ML20149G621
| ML20149G621 | |
| Person / Time | |
|---|---|
| Site: | Braidwood |
| Issue date: | 10/06/1994 |
| From: | Miller L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Kaup K COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20149G624 | List: |
| References | |
| NUDOCS 9410240061 | |
| Download: ML20149G621 (2) | |
See also: IR 05000456/1994021
Text
,-
1601
.
October 6, 1994
Commonwealth Edison Company
ATTN: Mr. K. Kaup
Site Vice President
Braidwood Station
RR #1, Box 84
Braceville, IL 60407
Dear Mr. Kaup:
,
This refers to the inspection conducted by Messrs. S. G. Du Pont,
E. R. Duncan,
R. Landsman, D. Butler and C. E. Brown of this office and J. Romar, of the
Illinois Department of Nuclear Safety on August 9 through September 16, 1994.
The inspection included a review of activities authorized for your Braidwood
facility. At the conclusion of the inspection, the findings were discussed with
those members of your staff identified in the enclosed report.
Areas examined during the inspection are identified in the report. Within these
areas, the inspection consisted of selective examinations of procedures and
representative records, interviews with personnel, and observation of activities
in progress.
Based on the results of this inspection, certain of your activities appeared to
be in violation of NRC requirements, as specified in the enclosed Notice of
Violation.
The violation is of concern because adherence to procedures is an
important part of safe plant operation.
A number of these examples were NRC
identified.
You are required to respond to this letter and should follow the instructions
specified in the enclosed Notice when preparing your response. In your response,
you should document the specific actions taken and any additional actions you
plan to prevent recurrence.
After reviewing your response to this Notice,
including your proposed corrective actions and the results of future inspections,
the NRC will determine whether further NRC enforcement action is necessary to
ensure compliance with NRC regulatory requirements.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter, the enclosures, and your response to this letter will be placed in the
NRC Public Document Room.
The responses directed by this letter and the accompanying Notice are not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, Pub. L.96-511.
110DA8
I
9410240061 941006
ADOCK 05000456
l
G
.PDR
,
.
-
-
_
.
.
Commonwealth Edison Company
2
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
Lewis F. Miller, Jr., Chief
Reactor Projects Section lA
Docket Nos. 50-456; 50-457
Enclosures:
1.
2.
Inspection Report
No. 50-456/94021(DRP);
No. 50-457/94021(DRP)
cc w/ encl:
J. C. Brons, Vice President,
Nuclear Support
K. Kofron, Station Manager
K. Bartes, Regulatory
Assurance Supervisor
D. Farrar, Nuclear Regulatory
Services Manager
Richard Hubbard
Nathan Schloss, Economist
Office of the Attorney General
State Liaison Officer
Chairman, Illinois Commerce
Commission
,
. Distribution
Docket File w/ encl
DRP w/ encl
OC/LFDCB w/ encl
RIII PRR w/ encl
PUBLIC IE-01 w/ encl
SRI Byron, Braidwood, Zion w/ encl
Project Mgr., NRR w/ encl
Document:
R:\\
To receive a copy of this document, indicate in the box "C" - Copy without
attach / encl
"E" = C_opy with attach / enc 1
"h ' - No copy
0FFICE
RIII b
RIII
RIII O,
/
NAME
HiltonYTA
LaTorrer%h
LMille[h
///hN
l0\\hk@\\ '
lI[G[7(/
DATE
'
0FFICIAL RECORD COPY
'
.
-