Forwards Insp Repts 50-456/94-21 & 50-457/94-21 on 940809-0916 & Notice of Violation
ML20149G621
Person / Time
Site: Braidwood  Constellation icon.png
Issue date: 10/06/1994
From: Miller L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Kaup K
COMMONWEALTH EDISON CO.
Shared Package
ML20149G624 List:
References
NUDOCS 9410240061
Download: ML20149G621 (2)


See also: IR 05000456/1994021

Text

,-

1601

.

October 6, 1994

Commonwealth Edison Company

ATTN: Mr. K. Kaup

Site Vice President

Braidwood Station

RR #1, Box 84

Braceville, IL 60407

Dear Mr. Kaup:

,

This refers to the inspection conducted by Messrs. S. G. Du Pont,

E. R. Duncan,

R. Landsman, D. Butler and C. E. Brown of this office and J. Romar, of the

Illinois Department of Nuclear Safety on August 9 through September 16, 1994.

The inspection included a review of activities authorized for your Braidwood

facility. At the conclusion of the inspection, the findings were discussed with

those members of your staff identified in the enclosed report.

Areas examined during the inspection are identified in the report. Within these

areas, the inspection consisted of selective examinations of procedures and

representative records, interviews with personnel, and observation of activities

in progress.

Based on the results of this inspection, certain of your activities appeared to

be in violation of NRC requirements, as specified in the enclosed Notice of

Violation.

The violation is of concern because adherence to procedures is an

important part of safe plant operation.

A number of these examples were NRC

identified.

You are required to respond to this letter and should follow the instructions

specified in the enclosed Notice when preparing your response. In your response,

you should document the specific actions taken and any additional actions you

plan to prevent recurrence.

After reviewing your response to this Notice,

including your proposed corrective actions and the results of future inspections,

the NRC will determine whether further NRC enforcement action is necessary to

ensure compliance with NRC regulatory requirements.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter, the enclosures, and your response to this letter will be placed in the

NRC Public Document Room.

The responses directed by this letter and the accompanying Notice are not subject

to the clearance procedures of the Office of Management and Budget as required

by the Paperwork Reduction Act of 1980, Pub. L.96-511.

110DA8

I

9410240061 941006

PDR

ADOCK 05000456

l

G

.PDR

,

.

-

-

_

.

.

Commonwealth Edison Company

2

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Lewis F. Miller, Jr., Chief

Reactor Projects Section lA

Docket Nos. 50-456; 50-457

License Nos. NPF-72; NPF-77

Enclosures:

1.

Notice of Violation

2.

Inspection Report

No. 50-456/94021(DRP);

No. 50-457/94021(DRP)

cc w/ encl:

J. C. Brons, Vice President,

Nuclear Support

K. Kofron, Station Manager

K. Bartes, Regulatory

Assurance Supervisor

D. Farrar, Nuclear Regulatory

Services Manager

Richard Hubbard

Nathan Schloss, Economist

Office of the Attorney General

State Liaison Officer

Chairman, Illinois Commerce

Commission

,

. Distribution

Docket File w/ encl

DRP w/ encl

OC/LFDCB w/ encl

RIII PRR w/ encl

PUBLIC IE-01 w/ encl

SRI Byron, Braidwood, Zion w/ encl

Project Mgr., NRR w/ encl

Document:

R:\\

To receive a copy of this document, indicate in the box "C" - Copy without

attach / encl

"E" = C_opy with attach / enc 1

"h ' - No copy

0FFICE

RIII b

RIII

RIII O,

/

NAME

HiltonYTA

LaTorrer%h

LMille[h

///hN

l0\\hk@\\ '

lI[G[7(/

DATE

'

0FFICIAL RECORD COPY

'

.

-