h0blbClb
October 4, 1994
.
Wisconsin Electric Power Company
ATTN: Mr. R. E. Link
-
Vice President
Nuclear Power
231 West Michigan Street - P379
Milwaukee, WI 53201
Dear Mr. Link:
This refers to the routine safety inspection conducted by Messrs. T. Kobetz,
A. McMurtray and others of this office, from August 20 through September 17,
1994, of activities at the Point Beach Nuclear Plant Units 1 and 2.
Our
findings were discussed with Mc G. J. Maxfield and members of his staff at the
conclusion of the inspection.
No violations of NRC requirements were identified during the course of this
inspection.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observations.
During this inspection period most activities were conducted appropriately;
however, two instances of procedure / program inadequacies were noted. Although
individually these were only of minor safety significance, collectively they
are of concern because one caused an unnecessary challenge to safety related
equipment and both forced unnecessary entries into Technical Specification
Limiting Condition for Operation actions.
We will gladly discuss any questions you have concerning this inspection.
Your cooperation with us is appreciated.
Sincerely,
Origimi E9;rd k/ Lbtin 7. Tarb3F
M. J. Farber, Chief
Reactor Projects Section 3A
Docket Nos. 50-266; 50-301
Enclosure:
Inspection Reports
No. 50-266/94018(DRP);
No. 50-301/94018(DRP)
See Attached Distribution
g g .i.. . .. , o r sni. .
. . i.4i.. . i. in. n..
c . c.,, .iin s .ti..nf
i s . c.,, .iin .is..nf.
i
n-
,,
0FFICE
RIII
N
RIII
&
RIII
O
RIII
M
.
NAME
Bristow[2d
Creed
k31
Olteanu
4c6
Farber M
I
DATE
10/6/94
10/ V/94
10/// /94
10/#/94
(Para.4.b & 6.a)
0FFICIAL RECORD COPY
21004E
-fiat i
9410240008 941004
l
ADOCK 05000266
{
'
G
ppg
.
Wisconsin Electric Power Company
2
.
cc w/ enc 1:
G. J. Max field, Plant Manager
Virgil Kar<able, Chief
Boiler Section
Cheryl L. Parrino, Chairman,
Wisconsin Public Service
Commission
State liaison Officer
Distribution:
Docket File w/ encl
SRI, Point Beach w/ encl
PUBLIC IE-01 w/ enc 1
DRP w/enci
OC/LFDCB w/ encl
RIII PRR w/enci
l