ZI O N\\ZI O 97012. D R P

To receive a copy of this docurnent, indicate in the box "C" = Copy without attach /enci

"E" = Copy with attach /enci "N" = No copy

OFFICE

Rlli

6-

Rlli

g

Rlli

NAME

Hills /co 06u

Parker 9//f[

Granh

DATE

7/ / /97

7/) /97

7/{-]/d2b

OFFICIAL RECORD COPY