Forwards Insp Repts 50-266/94-18 & 50-301/94-18 on 940820- 0917.Two Instances of Procedure/Program Inadequacies Noted. Violation of Concern Because One Caused Unnecessary Challenge to safety-related Equipment
ML20149G479
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 10/04/1994
From: Farber M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Link R
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20149G482 List:
References
NUDOCS 9410240008
Download: ML20149G479 (2)


See also: IR 05000266/1994018

Text

.

b

h0blbCl

.

October 4, 1994

Wisconsin Electric Power Company

-

ATTN: Mr. R. E. Link

Vice President

Nuclear Power

231 West Michigan Street - P379

Milwaukee, WI 53201

Dear Mr. Link:

This refers to the routine safety inspection conducted by Messrs. T. Kobetz,

A. McMurtray and others of this office, from August 20 through September 17,

1994, of activities at the Point Beach Nuclear Plant Units 1 and 2. Our

findings were discussed with Mc G. J. Maxfield and members of his staff at the

conclusion of the inspection.

No violations of NRC requirements were identified during the course of this

inspection.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

and representative records, interviews with personnel, and observations.

During this inspection period most activities were conducted appropriately;

however, two instances of procedure / program inadequacies were noted. Although

individually these were only of minor safety significance, collectively they

are of concern because one caused an unnecessary challenge to safety related

equipment and both forced unnecessary entries into Technical Specification

Limiting Condition for Operation actions.

We will gladly discuss any questions you have concerning this inspection.

Your cooperation with us is appreciated.

Sincerely,

Origimi E9;rd k/ Lbtin 7. Tarb3F

M. J. Farber, Chief

Reactor Projects Section 3A

Docket Nos. 50-266; 50-301

Enclosure: Inspection Reports

No. 50-266/94018(DRP);

No. 50-301/94018(DRP)

See Attached Distribution

g g ,,.i.. . .. , o r sni. . . . i.4i.. . i. in. n.. c . c.,, .iin s .ti..nf i s . c.,, .iin .is..nf. i n-

0FFICE RIII N RIII .

& RIII O RIII M

NAME Bristow[2d Creed k31 Olteanu 4c6 Farber M

DATE

I

10/6/94 10/ V/94 10/// /94 10/#/94

(Para.4.b & 6.a)

0FFICIAL RECORD COPY

21004E

9410240008 941004 -fiat i l

PDR ADOCK 05000266 '

{

G ppg

.

Wisconsin Electric Power Company 2

.

cc w/ enc 1: G. J. Max field, Plant Manager

Virgil Kar<able, Chief

Boiler Section

Cheryl L. Parrino, Chairman,

Wisconsin Public Service

Commission

State liaison Officer

Distribution:

Docket File w/ encl SRI, Point Beach w/ encl

PUBLIC IE-01 w/ enc 1 DRP w/enci

OC/LFDCB w/ encl RIII PRR w/enci

!

l

l

1