Submits Unit 1 Steam Generators Aug 1994 EOC-9 Refueling Outage,Nrc Insp Repts.Listed Quantities of Tubes Removed from Svc or Repaired
ML20149G093
Person / Time
Site: McGuire Duke Energy icon.png
Issue date: 09/23/1994
From: Mcmeekin T
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9409300028
Download: ML20149G093 (70)


Text

F1.

i

~

;s -

'l l

DukeIbwerCompany T. C McMans McGuire Nuclear Generatson Deparvnent l' ice hesident J

12700Hagers ferryRoad(MG01\\P)

(704)8754800 -

l HuntersvWe.NC28078A985 (704)8754809 fax

?

t e--

t i

September 23,1994 i

i U. S. Nuclear Regulatory Commission Document Control Desk Washington, D.C. 20555

-[

Subject:

McGuire Nuclear Station

}

Unit 1 Steam Generators August 1994 EOC-9 Refueling Outage f

NRC Inspection Reports:

j F*,15-Day and 12-Month Pursuant to Technical Specifications 3/45.5.5, part a, b and c, the following information is submitted:

a.

The following information is submitted regarding F* tubes: (The attached lists identify the F* tubes, their location, and the size of degradation.)

Steam Generator Attachment A

1 B

2 C

3 D

4 b.

The following quantities of tubes were removed from service or repaired: (The tubes are identified l

in the attached lists.)

i Slagm Generator Attachment t

A 5

t B

6 C

7 D

8 I

c.

The following quantity of tubes were inspected from either side of the generator:

Steam Generator Attachment f

A 3983 B

4070 C

4147 i

D 3957

~

s 5

9409300028 940923 gDR ADCCK 05000369

. PDR I

rwans on armraw g

U. S. Nuclear Regulatory Commission Document Control Desk September 23,1994 Page 2 d.

The following information is submitted concerning tube indications of imperfections. (The attached lists identify the tubes with imperfections, their locations, and their size.)

Steam Generator Atttachment A

9 B

10 C

11 D

12 Questions or problems should be directed to Kay Crane, Regulatory Compliance at (704) 875-4306.

Very truly yours, kv T. C. McMeekin, Vice President McGuire Nuclear Station Attachments i

i i

i I

1 J

l

'1

-~

U. S. Nuclear Regulatory Commission l

Document Control Desk

' September 23,1994 Page 3 i

e cc:

Mr. Victor Nerses, Project Manager i

Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D.C. 20555 i

Mr. S. D. Ebneter, Regional Administrator 4

U. S. Nuclear Regulatory Commission l

Rer) ion ll 101 Marietta Street, NW - Suite 2900 Atlanta, Georgia 30323 i

Mr. George Maxwell Senior Resident inspector McGuire Nuclear Site i

f k

E e

i i

i I

t t

b I

f t

i

.c

BWNT TUBAN II (Version 2.1) 09/21/1994 11:11:47 McGuire Nuclear Station - Unit One e***************

S/G A 08/94 RFO Bobbin,H/L Tubesheet Page 1 of 1 ATTACID4ENT #1 - F*

F* QUERY TEST TYPE ROW COL IND tTW VOLTS CHN DEG LOCATION EXTENT 1 Bobbin 4 93 IDI 77 9.44 P1 78 TE-HL

+11.86 8TH TSP Bobbin IDI 94 24.23 P 1 54 TE-HL

+16.84 8TH TSP Bobbin 5 62 IDI 84 6.04 P1 74 TE-HL

+15.72 8TH TSP Bobbin 5 108 IDI 84 4.20 P 1 79 TE-HL

+15.72 8TH TSP Bobbin 6 59 IDI 99 2.33 P 1 27 TE-HL

+10.45 F/L Bobbin 9 63 IDI 52 5.27 P1 99 TE-HL

+16.83 F/L H/L Tubesheet SAI 0.79 1 28 TTS-HL

-4.08 TTS-HL Bobbin 10 25 IDI 93 6.71 P 1 39 TE-HL

+17.03 F/L H/L Tubesheet MAI 1.21 1 25 TTS-HL

-4.28 7TS-HL H/L Tubesheet 12 24 MAI 1.09 1 36 TTS-HL

-4.52 TTS-HL Bobbin 13 46 IDI 61 21.02 P 1 19 TE-HL

+B.96 F/L Bobbin IDI 99 26.85 P 1 32 TE-HL

+13.79 F/L Bobbin 13 48 IDI 86 10.39 P 1 55 TE-HL

+2.38 F/L H/L Tubesheet 13 50 VOL 0.53 1 137 TTS-HL

-3.02 TTS-HL Bobbin 15 28 IDI 66 28.33 P 1 23 TE-HL

+3.93 F/L Bobbin IDI 97 31.68 P 1 34 TE-HL

+8.66 F/L Bobbin 15 66 IDI 94 18.42 P 1 43 TE-HL

+1.52 F/L Bobbin 16 84 IDI 58 12.83 P 1 18 TE-HL

+3.73 F/L Bobbin 1G 104 NOI 11.67 P 1 164 TE-HL

+3.45 F/L Bobbin 18 92 NQI 7.41 P 1 160 TE-HL

+13.87 F/L Bobbin 19 105 NOI 6.39 P 1 182 TE-HL

+7.34 F/L Bobbin 20 86 ODI 10 3.72 P 1 137 TE-HL

+13.09 F/L Bobbin 21 27 IDI 88 1.81 P 1 49 TE-HL

+10.21 F/L H/L Tubesheet 22 86 MAI 1.59 1 25 TTS-HL

-3.69 TTS-HL Bobbin 26 46 IDI 57 4.59 P 1 95 TE-HL

+11.16 F/L Bobbin 26 64 IDI 30 5.99 P 1 113 TE-HL

+14.15 F/L Bobbin 26 82 IDI 87 18.04 P 1 49 TE-HL

+16.05 F/L Bobbin 26 84 IDI 90 17.93 P 1 43 TE-HL

+14.98 F/L Bobbin IDI 94 46.99 P 1 37 TE-HL

+14.01 F/L Bobbin 27 53 IDI 94 8.32 P 1 44 TE-HL

+4.49 F/L Bobbin 29 65 NQI 3.48 P 1 49 TE-HL

+10.87 F/L Bobbin 29 80 IDI 79 11.11 P 1 70 TE-HL

+13.13 F/L Bobbin 35 42 NOI 5.40 P 1 12 TE-HL

+6.43 F/L H/L Tubesheet 36 36 VOL 0.61 1 103 TTS-HL

-3.86 TTS-HL Bobbin 37 29 NOI 20.30 P 1 176 TE-HL

+9.38 F/L Bobbin 37 78 IDI 41 10.09 P 1 12 TE-HL

+13.26 F/L Bobbin 47 30 IDI 94 13.87 P 1 31 TE-HL

+8.38 F/L Total Indications Found = 37 Total Tubes Found = 31 Total Tubes in Input File = 31

e BWNT TUBAN II (Version 2.1) 09/22/1994 16:03:06

                    • eeeeee J
                          • eee eee**eee********

McGuire Nuclear Station - Unit One eeeeeee*********

S/G B 1

eeeeeeee********

08/94 RFO Bobbin,H/L Tubesheet Page 1 of 3 ATTACHMENT #2 - F*

F* QUERY TEST TYPE ROW COL IND %TW VOLTS CHN DEG LOCATION EXTENT 1 Bobbin 3

1 IDI 96 16.98 P 1 34 TE-HL

+8.77 BTH TSP Bobbin 3 39 IDI 48 5.40 P 1 106 TE-HL

+5.11 8TH TSP Bobbin 3 47 IDI 99 15.48 P 1 38 TE-HL

+8.00 BTH TSP Bobbin 3 95 IDI 10 3.07 P 1 144 TE-HL

+5.34 BTH TSP Bobbin IDI 55 10.20 P 1 22 TE-HL

+5.99 BTH TSP Bobbin 4

1 IDI 94 24.87 P 1 47 TE-HL

+9.20 BTH TSP Bobbin 5 27 NOI 7.87 P 1 149 TE-HL

+15.68 BTH TSP Bobbin 5 101 IDI 41 12.80 P 1 15 TE-HL

+16.10 8TH TSP Bobbin IDI 54 11.11 P 1 20 TE-HL

+12.35 BTH TSP Bobbin IDI 70 7.27 P 1 26 TE-HL

+9.10 BTH TSP Bobbin IDI 70 11.40 P 1 26 TE-HL

+8.17 8TH TSP Bobbin 5 108 IDI 97 3.40 P 1 35 TE-HL

+12.34 8TH TSP Bobbin 6 34 IDI 88 13.55 P 1 45 TE-HL

+11.47 F/L Bobbin 7

2 IDI 74 15.23 P 1 25 TE-HL

+9.53 F/L Bobbin IDI 82 22.37 P 1 28 TE-HL

+2.92 F/L Bobbin 7 23 IDI 44 10.36 P 1 15 TE-HL

+17.29 F/L Bobbin 7 29 IDI 73 21.00 P 1 22 TE-HL

+10.67 F/L Bobbin 7 42 IDI 47 9.81 P 1 16 TE-HL

+17.22 F/L Bobbin 8 46 IDI 76 13.61 P 1 26 TE-HL

+16.21 F/L Bobbin 8 56 IDI 41 15.12 P 1 12 TE-HL

+14.31 F/L Bobbin 9

2 NOI 8.23 P 1 145 TE-HL

+11.31 F/L Bobbin 9

3 IDI 73 16.79 P 1 67 TE-HL

+7.47 F/L Bobbin 9 100 IDI 34 7.45 P 1 11 TE-HL

+12.36 F/L H/L Tubesheet 10 14 SAI 0.49 1 37 TTS-HL

-2.54 TTS-HL Bobbin 10 21 IDI 62 10.80 P 1 21 TE-HL

+4.81 F/L Bobbin 10 50 IDI 47 11.27 P 1 16 TE-HL

+15.01 F/L Bobbin 11 30 IDI 88 13.32 P 1 50 TE-HL

+6.40 F/L Bobbin 11 52 IDI 87 15.76 P 1 51 TE-HL

+11.32 F/L H/L Tubesheet 11 64 SAI 0.72 1 25 TTS-HL

-3.57 TTS-HL H/L Tubesheet 11 85 SAI 0.61 1 40 TTS-KL

-3.30 TTS-HL Bobbin 11 86 IDI 83 34.28 P 1 51 TE-HL

+17.88 F/L H/L Tubesheet 11 102 MAI 2.40 1 39 TTS-HL

-3.77 TTS-HL Bobbin 11 112 IDI 50 20.87 P 1 17 TE-HL

+3.30 F/L Bobbin 12 18 IDI 74 10.98 P 1 65 TE-HL

+12.02 F/L Bobbin 12 29 IDI 82 26.24 P 1 28 TE-HL

+3.10 F/L Bobbin 12 72 IDI 44 11.91 P 1 15 TE-KL

+5.64 F/L H/L Tubesheet 12 84 SAI 1.01 1 33 TTS-HL

-3.18 TTS-HL Bobbin 13 47 IDI 82 16.17 P 1 55 TE-HL

+4.37 F/L Bobbin 14 41 IDI 76 7.66 P 1 64 TE-HL

+14.02 F/L Bobbin 14 42 IDI 41 9.54 P 1 105 TE-HL

+17.16 F/L H/L Tubesheet 14 78 MAI 3.38 1 27 TTS-HL

-3.15 TTS-HL Bobbin 15 15 IDI 53 3.58 P 1 91 TE-HL

+13.94 F/L Bobbin 15 20 IDI 1

6.58 P 1 157 TE-HL

+6.36 F/L Bobbin IDI 9

5.72 P 1 147 TE-HL

+11.84 F/L Bobbin IDI 52 8.29 P 1 94 TE-HL

+5.41 F/L Bobbin 15 32 IDI 64 7.78 P 1 78 TE-HL

+17.07 F/L H/L Tubesheet SAI 6.07 1 44 TTS-HL

-4.22 TTS-HL Bobbin 16 38 IDI 94 58.62 P 1 42 TE-HL

+17.33 F/L Bobbin 16 44 IDI 60 5.00 P 1 21 TE-HL

+6.07 F/L Bobbin 17 26 ODI 40 7.22 P 1 106 TE-HL

+13 74 F/L Bobbin 17 38 NOI 8.47 P 1 160 TE-HL

+13.66 F/L Bobbin NQI 11.77 P 1 160 TE-HL

+13.94 F/L Bobbin 17 68 IDI 33 3.66 P 1 117 TE-HL

+4.51 F/L Bobbin 17 70 NQI 19.42 P 1 162 TE-HL

+7.94 F/L Bobbin 17 80 IDI 25 20.46 P 1 128 TE-HL

+1.83 F/L Bobbin 17 96 NQI 2.81 P 1 55 TE-HL

+6.74 F/L Bobbin 17 101 IDI 63 10.07 P 1 22 TE-HL

+8.43 F/L Bobbin 18 37 NOI 9.74 P 1 164 TE-HL

+10.06 F/L Bobbin 18 40 IDI 75 12.01 P 1 67 TE-HL

+9.01 F/L Bobbin 19 31 NOI 8.73 P 1 147 TE-HL

+14.98 F/L Bobbin 19 32 IDI 75 9.57 P 1 58 TE-HL

+16.88 F/L H/L Tubesheet SAI 11.27 1 27 TTS-HL

-4.34 TTS-HL Bobbin 20 32 IDI 37 9.34 P 1 104 TE-HL

+6.64 F/L Bobbin 20 61 NOI 12.37 P 1 161 TE-HL

+11.27 F/L Bobbin 21 10 NQI 4.22 P 1 160 TE-HL

+12.19 F/L

l t

BWNT TUBAN II (Version 2.1) 09/22/1994 16:03:06 1*********,,******

McGuire Nuclear Station - Unit One S/G B

  • +**************

08/94 RFO Bobbin,H/L Tubesheet ATTACHMENT #2 - F*

F* QUERY TEST TYPE ROW COL IND tTW VOLTS CHN DEG LOCATION EXTENT 1 Bobbin 21 11 IDI 1

5.58 P 1 152 TE-HL

+15.06 F/L Bobbin IDI 26 2.16 P 1 119 TE-HL

+16.99 F/L Bobbin 21 12 IDI 28 5.16 P 1 116 TE-HL

+14.09 F/L Bobbin 21 30 IDI 39 6.97 P 1 106 TE-HL

+14.04 F/L Bobbin IDI 97 14.02 P 1 34 TE-HL

+3.78 F/L Bobbin IDI 98 44.01 P 1 37 TE-HL

+2.78 F/L Bobbin 21 31 IDI 76 10.17 P 1 57 TE-HL

+14.83 F/L Bobbin 21 37 IDI 45 16.24 P 1 13 TE-HL

+1.85 F/L Bobbin 21 42 IDI 60 B.13 P 1 76 TE-HL

+17.95 F/L H/L Tubesheet MAI 5.66 1 27 TTS-HL

-3.41 TTS-HL Bobbin 21 64 NQI 9.73 P 1 163 TE-HL

+8.30 F/L Bobbin 22 10 IDI 53 5.40 P 1 84 TE-HL

+9.04 F/L Bobbin 22 1R IDI 19 2.63 P 1 128 TE-HL

+16.86 F/L Bobbin IDI 54 6.89 P 1 83 TE-HL

+15.85 F/L Bobbin IDI 95 26.00 P 1 35 TE-HL

+5.74 F/L Bobbin 22 35 NOI 18.96 P 1 177 TE-HL

+4.34 F/L Bobbin 22 36 IDI 46 14.42 P 1 16 TE-HL

+3.74 F/L Bobbin 22 42 NOI 8.78 P 1 160 TE-HL

+4.49 F/L Bobbin 22 52 IDI 64 8.58 P 1 76 TE-HL

+16.90 F/L Bobbin 23 19 IDI 64 11.75 P 1 70 TE-HL

+16.02 F/L Bobbin 23 20 IDI 1

5.06 P 1 142 TE-HL

+14.96 F/L Bobbin IDI 50 10.90 P 1 13 TE-HL

+3.93 F/L Bobbin IDI 60 6.28 P 1 75 TE-HL

+10.21 F/L Bobbin 23 26 IDI 66 9.69 P 1 68 TE-HL

+14.04 F/L Bobbin 23 34 NOI 36.93 P 1 38 TE-HL

+2.77 F/L Bobbin 23 36 IDI 90 4.26 P 1 39 TE-HL

+1.76 F/L Bobbin 23 39 IDI 1

5.14 P 1 142 TE-HL

+14.13 F/L Bobbin 23 41 IDI 78 20.21 P 1 53 TE-HL

+15.04 F/L Bobbin IDI 99 21.37 P 1 27 TE-HL

+1.82 F/L Boh in 23 42 IDI 27 6.58 P 1 121 TE-HL

+15.09 F/L Bollin 23 44 IDI 2

5.91 P 1 154 TE-HL

+5.35 F/L Bobbin 23 45 NQI 9.84 P 1 160 TE-HL

+16.93 F/L Bobbin IDI 9

5.57 P 1 145 TE-HL

+15.02 F/L Bobbin 23 48 IDI 23 6.51 P 1 126 TE-HL

+13.13 F/L Bobbin 24 16 IDI 68 7.43 P 1 72 TE-HL

+10.31 F/L Bobbin 24 25 IDI 81 17.30 P 1 56 TE-HL

+17.86 F/L H/L Tubesheet MAI 14.51 1 30 TTS-HL

-5.28 TTS-HL Bobbin 24 28 IDI 94 21.93 P 1 31 TE-HL

+9.48 F/L Bobbin 24 49 NOI 6.43 P 1 168 TE-HL

+15.12 F/L Bobbin 24 50 IDI 78 13.93 P 1 60 TE-HL

+16.06 F/L Bobbin 24 52 NQI 4.94 P 1 160 TE-HL

+16.01 F/L Bobbin 25 33 IDI 31 0.74 P 1 113 TE-HL

+9.28 F/L Bobbin 25 34 IDI 32 5.12 P 1 112 TE-HL

+6.38 F/L Bobbin IDI 41 4.79 P 1 102 TE-HL

+3.43 F/L Bobbin IDI 41 7.56 P 1 102 TE-HL

+10.26 F/L Bobbin 25 42 NQI 9.39 P 1 140 TE-HL

+5.33 F/L Bobbin 25 44 NOI 8.75 P 1 155 TE-HL

+4.43 F/L Bobbin 25 50 NQI 4.99 P 1 147 TE-HL

+8.27 F/L Bobbin.

IDI 58 8.33 P 1 83 TE-HL

+9.25 F/L Bobbin 25 92 NOI 13.26 P 1 27 TE-HL

+13.99 F/L Bobbin 26 36 IDI 33 5.55 P 1 112 TE-HL

+4.36 F/L H/L Tubesheet 26 80 SAI 3.47 1 46 TTS-HL

-3.02 TTS-HL Cobbin 27 16 IDI 89 63.39 P 1 48 TE-HL

+11.09 F/L Bobbin 27 42 NOI 7.97 P 1 159 TE-HL

+8.80 F/L Bobbin ODI-6 7.51 P 1 136 TE-HL

+13.97 F/L Bobbin 27 66 IDI 67 10.14 P1 71 TE-HL

+16.41 F/L Bobbin IDI 72 8.16 P 1 65 TE-HL

+12.46 F/L H/L Tubesheet MAI 13.29 1 29 TTS-HL. 8 7 TTS-HL H/L Tubesheet 27 70 MAI 0.51 1 32 TTS-HL

-4.11 TTS-HL Bobbin 27 106 NQI 39.54 P 1 186 TE-HL

+3.04 F/L Bobbin 28 90 IDI 66 2.88 P 1 73 TE-HL

+13.97 F/L BobbiT 28 100 IDI 69 12.81 P 1 69 TE-HL

+11.53 F/L Bobbin 29 28 IDI 9

5.29 P 1 141 TE-HL

+16.83 F/L H/L Tubesheet 30 77 MAI 1.23 1 35 TTS-HL

-4.05 TTS-HL Bobbin 31 56 IDI 89 14.81 P 1 42 TE-HL

+15.66 F/L

4 0

BWNT TUBAN II (Version 2.1) 09/22/1994 16:03:06 l

  • e******ee******

McGuire Nuclear Station - Unit One eee***e*********

S/G B

}

08/94 RFO

[

Bobbin,H/L Tubesheet i

I Page 3 of 3 ATTACHMENT #2 - F*

F*-QUERY i

i TEST TYPE ROW COL IND %TW VOLTS CHN DEG LOCATION EXTENT 1 Bobbin 31 59 IDI 75 10.23 P 1 66 TE-HL

+11.00 F/L f

Bobbin 31 60 IDI 24 4.42 P 1 126 TE-HL

+15.06 F/L i

Bobbin 31 66 IDI 4

5.45 P 1 142 TE-HL

+8.10 F/L Bobbin 31 68 NOI 7.06 P 1 156 TE-HL

+12.25 F/L

[

Bobbin 31 72 NQI 4.76 P 1 161 TE-HL

+15.98 F/L I

Bobbin NQI 15.87 P 1 146 TE-HL

+13.38 F/L i

Dobbin 31 73 IDI 6

5.45 P 1 140 TE-KL

+10.48 F/L

-[

Bobbin 32 56 IDI 72 8.85 P 1 63 TE-HL

+18.05 F/L i

H/L Tubesheet SAI 8.74 1 26 TTS-HL

-3.61 TTS-KL i

Bobbin 32 64 NQI 7.59 P 1 163 TE-HL

+16.32 F/L i

Bobbin 32 103 IDI 63 7.76 P 1 25 TE-HL

+7.32 F/L i

Bobbin 33 16 IDI 43 6.02 P 1 97 TE-HL

+8.99 F/L Bobbin 33 66 IDI 83 21.45 P 1 33 TE-HL

+6.13 F/L Bobbin 34 24 IDI 96 20.08 P 1 39 TE-HL

+1.46 F/L Cobbin 34 45 IDI 91 7.99 P 1 31 TE-HL

+1.40 F/L Bobbin 34 57 IDI 2

6.63 P 1 151 TE-HL

+13.86 F/L Bobbin 34 64 IDI 2

11.54 P 1 159 TE-HL

+11.51 F/L t

Bobbin 35 35 NOI 8.16 P 1 158 TE-HL

+3.53 F/L Bobbin 35 39 IDI 40 8.26 P 1 107 TE-HL

+13.98 F/L i

Bobbin 35 99 IDI 67 34.43 P 1 24 TE-HL

+6.45 F/L i

H/L Tubesheet 36 31 MAI 0.68 1 31 TTS-HL

-3.04 TTS-HL Bobbin 36 100 IDI 44 23.24 P1 15 TE-HL

+4.34 F/L 5

Bobbin 37 57 IDI 9 14.37 P 1 144 TE-HL

+14.06 F/L Bobbin 37 85 IDI 86 3.98 P 1 31 TE-HL

+0.16 F/L i

Bobbin 38 30 IDI 87 32.28 P 1 51 TE-HL

+6.33 F/L Bobbin 38 75 IDI 26 5.40 P 1 122 TE-HL

+6.47 F/L' Bobbin 40 88 IDI 13 6.99 P 1 136 TE-HL

+16.92 F/L i

H/L Tubesheet MAI 1.76 1 56 TTS-HL

-4.67 TTS-HL Bobbin 42 77 IDI 72 4.84 P 1 70 TE-HL

+14.03 F/L f

Bobbin 43 88 IDI 38 3.96 P 1 111 TE-HL

+14.46 F/L Bobbin 43 89 NOI 12.21 P 1 22 TE-HL

+16.75 F/L l

H/L Tubesheet MAI 3.24 1 26 TTS-HL

-4.73 TTS-HL Bobbin 44 64 IDI 74 0.64 P 1 68 TE-KL

+15.07 F/L Bobbin 44 83 IDI 8

1.59 P 1 144 TE-KL

+9.34 F/L Bobbin 46 28 IDI 97 10.78 P 1 34 TE-HL

+7.78 F/L i

H/L Tubesheet 47 57 MAI 1.00 1 28 TTS-HL

-4.90 TTS-HL l

Total Indications Found = 166 f

Totcl Tubes Found = 135 t

Total Tubes in Input File = 135

!j l

t I

i

.l t

l I

i i

l l

-)

- ~ - -..-~

- - ~.- - - - -

I e***************

BWNT TUBAN II (Version 2.1) 09/21/1994 14:47:13 McGuire Nuclear Station - Unit One j

S/G C 08/94 RFO Bobbin,H/L Special Interest Page 1 of 1 l

ATTACHMENT #3 - F*

F* QUERY j

TEST TYPE ROW COL IND %TW VOLTS CHN DEG LOCATION EXTENT 1 t

i Bobbin 4

54 IDI 35 10.29 P 1 13 TE-HL

+8.18 9TH TSP Bobbin 5 56 IDI 39 11.60 P 1 22 TE-HL

+16.07 BTH TSP i

Bobbin 5 94 IDI 61 17.88 P 1 23 TE-HL

+6.07 9TH TSP Bobbin 7 94 IDI 46 12,91 P 1 16 TE-HL

+13.36 F/L i

Bobbin IDI 83 10.30 P 1 69 TE-HL

+15.10 F/L Bobbin B 105 IDI 41 14.41 P 1 16 TE-HL

+6.56 F/L t

Bobbin 9 31 IDI 41 1.17 P 1 103 TE-HL

+1.56 F/L l

Bobbin 9 99 IDI 76 11.70 P 1 25 TE-HL

+5.79 F/L Bobbin 13 47 NOI 3.62 P 1 148 TE-HL

+15.04 F/L Bobbin 14 61 IDI 82 16.70 P 1 27 TE-HL

+6.23 F/L Bobbin 14 69 IDI 79 13.77 P 1 26 TE-HL

+7.51 F/L Bobbin 14 98 IDI 54 9.92 P 1 14 TE-HL

+14.01 F/L Bobbin 17 55 NOI 1.93 P 1 134 TE-HL

+12.53 F/L Bobbin 17 61 IDI 74 7.16 P 1 79 TE-HL

+13.66 F/L Bobbin IDI 80 8.57 P 1 28 TE-HL

+14.08 F/L i

Bobbin 19 66 NOI 1.56 P 1 155 TE-HL

+14.63 F/L l

Bobbin 20 64 IDI 42 15.34 P1 13 TE-HL

+8.43 F/L j

Bobbin 22 19 IDI 95 5.83 P 1 45 TE-HL

+10.14 F/L Bobbin 24 82 IDI 57 8.46 P 1 20 TE-HL

+3.35 F/L Bobbin 25 7 NQI 3.36 P 1 147 TE-HL

+11.11 F/L Bobbin 27 31 NQI 1.58 P 1 58 TE-HL

+19.56 F/L j

Bobbin 28 25 NQI 3.00 P 1 159 TE-HL

+11.43 F/L

~

Bobbin 32 27 NOI 7.54 P 1 16 TE-HL

+19.63 F/L Bobbin 32 57 IDI 67 4.82 P 1 24 TE-HL

+3.01 F/L l

Bobbin 36 55 NQI 6.47 P 1 13 TE-HL

+12.79 F/L Bobbin 41 41 NQI 2.06 P 1 40 TE-HL

+15.79 F/L j

i Total Indications Found = 26 l

Total Tubes Found = 24

. l Total Tubes in Input File = 24

}

l h

i

)

)

y

-9..,

,,m-y n -

ww -

-y* - -

-am.-e

---w-


s-----i e-

e I

+

y, s

BWNT TUBAN II (Version 2.1) 09/21/1994 14:52:46 l

McGuire Nuclear Station - Unit One S/G D 08/94 RFO Bobbin,H/L Tubesheet Page 2 of 5 ATTACHMENT #4 - F*

F* QUERY TEST TYPE ROW COL IND %TW VOLTS CHN DEG LOCATION EXTENT 1 Bobbin 9 15 IDI 87 6.56 P 1 27 TE-CL

+15.41 F/L H/L Tubecheet 9 18 SAI 0.92 1 13 TTS-HL

-3.97 TTS-HL Bobbin 9 24 NOI 3.39 P 1 93 TE-HL

+16.18 F/L Bobbin 9 70 IDI 87 5.65 P 1 34 TE-HL

+9.87 F/L Bobbin 9 81 IDI 73 10.02 P 1 76 TE-HL

+7.00 F/L Bobbin IDI 84 6.28 P 1 63 TE-HL

+16.14 F/L Bobbin 9 85 IDI 59 12.72 P 1 23 TE-HL

+10.61 F/L Bobbin 9 98 NOI 3.55 P 1 85 TE-HL

+15.16 F/L Bobbin 10 85 IDI 79 21.43 P 1 31 TE-HL

+11.75 F/L Bobbin 10 87 IDI 82 5.35 P 1 65 TE-HL

+14.05 F/L Bobbin 11 2 IDI 93 2.77 P 1 40 TE-HL

+12.73 F/L Bobbin 11 13 IDI 79 14.56 P 1 23 TE-CL

+17.11 F/L Bobbin 11 17 IDI 38 17.30 P 1 11 TE-HL

+11.04 F/L Bobbin 11 72 IDI 78 16.12 P 1 61 TE-HL

+13.45 F/L Bobbin 11 84 IDI 76 17.08 P 1 64 TE-HL

+13.44 F/L Bobbin IDI 85 7.91 P 1 52 TE-HL

+5.64 F/L Bobbin IDI 89 24.14 P1 47 TE-HL

+10.50 F/L Bobbin 11 85 IDI 93 17.64 P 1 28 TE-HL

+9.61 F/L l

Bobbin 11 89 IDI 100 3.81 P 1 30 TE-HL

+13.84 F/L Bobbin 11 96 IDI 93 9.19 P 1 41 TE-HL

+16.91 F/L H/L Tubesheet MAI 6.52 1 30 TTS-HL

-4.08 TTS-HL Bobbin 11 103 IDI 70 3.57 P 1 71 TE-HL

+14.33 F/L Bobbin 12 30 IDI 60 2.61 P 1 82 TE-HL

+16.60 F/L H/L Tubesheet MAI 2.38 1 29 TTS-HL

-2.86 TTS-HL Bobbin 13 11 IDI 55 14.66 P 1 16 TE-HL

+11.76 F/L Bobbin IDI 86 14.65 P 1 51 TE-HL

+13.08 F/L Bobbin 13 27 IDI 91 17.57 P 1 43 TE-HL

+15.94 F/L Bobbin 13 64 IDI 68 3.72 P 1 23 TE-HL

+11.57 F/L Bobbin 13 65 IDI 76 14.25 P 1 26 TE-HL

+8.20 F/L Bobbin 13 66 IDI 35 17.59 P 1 12 TE-HL

+13.31 F/L Bobbin 13 67 IDI 53 20.51 P 1 18 TE-HL

+4.68 F/L Bobbin 13 72 IDI 58 4.19 P 1 89 TE-HL

+12.31 F/L Bobbin 13 83 IDI 96 14.32 P 1 42 TE-HL

+10.02 F/L H/L Tubesheet 13 87 MAI 0.96 1 17 TTS-HL

-4.52 TTS-HL i

Bobbin 13 89 IDI 95 4.78 P 1 44 TE-HL

+15.28 F/L H/L Tubesheet 13 98 MAI 0.72 1 23 TTS-HL

-4.36 TTS-HL Bobbin 14 38 IDI 1

4.39 P 1 141 TE-HL

+13.68 F/L Bobbin 14 48 IDI 44 5.93 P 1 110 TE-HL

+6.22 F/L Bobbin 14 65 NQI 5.05 P 1 76 TE-HL

+6.58 F/L Bobbin 14 72 IDI 62 13.54 P 1 16 TE-HL

+14.27 F/L H/L Tubesheet 14 91 MAI 0.91 1 28 TTS-HL

-5.00 TTS-HL Bobbin 14 94 IDI 43 10.80 P 1 10 TE-HL

+14.51 F/L Bobbin 15 38 IDI 94 43.70 P 1 49 TE-HL

+15.89 F/L Bobbin 15 59 IDI 94 57.96 P 1 37 TE-HL

+15.44 F/L Bobbin 15 61 IDI 1

2.89 P 1 138 TE-HL

+3.19 F/L Bobbin IDI 2

3.29 P 1 127 TE-HL

+7.95 F/L Bobbin IDI 56 3.57 P 1 84 TE-HL

+11.76 F/L Bobbin 15 64 IDI 25 2.16 P 1 111 TE-HL

+17.08 F/L H/L Tubesheet MAI 2.96 1 34 TTS-HL

-3.60 TTS-HL Bobbin 15 85 IDI 61 8.75 P 1 17 TE-HL

+11.71 F/L Bobbin 16 11 IDI 91 56.53 P 1 54 TE-HL

+14.62 F/L Bobbin 16 13 IDI 91 38.90 P 1 54 TE-HL

+12.71 F/L Bobbin 16 17 IDI 75 17.83 P 1 72 TE-HL

+10.42 F/L Bobbin 16 21 IDI 97 26.77 P 1 44 TE-HL

+18.71 F/L H/L Tubesheet MAI 12.08 1 29 TTS-HL

-4.24 TTS-HL Bobbin 16 41 IDI 86 5.54 P 1 61 TE-HL

+13.96 F/L Bobbin 16 47 IDI 90 4.53 P 1 55 TE-HL

+7.36 F/L Bobbin 16 97 IDI 57 4.09 P 1 20 TE-HL

+9.53 F/L Bobbin IDI 60 2.32 P 1 21 TE-HL

+10.54 F/L Bobbin 17 12 IDI 92 3.80 P 1 47 TE-HL

+17.70 F/L H/L Tubesheet MAI 2.36 1 19 TTS-HL

-3.86 TTS-HL Bobbin 17 15 IDI 90 19.93 P 1 49 TE-HL

+15.73 F/L Bobbin 17 24 IDI 86 4.88 P 1 56 TE-HL

+13.90 F/L Bobbin IDI 88 6.84 P1 30 TE-HL

+13.52 F/L H/L Tubesheet 17 67 MAI 0.70 1 18 TTS-HL

-2.70 TTS-HL

e e

BWUT TUBAN II (Version 2.1) 09/21/1994 14:52:46

{

eeeeeeeeeeeee***

McGuire Nuclear Station - Unit One S/G D eeeeeeee********

08/94 RFO ee**************

Bobbin,H/L Tubesheet Page 3 of 5 ATTACHMENT #4 - F*

F* QUERY TEST TYPE ROW COL IND tTW VOLTS CHN DEG LOCATION EXTENT 1 H/L Tubesheet 17 81 SAI 2.04 1 23 TTS-HL

-3.53 TTS-HL Bobbin 17 85 IDI 32 9.89 P 1 9 TE-HL

+15.31 F/L Bobbin IDI 95 3.11 P 1 36 TE-HL

+15.53 F/L Bobbin 17 90 IDI 77 4.64 P 1 61 TE-HL

+15.39 F/L Bobbin 17 94 IDI 57 12.22 P 1 16 TE-HL

+11.48 F/L Bobbin 18 4 IDI 98 6.81 P 1 37 TE-HL

+10.35 F/L Bobbin 18 16 IDI 94 17.76 P 1 44 TE-HL

+14.82 F/L Bobbin 18 32 NOI 6.40 P 1 154 TE-HL

+6.37 F/L Bobbin 18 34 IDI 88 18.46 P 1 53 TE-HL

+12.46 F/L Bobbin 18 59 IDI 2

10.54 P 1 132 TE-HL

+7.06 F/L Bobbin 18 60 IDI 90 10.03 P 1 46 TE-HL

+10.80 F/L Bobbin 18 80 IDI 13 17.49 P 1 4 TE-HL

+11.81 F/L Bobbin 18 89 IDI 80 4.27 P 1 60 TE-HL

+12.52 F/L Bobbin 18 96 NOI 7.32 P 1 185 TE-HL

+17.12 F/L Bobbin IDI 47 2.54 P 1 14 TE-HL

+12.38 F/L Bobbin IDI 73 2.11 P 1 22 TE-HL

+9.52 F/L Bobbin IDI 95 6.51 P 1 38 TE-HL

+14.28 F/L Bobbin 19 5 NOI 4.26 P 1 166 TE-HL

+10.82 F/L Bobbin 19 22 IDI 47 3.15 P 1 99 TE-HL

+16.84 F/L H/L Tubesheet MAI 3.69 1 18 TTS-HL

-3.69 TTS-HL L

Bobbin 19 23 IDI 57 9.17 P 1 20 TE-HL

+10.35 F/L Bobbin 19 52 IDI 9

3.27 P 1 133 TE-HL

+9.40 F/L Bobbin 19 87 IDI 16 4.48 P 1 129 TE-HL

+12.71 F/L Bobbin 20 24 IDI 83 6.36 P 1 29 TE-HL

+0.48 F/L Bobbin 20 38 IDI 85 9.38 P 1 SP TE-HL

+10.55 F/L Bobbin 20 86 IDI 84 7.19 P 1 32 TE-HL

+1.98 F/L Bobbin 20 90 IDI 96 8.90 P 1 46 TE-HL

+14.44 F/L Bobbin 20 92 IDI 98 11.65 P 1 42 TE-HL

+11.52 F/L Bobbin 21 5 IDI 89 18.47 P 1 31 TE-HL

+0.70 F/L Bobbin 21 34 IDI 85 16.58 P 1 57 TE-HL

+3.08 F/L Bobbin 21 43 IDI 60 25.51 P 1 21 TE-HL

+9.23 F/L Bobbin 22 10 IDI 95 32.34 P 1 44 TE-HL

+16.63 F/L H/L Tubesheet MAI 14.72 1 28 TTS-HL

-4.26 TTS-HL Bobbin 22 13 IDI 80 23.36 P 1 28 TE-HL

+0.74 F/L Bobbin 22 30 IDI 96 5.99 P 1 27 TE-HL

+6.06 F/L Bobbin 22 38 IDI 93 80.58 P 1 39 TE-HL

+17.79 F/L Bobbin 23 11 IDI 78 2.40 P 1 61 TE-HL

+16.56 F/L Bobbin 23 56 IDI 89 3.23 P 1 45 TE-HL

+12.10 F/L Bobbin 23 70 IDI 75 37.20 P 1 30 TE-HL

+7.57 F/L Bobbin IDI 80 7.48 P 1 32 TE-HL

+5.87 F/L Bobbin 23 81 IDI 70 8.89 P 1 28 TE-HL

+11.20 F/L Bobbin 23 83 IDI 58 13.81 P 1 23 TE-HL

+2.80 F/L Bobbin 23 92 IDI 61 12.92 P 1 17 TE-HL

+7.52 F/L Bobbin 24 12 IDI 85 2.51 P 1 51 TE-CL

+13.35 F/L Bobbin IDI 89 4.29 P 1 46 TE-CL

+16.97 F/L Bobbin 24 19 IDI 85 10.51 P 1 51 TE-HL

+17.59 F/L H/L Tubesheet MAI 6.44 1 33 TTS-HL

-3.41 TTS-HL 7

Bobbin 24 20 IDI 79 4.11 P 1 59 TE-HL

+16.00 F/L i

Bobbin 24 22 IDI 93 1.38 P 1 26 TE-HL

+15.79 F/L Bobbin 24 23 IDI 69 8.30 P 1 72 TE-HL

+16.77 F/L H/L Tubesheet MAI 7.39 1 24 TTS-HL

-4.27 TTS-HL Bobbin 24 26 IDI 43 18.46 P 1 12 TE-HL

+4.79 F/L Bobbin 25 44 IDI 21 2.46 P 1 129 TE-HL

+7.76 F/L Bobbin 25 54 IDI 6 f.

18.23 P 1 21 TE-HL

+12.08 F/L Bobbin 26 17 IDI 4 *.

21.71 P 1 15 TE-HL

+11.69 F/L Bobbin 26 40 ILI 88 7.84 P1 28 TE-HL

+16.42 F/L Bobbin 26 66 IDI 79 9.29 P 1 22 TE-HL

+10.47 F/L Bobbin 27 17 NQI 2.50 P 1 136 TE-HL

+10.90 F/L Bobbin 27 18 IDI 86 2.78 P 1 48 TE-HL

+16.58 F/L H/L Tubesheet SAI 1.30 1 48 TTS-HL

-4.24 TTS-HL Bobbin 27 30 IDI 32 13.01 P 1 9 TE-HL

+10.59 F/L Bobbin 27 35 IDI 82 1.99 P 1 54 TE-HL

+16.54 F/L Bobbin 27 36 IDI 36 9.44 P1 10 TE-HL

+8.24 F/L Bobbin 27 69 IDI 74 33.83 P 1 25 TE-HL

+3.12 F/L Bobbin 27 82 IDI 71 6.22 P 1 24 TE-HL

+11.37 F/L

~.

j BWNT TUBAN II (Version 2.1) 09/21/1994 14:52:46 l

McGuire Nuclear Station - Unit One j

e***************

S/G D i

08/94 RFO Bobbin,H/L Tubesheet l

ATTACHMENT #4 - F*

F* QUERY i

TEST TYPE ROW COL IND %TW VOLTS CHN DEG LOCATION EXTENT 1 j

Bobbin 28 15 IDI 39 3.20 P I 11 TE-HL

+9.73 F/L Bobbin 28 24 IDI 79 2.06 P 1 22 TE-HL

+13.55 F/L Bobbin 28 26 IDI 43 8.31 P 1 12 TE-HL

+10.38 F/L Bobbin 28 70 IDI 94 42.03 P 1 39 TE-HL

+4.69 F/L H/L Tubesheet MAI 1.14 1 55 TTS-HL

-3.05 TTS-HL Bobbin 28 75 IDI 47 8.48 P 1 16 TE-HL

+4.19 F/L Bobbin 28 81 IDI 53 10.20 P 1 18 TE-HL

+7.23 F/L Bobbin 28 85 IDI 100 6.79 P 1 34 TE-HL.

+9.93 F/L Bobbin 29 11 NOI 2.15 P 1 137 TE-HL

+17.42 F/L H/L Tubesheet MAI 2.26 1 17 TTS-HL

-3.64 TTS-KL 1

Bobbin 29 20 IDI 24 1.21 P 1 112 TE-HL

+16.85 F/L H/L Tubesheet SAI 0.76 1 50 TTS-HL

~-4.14 TTS-HL r

H/L Tubesheet 29 21 SAI 0.83 1 24 TTS-HL

-4.45 TTS-HL i

H/L Tubesheet 29 23 SAI 0.99 1 22 TTS-HL

-3.65 TTS-HL l

Bobbin 29 34 IDI 85 8.14 P1 50 TE-HL

+16.44 F/L I

Bobbin 29 36 IDI 25 5.68 P 1 7 TE-HL

+14.50 F/L Bobbin 29 43 IDI 93 2.30 P 1 39 TE-HL

+17.41 F/L i

H/L Tubesheet MAI 2.67 1 35 TTS-HL

-3.51 TTS-HL f

Bobbin 29 44 IDI 39 7.11 P 1 11 TE-HL

+15.37 F/L r

Bobbin IDI 43 10.90 P 1 12 TE-HL

+4.55 F/L Bobbin IDI 50 12.63 P 1 14 TE-HL

+1.86 F/L Bobbin 29 45 IDI 46 9.98 P 1 13 TE-HL

+7.24 F/L l

Bobbin 29 46 IDI 64 8.19 P 1 18 TE-HL

+12.49 F/L Bobbin 29 47 IDI 43 10.18 P 1 12 TE-HL

+13.62 F/L l

Bobbin 29 49 IDI 20 6.26 P 1 115 TE-HL

+16.95 F/L Bobbin 29 54 IDI 93 3.07 P 1 39 TE-HL

+10.53 F/L Bobbin 29 65 IDI 91 2.15 P 1 42 TE-HL

+8.29 F/L Bobbin 29 66 IDI 33 12.03 P 1 9 TE-HL

+10.47 F/L t

Bobbin IDI 89 10.70 P 1 24 TE-HL

+12.36 F/L l

H/L Tubesheet MAI' O.37 1 33 TTS-HL

~3.41 TTS-KL Bobbin 29 67 IDI 99 21.10 P'1 29 TE-HL

+10.68 F/L Bobbin 29 75 ODI 81 9.53 P 1 22 TE-HL

+2.17 F/L l

Bobbin 29 77 NOI 3.13 P 1 157 TE-HL

+10.73 F/L I

Bobbin 30 39 IDI 94 11.04 P1 33 TE-HL

+2.97 F/L Bobbin 30 40 IDI 17 5.00 P 1 6 TE-HL

+9.68 F/L j

Bobbin 30 61 IDI 86 4.84 P 1 50 TE-HL

+7.92 F/L Bobbin IDI 89 9.85 P 1 24 TE-HL

+6.00 F/L r

Bobbin 30 62 IDI 70 2.36 P 1 70 TE-HL

+16.80 F/L H/L Tubesheet MAI 2.08 1 30 TTS-HL

-3.85 TTS-HL l

Bobbin 30 64 IDI 86 4.56 P 1 49 TE-HL

+6.46 F/L r

Bobbin 30 66 IDI 56 1.68 P 1 85 TE-HL

+14.53 F/L i

Bobbin 30 68 IDI 91 6.94 P 1 51 TE-HL

+11.81

-F/L Bobbin

- 30 69 IDI 70 5.55 P 1 19 TE-HL

+1.98 F/L Bobbin IDI 92 6.63 P 1 40 TE-HL

+7.56 F/L Bobbin 30 70 IDI 81 14.29 P 1 22 TE-HL

+3.08 F/L i

Bobbin 30 76 IDI 52 5.35 P 1 14 TE-HL

+13.71 F/L i

Bobbin IDI 95 7.55 P 1 36 TE-HL

+5.85 F/L l

Bobbin 30 77 IDI 59 23.72 P 1 20 TE-HL

+12.72 F/L Bobbin 30 80 IDI 82 6.66 P 1 55 TE-HL

+13.89 F/L Bobbin 30 100 IDI 56 0.95 P 1 84 TE-HL

+14.95 F/L-Bobbin 31 14 IDI 99 11.09 P 1 37 TE-HL

+12.56 F/L i

Bobbin 31 38 IDI 94 70.52 P 1 44 TE-HL

+15.25 F/L l

H/L Tubesheet 31 42 SAI 0.73 1 19 TTS-HL

-2.51 TTS-HL Bobbin 31 70 IDI 88 18.77 P 1 30 TE-HL

+3.48 F/L i

Bobbin 31 100 IDI 97 5.17 P 1 34 TE-HL

+11.37 F/L Bobbin 32 22 NQI 2.81 P 1 132 TE-HL

+8.75 F/L i

Bobbin IDI 5

1.29 P 1 126 TE-CL

+15.28 F/L l

Bobbin 32 35 IDI 39 9.16 P 1 12 TE-HL

+15.38 F/L Bobbin 32 43 IDI 55 1.43 P 1 17 TE-HL

+5.80 F/L Bobbin IDI 71 8.83 P 1 22 TE-HL

+7.37 F/L Bobbin 32 62 IDI 100 5.91 P 1 34 TE-HL

+5.63 F/L Bobbin 33 20 IDI 32 9.88 P 1 37 TE-HL

+9.51 F/L j

Bobbin 33 33 IDI 91 4.77 P 1 43 TE-HL

+17.45 F/L L

H/L Tubesheet MAI 3.40 1 21 TTS-HL

-3.60 TTS-HL j

H/L Tubesheet 33 54 SAI 0.95 1 18 TTS-HL

-3.19 TTS-HL t

u

-~

e

{

BWNT TUBAN II (Version 2.1) 09/21/1994 14:52:46 McGuire Nuclear Station - Unit One S/G D 08/94 RFO Bobbin,H/L Tubesheet Page 5 of 5 g, p, F* QUERY t

TEST TYPE ROW COL IND %TW VOLTS CHN DEG LOCATION EXTENT 1

. Bobbin 34 15 IDI 28 1.88 P 1 119 TE-HL

+9.79 F/L l

Bobbin 34 37 NOI 7.59 P 1 166 TE-HL

+7.71 F/L Bobbin 34 73 IDI 85 15.73 P 1 53 TE-HL

+13.41 F/L Bobbin 34 75 IDI 72 2.85 P 1 68 TE-HL

+13.40 F/L t

Bobbin 34 81 IDI 94 9.05 P 1 42 TE-HL

+8.75 F/L Bobbin 35 17 NOI 3.85 P 1 25 TE-HL

+13.68 F/L Bobbin 35 29 IDI 98 4.97 P 1 28 TE-HL

+13.51 F/L Bobbin 35 38 NOI 2.93 P 1 39 TE-HL

+16.41 F/L l

Bobbin 35 58 IDI 71 9.86 P 1 22 TE-HL

+14.19 F/L l

Bobbin 36 29 IDI 69 0.70 P 1 77 TE-HL

+6.62 F/L i

Bobbin 36 80 NOI 4.78 P 1 155 TE-HL

+16.42 F/L l

Bobbin 37 26 IDI 61 16.22 P 1 20 TE-HL

+11.40 F/L j

Bobbin 37 86 IDI 68 12.80 P 1 21 TE-HL

+12.71 F/L i

Bobbin 38 24 IDI 73 11.41 P 1 24 TE-HL

+13.60 P/L r

Bobbin 38 53 IDI 94 11.04 P1 31 TE-HL

+11.55 F/L l

Bobbin 38 63 IDI 78 9.98 P 1 64 TE-HL

+13.11 F/L l

Bobbin 38 66 IDI 90 8.29 P 1 48 TE-HL

+12.12 F/L f

Bobbin 39 34 IDI 53 7.23 P 1 18 TE-HL

+8.44 F/L Bobbin IDI 87 10.40 P 1 54 TE-HL

+17.73 F/L H/L Tubesheet MAI 3.84 1 33 TTS-HL

-3.86 TTS-HL Bobbin 39 52 IDI 92 18.33 P 1 46 TE-HL

+12.79 F/L i

Bobbin 39 67 IDI 76 6.38 P 1 68 TE-HL

+13.70 F/L

'i Bobbin 39 72 IDI 81 1.94 P 1 62 TE-HL

+15.37 F/L Bobbin 39 75 IDI 70 1.96 P 1 76 TE-H1

+11.70 F/L Bobbin IDI 93 7.85 P 1 46 TE-HL

+11.24 F/L f

Bobbin 39 84 IDI 94 6.95 P 1 32 TE-HL

+11.87 F/L Bobbin 40 38 NOI 2.76 P 1 145 TE-HL

+7.14 F/L i

Bobbin 40 52 IDI 80 7.94 P 1 62 TE-HL

+16.33 F/L H/L Tubesheet SAI 3.12 1 53 TTS-HL

-4.36 TTS-HL t

Bobbin 40 61 NQI 1.03 P 1 140 TE-HL

+9.76 F/L Bobbin 40 62 IDI 90 6.72 P 1 50 TE-HL

+12.14 F/L Bobbin 40 75 IDI 93 15.61 P 1 44 TE-HL

+8.93 F/L Bobbin-41 53 IDI 76 4.84 P 1 64 TE-HL

+15.53 F/L i

Bobbin 42 25 IDI 60 11.50 P 1 18 TE-HL

+16.61 F/L I

Bobbin 42 51 IDI 98 10.51 P 1 33 TE-HL

+14.70 F/L l

H/L Tubesheet 42 70 MAI 3.38 1 17 TTS-HL

-3.58 TTS-HL Bobbin 43 71 IDI 53 13.21 P 1 17 TE-HL

+5.01 F/L t

Bobbin IDI 86 6.67 P 1 53 TE-HL

+6.15 F/L Bobbin 44 33 NOI 3.28 P 1 139 TE-HL

+9.88 F/L Bobbin 44 37 IDI 92 17.86 P 1 36 TE-HL

+15.50 F/L i

Bobbin 44 54 IDI 29 4.37 P 1 110 TE-HL

+11.12 F/L i

Bobbin 44 90 IDI 83 2.68 P 1 58 TE-HL

+9.22 F/L Bobbin 45 60 IDI 40 4.21 P 1 107 TE-HL

+5.57 F/L j

Bobbin 45 61 IDI 12 9.37 P 1 4 TE-HL

+13.24 F/L l

' Bobbin 45 67 IDI 95 7.18 P 1 42 TE-HL

+15.38 F/L

.6 38 IDI 93 2.10 P 1 26 TE-HL

+16.36 F/L I

Bobbin 4

Bobbin 46 48 IDI 95 18.97 P 1 35 TE-HL

+5.15 F/L Bobbin 47 35 NQI 5.15 P 1 145 TE-HL

+14.53 F/L

't H/L Tubesheet SAI 0.89 1 16 TTS-HL

-3.81 TTS-HL i

Bobbin 47 42 IDI 95 1.47 P 1 35 TE-HL

+2.60 F/L l

. Bobbin IDI-99 44.56 P 1 29 TE-HL

+1.62 F/L-f

.H/L Tubesheet 48 30 SAI 1.92 1 28 TTS-HL

-3.69 TTS-HL l

-Bobbin-48 52 IDI 86 4.51 P 1 51 TE-HL

+16.32 F/L' Bobbin 49 36 IDI 56 11.88 P 1 14 TE-HL

+13.54 F/L Bobbin' 49 40 NQI 1.04 P 1 44 TE-HL

+17.22 F/L Bobbin 49 43 IDI 30 2.60 P 1 113 TE-HL

+15.33 F/L H/L Tubesheet 49 56 SAI 1.25 1 10 TTS-HL

-3.09 TTS-HL Totel Indications Found = 317 Total Tubes Found = 257

- Total Tubes in Input File = 257 4

_-, u,

.l

F 4-4 t

BWNT TUBAN II (Version 2.1) 09/21/1994 14:52:46 McGuire Nuclear Station - Unit One S/G D 4

08/94 RFO e**************+

Bobbin,H/L Tubesheet

.j Page 1 of 5 h

ATTACHMENT #4 - F*

l F* QUERY TEST TYPE ROW COL IND %TW VOLTS CHN DEG LOCATION EXTENT 1 l

Bobbin 2 29 IDI 45 13.21 P 1 18 TE-HL

+5.46 8TH TSP Bobbin 2 39 IDI 96 5.55 P 1 51 TE-HL

+10.71 BTH TSP Bobbin 2 61 IDI 70 3.70 P 1 87 TE-HL

+13.63 8TH TSP Bobbin IDI 93 0.92 P 1 50 TE-HL

+17.76 8TH TSP Bobbin IDI 95 12.91 P 1 45 TE-HL

+8.60 BTH TSP Bobbin 2 62 NOI 4.15 P 1 150 TE-HL

+13.35 BTH TSP i

Bobbin 2 76 IDI 58 5.87 P 1 19 TE-HL

+15.21 8TH TSP Bobbin 2 80 IDI 55 13.64 P1 18 TE-HL

+12.10 8TH TSP Bobbin 2 85 IDI 91 9.18 P 1 54 TE-HL

+10.00 8TH TSP Bobbin 3 27 NQI 2.45 P 1 134 TE-HL

+17.51 8TH TSP H/L Tubesheet SAI 2.64 1 32 TTS-HL

-4.07 TTS-HL i

Bobbin 3 36 IDI 92 5.28 P 1 50 TE-HL

+16.49 BTH TSP Bobbin 3 40 IDI 46 16.00 P 1 16 TE-HL

+16.21 8TH TSP r

Bobbin 3 110 IDI B2 3.15 P 1 27 TE-HL

+7.80 8TH TSP L

Bobbin 4 33 IDI 64 8.87 P 1 21 TE-HL

+11.03 BTH TSP Bobbin 4 41 NOI 4.95 P 1 150 TE-KL

+8.26 8TH TSP P

Bobbin 4 66 IDI 76 2.73 P 1 77 TE-HL

+6.42 BTH TSP f

Bobbin 4 68 IDI 85 3.22 P 1 28 TE-EL

+11.23 BTH TSP Bobbin 4 78 IDI 95 3.63 P 1 45 TE-HL

+12.28 8TH TSP Bobbin 4 84 IDI 68 5.48 P 1 88 TE-HL

+10.25 8TH TSP l

Bobbin 4 94 IDI 36 19.22 P 1 12 TE-HL

+12.20 8TH TSP H/L Tubesheet 4 97 SAI 1.26 1 39 TTS-HL

-4.07 TTS-HL Bobbin 4 100 IDI 20 4.76 P 1 121 TE-HL

+4.96 8TH TSP l

Bobbin 5

4 IDI 58 13.82 P 1 19 TE-HL

+15.48 BTH TSP Bobbin 5

7 IDI 91 6.66 P 1 54 TE-HL

+11.88 8TH TSP Bobbin 5 31 IDI 55 15.90 P 1 18 TE-HL

+3.14 8TH TSP Bobbin IDI 74 3.63 P 1 80 TE-HL

+13.33 BTH TSP Bobbin 5 44 IDI 55 9.30 P 1 18 TE-HL

+5.95 BTH TSP Bobbin 5 61 IDI 85 4.86 P 1 64 TE-HL

+14.32 8TH TSP Bobbin 5 67 IDI 99 5.12 P 1 34 TE-HL

+12.97 8TH TSP Bobbin 5 68 IDI 88 10.63 P 1 29 TE-HL

+9.98 BTH TSP l

Bobbin 5 94 IDI 97 2.38 P 1 32 TE-HL

+7.79 BTH TSP l

Bobbin 5 95 NOI 2.53 P 1 80 TE-HL

+10.21 BTH TSP Bobbin 6 35 NOI 2.58 P 1 110 TE-HL

+10.28 F/L Bobbin NOI 3.68 P 1 59 TE-HL

+3.02 F/L Bobbin NQI 7.42 P 1 64 TE-HL

+8.66 F/L H/L Tubesheet SAI 1.28 1 37 TTS-HL

-2.71 TTS-KL Bobbin 6 68 IDI 90 11.01 P 1 28 TE-HL

+17.21 F/L H/L Tubesheet MAI 5.68 1 20 TTS-HL

-4.20 TTS-HL i

Bobbin 6 70 IDI 29 12.52 P 1 9 TE-KL

+2.73 F/L i

Bobbin 6 71 IDI 83 5.10 P 1 57 TE-HL

+16.21 F/L H/L Tubesheet MAI 2.15 1 41 TTS-HL

-5.09 TTS-HL i

Bobbin 6 74 IDI 58 9.01 P 1 18 TE-HL

+1.88 F/L Bobbin 6 82 IDI 10 6.15 P 1 3 TE-HL

+14.31 F/L Bobbin 6 85 IDI 96 5.65 P 1 38 TE-HL

+11.29 F/L

+

Bobbin 6 86 NOI 4.54 P 1 139 TE-HL

+2.05 F/L Bobbin 6 94 NQI 3.26 P 1 155 TE-HL

+14.51 F/L H/L Tubesheet 7 33 SAI 0.91 1 22 TTS-HL

-4.48 TTS-KL Bobbin 7 60 NQI 7.45 P 1 149 TE-HL

+10.82 F/L Bobbin NQI 13.06 P 1 166 TE-HL

+9.81 F/L

(

H/L Tubesheet 7 61 SAI 0.90 1 23 TTS-HL

-2.88 TTS-HL Bobbin 7 66 IDI 99 3.51 P 1 35 TE-HL

+7.94 F/L l

Bobbin 7 87 IDI 30 5.52 P 1 110 TE-HL

+9.80 F/L i

Bobbin 8 23 IDI 82 36.65 P 1 32 TE-HL

+3.03

-F/L Bobbin IDI 86 5.24 P1 59 TE-HL

+10.07 F/L Bobbin B 59 IDI 55 1.55 P 1 82 TE-HL

+5.92 F/L Bobbin 8 63 NQI 8.54 P 1 149 TE-HL

+10.29 F/L Bobbin IDI 87 5.27 P 1 58 TE-HL

+15.47 F/L Bobbin 8 74 IDI 74 15.46 P 1 29 TE-HL

+5.86 F/L H/L Tubesheet 8 75 SAI 1.30 1 24 TTS-HL

-3.42 TTS-HL Bobbin 8 B3 IDI 92 6.35 P 1 36 TE-HL

+13.40 F/L H/L Tubesheet MAI 0.97 1 33 TTS-HL

-3.97 TTS-HL Bobbin 8 102 IDI 80 4.02 P 1 60 TE-KL

+16.80 F/L H/L Tubesheet SAI 5.39 1 27 TTS-HL

-4.89 TTS-HL Bobbin 9

5 IDI 88 15.42 P 1 52 TE-HL

+15.15 F/L

-~

t*

BWNT TUBAN II (Version 2.1) 09/21/1994 14:52:46 McGuire Nuclear Station - Unit One s/c p 08/94 RFO Bobbin,H/L Tubesheet Page 2 of 5 ATTACHMENT #4 - F*

F* QUERY TEST TYPE ROW COL IND %TW VOLTS CHN DEG LOCATION EXTENT 1 Bobbin 9 15 IDI 87 6.56 P 1 27 TE-CL

+15.41 F/L H/L Tubesheet 9 18 SAI 0.92 1 13 TTS-HL

-3.97 TTS-HL Bobbin 9 24 NOI 3.39 P 1 93 TE-HL

+16.18 F/L Bobbiu 9 70 IDI 87 5.65 P 1 34 TE-HL

+9.87 F/L Bobbin 9 81 IDI 73 10.02 P 1 76 TE-HL

+7.00 F/L Bobbin IDI 84 6.28 P 1 63 TE-HL

+16.14 F/L Bobbin 9 85 IDI 59 12.72 P 1 23 TE-HL

+10.61 F/L Bobbin 9 98 NQI 3.55 P 1 85 TE-HL

+15.16 F/L Bobbin 10 85 IDI 79 21.43 P 1 31 TE-HL

+11.75 F/L Bobbin 10 87 IDI 82 5.35 P 1 65 7E-HL

+14.85 F/L Bobbin 11 2 IDI 93 2.77 P 1 40 TE-HL

+12.73 F/L Bobbin 11 13 IDI 79 14.56 P 1 23 TE-CL

+17.11 F/L Bobbin 11 17 IDI 38 17.30 P 1 11 TE-HL

+11.04 F/L Bobbin 11 72 IDI 78 16.12 P 1 61 TE-HL

+13.45 F/L Bobbin 11 84 IDI 76 17.08 P 1 64 TE-HL

+13.44 F/L Bobbin IDI 85 7.91 P 1 52 TE-HL

+5.64 F/L Bobbin IDI 89 24.14 P 1 47 TE-HL

+10.50 F/L Bobbin 11 85 IDI 93 17.64 P1 28 TE-HL

+9.61 F/L Bobbin 11 89 IDI 100 3.81 P 1 30 TE-HL

+13.84 F/L Bobbin 11 96 IDI 93 9.19 P 1 41 TE-HL

+16.91 F/L H/L Tubesheet MAI 6.52 1 30 TTS-HL

-4.08 TTS-HL Bobbin 11 103 IDI 70 3.57 P 1 71 TE-HL

+14.33 F/L Bobbin 12 30 IDI 60 2.61 P 1 82 TE-HL

+16.60 F/L H/L Tubesheet MAI 2.38 1 29 TTS-HL

-2.86 TTS-HL Bobbin 13 11 IDI 55 14.66 P 1 16 TE-HL

+11.76 F/L Bobbin IDI 86 14.65 P 1 51 TE-HL

+13.08 F/L Bobbin 13 27 IDI 91 17.57 P 1 43 TE-HL

+15.94 F/L Bobbin 13 64 IDI 68 3.72 P 1 23 TE-HL

+11.57 F/L Bobbin 13 65 IDI 76 14.25 P 1 26 TE-HL

+8.20 F/L Bobbin 13 66 IDI 35 17.59 P 1 12 TE-HL

+13.31 F/L Bobbin 13 67 IDI 53 20.51 P 1 18 TE-HL

+4.68 F/L Bobbin 13 72 IDI 58 4.19 P 1 89 TE-HL

+12.31 F/L Bobbin 13 83 IDI 96 14.32 P 1 42 TE-HL

+10.02 F/L H/L Tubesheet 13 87 MAI 0.96 1 17 TTS-HL

-4.52 TTS-HL Bobbin 13 89 IDI 95 4.78 P 1 44 TE-HL

+15.28 F/L H/L Tubesheet 13 98 MAI 0.72 1 23 TTS-HL

-4.36 TTS-HL Bobbin 14 38 IDI 1

4.39 P 1 141 TE-HL

+13.68 F/L Bobbin 14 48 IDI 44 5.93 P 1 110 TE-HL

+6.22 F/L Bobbin 14 65 NOI 5.05 P 1 76 TE-HL

+6.58 F/L Bobbin 14 72 IDI 62 13.54 P 1 16 TE-HL

+14.27 F/L H/L Tubesheet 14 91 MAI 0.91 1 28 TTS-HL

-5.00 TTS-HL Bobbin 14 94 IDI 43 10.80 P 1 10 TE-HL

+14.51 F/L Bobbin 15 38 IDI 94 43.70 P 1 49 TE-HL

+15.89 F/L Bobbin 15 59 IDI 94 57.96 P 1 37 TE-HL

+15.44 F/L Bobbin 15 61 IDI 1

2.89 P 1 138 TE-HL

+3.19 F/L Bobbin IDI 2

3.29 P 1 127 TE-HL

+7.95 F/L Bobbin IDI 56 3.57 P 1 84 TE-HL

+11.76 F/L Bobbin 15 64 IDI 25 2.16 P 1 111 TE-HL

+17.08 F/L H/L Tubesheet MAI 2.96 1 34 TTS-HL

-3.60 TTS-HL Bobbin 15 85 IDI 61 8.75 P 1 17 TE-HL

+11.71 F/L Bobbin 16 11 IDI 91 56.53 P 1 54 TE-HL

+14.62 F/L Bobbin 16 13 IDI 91 38.90 P 1 54 TE-HL

+12.71 F/L Bobbin 16 17 IDI 75 17.83 P 1 72 TE-HL

+10.42 F/L tobbin 16 21 IDI 97 26.77 P 1 44 TE-HL

+18.71 F/L H/L Tubesheet MAI 12.08 1 29 TTS-HL

-4.24 TTS-HL Bobbin 16 41 IDI 86 5.54 P 1 61 TE-HL

+13.96 F/L Bobbin 16 47 IDI 90 4.53 P 1 55 TE-HL

+7.36 F/L Bobbin 16 97 IDI 57 4.09 P 1 20 TE-HL

+9.53 F/L Bobbin IDI 60 2.32 P 1 21 TE-HL

+10.54 F/L Bobbin 17 12 IDI 92 3.80 P 1 47 TE-HL

+17.70 F/L H/L Tubesheet MAI 2.36 1 19 TTS-HL

-3.86 TTS-HL Bobbin 17 15 IDI 90 19.93 P 1 49 TE-HL

+15.73 F/L Bobbin 17 24 IDI 86 4.88 P 1 56 TE-HL

+13.90 F/L Bobbin IDI 88 6.84 P 1 30 TE-HL

+13.52 F/L H/L Tubesheet 17 67 MAI 0.70 1 18 TTS-HL

-2.70 TTS-HL

_ = _ _

BWNT TUBAN II (Version 2.1) 09/21/1994 14:52:46 McGuire Nuclear Station - Unit One S/G D e***************

08/94 RFO Bobbin,H/L Tubesheet Page 3 of 5 ATTACHMENT #4 - F*

F* QUERY TEST TYPE ROW COL IND %TW VOLTS CHN DEG LOCATION EXTENT 1 H/L Tubesheet 17 81 SAI 2.04 1 23 TTS-HL

-3.53 TTS-HL Bobbin 17 85 IDI 32 9.89 P 1 9 TE-HL

+15.31 F/L Bobbin IDI 95 3.11 P 1 36 TE-HL

+15.53 F/L Bobbin 17 90 IDI 77 4.64 P1 61 TE-HL

+15.39 F/L Bobbin 17 94 IDI 57 12.22 P 1 16 TE-HL

+11.48 F/L Bobbin 18 4 IDI 98 6.81 P 1 37 TE-HL

+10.35 F/L Bobbin 18 16 IDI 94 17.76 P 1 44 TE-HL

+14.82 F/L Bobbin 18 32 NOI 6.40 P 1 154 TE-HL

+6.37 F/L Bobbin 18 34 IDI 88 18.46 P 1 53 TE-HL

+12.46 F/L Bobbin 18 59 IDI 2

10.54 P 1 132 TE-HL

+7.06 F/L Bobbin 18 60 IDI 90 10.03 P 1 46 TE-HL

+10.80 F/L Bobbin 18 80 IDI 13 17.49 P 1 4 TE-HL

+11.81 F/L Bobbin 18 89 IDI 80 4.27 P 1 60 TE-HL

+12.52 F/L Bobbin 10 96 NQI 7.32 P 1 185 TE-HL

+17.12 F/L Bobbin IDI 47 2.54 P1 14 TE-HL

+12.38 F/L Bobbin IDI 73 2.11 P 1 22 TE-HL

+9.52 F/L Bobbin IDI 95 6.51 P 1 39 TE-HL

+14.28 F/L Bobbin 19 5 NQI 4.26 P 1 166 TE-HL

+10.82 F/L Bobbin 19 22 IDI 47 3.15 P 1 99 TE-HL

+16.84 F/L H/L Tubesheet MAI 3.69 1 18 TTS-HL

-3.69 TTS-HL Bobbin 19 23 IDI 57 9.17 P 1 20 TE-HL

+10.35 F/L Bobbin 19 52 IDI 9

3.27 P 1 133 TE-HL

+9.40 F/L Bobbin 19 87 IDI 16 4.48 P 1 129 TE-HL

+12.71 F/L Bobbin 20 24 IDI 83 6.36 P 1 29 TE-HL

+8.48 F/L Bobbin 20 38 IDI B5 9.38 P 1 58 TE-HL

+10.55 F/L Bobbin 20 86 IDI 84 7.19 P 1 32 TE-HL

+1.98 F/L Bobbin 20 90 IDI 96 8.90 P 1 46 TE-HL

+14.44 F/L Bobbin 20 92 IDI 98 11.65 P 1 42 TE-HL

+11.52 F/L Bobbin 21 5 IDI 89 18.47 P1 31 TE-HL

+0.70 F/L Bobbin 21 34 IDI 85 16.58 P 1 57 TE-HL

+3.08 F/L Bobbin 21 43 IDI 60 25.51 P 1 21 TE-HL

+9.23 F/L Bobbin 22 10 IDI 95 32.34 P 1 44 TE-HL

+16.63 F/L H/L Tubesheet MAI 14.72 1 28 TTS-HL

-4.26 TTS-HL Bobbin 22 13 IDI 80 23.36 P 1 28 TE-HL

+0.74 F/L Bobbin 22 30 IDI 96 5.99 P 1 27 TE-HL

+6.06 F/L 1

Bobbin 22 38 IDI 93 80.58 P 1 39 TE-HL

+17.79 F/L Bobbin 23 11 IDI 78 2.40 P 1 61 TE-HL

+16.56 F/L Bobbin 23 56 IDI 89 3.23 P 1 45 TE-HL

+12.10 F/L Bobbin 23 70 IDI 75 37.20 P 1 30 TE-HL

+7.57 F/L Bobbin IDI 80 7.48 P 1 32 TE-HL

+5.87 F/L Bobbin 23 81 IDI 70 8.89 P 1 28 TE-HL

+11.20 F/L Bobbin 23 83 IDI 58 13.81 P 1 23 TE-HL

+2.80

.F/L Bobbin 23 92 IDI 61 12.92 P 1 17 TE-HL

+7.52 F/L Bobbin 24 12 IDI 85 2.51 P 1 51 TE-CL

+13.35 F/L Bobbin IDI 89 4.29 P 1 46 TE-CL

+16.97 F/L Bobbin 24 19 IDI 85 10.51 P 1 51 TE-HL

+17.59 F/L H/L Tubesheet MAI 6.44 1 33 TTS-HL

-3.41 TTS-HL Bobbin 24 20 IDI 79 4.11 P 1 59 TE-HL

+16.00 F/L Bobbin 24 22 IDI 93 1.38 P 1 26 TE-HL

+15.79 F/L Bobbin 24 23 IDI 69 8.30 P 1 72 TE-HL

+16.77 F/L H/L Tubesheet MAI 7.39 1 24 TTS-HL

-4.27 TTS-HL Bobbin 24 26 IDI 43 18.46 P 1 12 TE-HL

+4.79 F/L Bobbin 25 44 IDI 21 2.46 P 1 129 TE-HL

+7.76 F/L Bobbin 25 54 IDI 60 18.23 P 1 21 TE-HL

+12.08 F/L Bobbin 26 17 IDI 47 21.71 P 1 15 TE-HL

+11.69 F/L Bobbin 26 40 IDI 88 7.84 P1 28 TE-HL

+16.42 F/L Bobbin 26 66 IDI 79 9.29 P 1 22 TE-HL

+10.47 F/L Bobbin 27 17 NQI 2.50 P 1 136 TE-HL

+10.90 F/L Bobbin 27 18 IDI 86 2.78 P 1 48 TE-HL

+16.58 F/L H/L Tubesheet SAI 1.30 1 48 TTS-HL

-4.24 TTS-HL Bobbin 27 30 IDI 32 13.01 P 1 9 TE-HL

+10.59 F/L Bobbin 27 35 IDI 82 1.99 P 1 54 TE-HL

+16.54 F/L Bobbin 27 36 IDI 36 9.44 P1 10 TE-HL

+8.24 F/L Bobbin 27 69 IDI 74 33.83 P 1 25 TE-HL

+3.12 F/L Bobbin 27 82 IDI 71 6.22 P 1 24 TE-HL

,11.37 F/L

j BWNT TUBAN II (Version 2.1) 09/21/1994 14:16:30

  • a*****

McGuire Nuclear Station - Unit One i

S/G A i

08/94 RFO Page 1 ATTACHMENT #5 - TUBES PLUGGED COUNT ROW COL COUNT ROW COL 1.

2 37 47.

21 78 2.

2 64 48.

21 109 3.

4 22 49.

23 61 4.

4 76 50.

23 67 5.

4 78 51.

25 77 6.

4 79 52.

25 85 7.

5 64 53.

28 87 8.

5 90 54.

28 99 9.

5 109 55.

30 84 10.

5 113 56.

31 63 11.

6 60 57.

31 64 12.

7 72 58.

32 60 13.

7 83 59.

32 62 14.

7 91 60.

32 63 15.

7 99 61.

33 82 16.

7 109 62.

34 68 17.

7 112 63.

35 45 18.

8 58 64.

35 64 19.

9 47 65.

36 31 20.

9 56 66.

37 38 21, 9

57 67.

37 60 22.

9 75 68.

38 22 23.

9 79 69.

38 51 24.

10 112 70.

39 53 25.

11 24 71.

39 59 26.

11 39 72.

39 80 27.

11 75 73.

40 67 28.

11 90 74.

45 84 29, 12 66 75.

45 86 30.

12 69 76.

47 63 31.

12 77 77.

47 86 32.

12 87 78.

48 85 33.

13 59 79.

48 86 34.

14 36 35.

14 107 36.

15 44 37.

15 69 38.

16 77 39.

16 95 40.

16 100 41.

18 87 42.

19 107 43.

20 65 44.

20 84 45.

20 88 46.

20 109

s

~

=*****3*

BWHT TUBAN II (Version 2.1) 09/21/1994 14:16:30 io******'

McGuire Nuclear Station - Unit One ce*****

S/G A eco****

08/94 RFO Page 2 ATTACHMENT #5 - TUBES PLUGGED COUNT ROW COL COUNT ROW COL Total Data Items Found = 79 Total Tubes Found = 79

4.

i'*****I BWNT TUBAN II (Version-2.1) 09/22/1994 14:12:26 McGuire Nuclear Station - Unit One i

.j

              • ~

S/G B-08/94 RFO t

Page 1 ATTACHMENT #6 - TUBES PLUGGED COUNT ROW COL COUNT ROW COL I

1.

2 62 47.

14 59 2.

3 12 48.

15 17 i

3.

3 62 49.

16 47 i

4.

3 63 50.

16 57 l

5.

3 65 51.

17 42 6.

3 85 52.

17 71 7.

4 59 53.

18 102 8.

4 83 54.

20 5

9.

4 108 55.

20 11 10.

5 19 56.

20 48 i

11.

5-57 57, 21 7

12.

5 63 58.

21 25 13.

6 25 59.

22 22 i

14.

6 37 60.

22 33 i

15.

6 43 61.

22 67 16.

6 '99 62.

22 75 17.

7 15 63.

23 22

-i 18.

7 22 64.

23 69 19.

7 57 65.

24 41 20.

7 69 66.

24 45 21.

7 106 67.

25 62

'i 22.

8 24 68.

25 74 l

23.

8 28 69.

25 94 I

24.

8 39 70.

26 13 25.

9 18 71.

26-19 26.

9 68 72.

26 47

~i 27.

9 69 73.

26 82 28.

9 70 74.

26 '87 29.

10 66 75.

26 99 30, 10 67 76.

27, 14 l

31.

10 70 77, 27-63

32..

10 87 78.

28 17 i

33.

10 98 79.

29 99 l

34.

11 14 80.

31' 67

.1 96 l

3 35.

11 63 81.

36.

12 6

82.

33 12 l

37.

12 8

83.

33 67 j

38.

12 11 84.

34.102 39.

12 32 85.

35 20

~

40.

12 67 86.

36 79 41.

13 5

87.

37 66

(

42.

13 11 88.

39 60 l

43.

13 19 89.

40 51 l

44.

13 106 90.

40 76-45.

14 8

91.

40 87 i

46, 14 30 92.

41 48 j

~. -,, -.

t.

BWNT TUBAN II (Version 2.1) 09/22/1994 14:12:26 McGuire Nuclear Station - Unit One e******

S/G B 08/94 RFO Page 2 ATTACHMENT #6 - TUBES PLUGGED COUNT ROW COL COUNT ROW COL 93.

41 70 94.

41 91 95.

42 33 96.

42 48 97.

42 56 98.

42 57 99.

42 60 100.

42 67 101.

42 76 102.

43 37 103.

43 74 104.

44 37 105.

44 45 106.

44 91 107.

45 75 108.

48 37 109.

48 76 110.

49 32 111.

49 38 112.

49 56 113.

49 57 Total Data Items Found = 113 Total Tubes Found = 113 1

BWNT TUBAN II (Version 2.1) 09/21/1994 14:34:46 McGuire Nuclear Station - Unit One S/G C 08/94 RFO Page 1 ATTACHMENT #7 - TUBES PLUGGED COUNT ROW COL COUNT ROW COL 1.

2 47 47.

16 62 2.

2 62 48.

16 65 3.

2 64 49.

17 67 4.

2 70 50.

17 69 5.

2 93 51.

18 50 6.

2 104 52.

18 99 7.

3 58 53.

19 33 8.

3 81 54.

20 81 9.

3 95 55.

21 48 10.

4 84 56.

22 55 11.

4 98 57.

22 83 12.

4 111 58.

23 68 13.

5 53 59.

23 83 14.

5 108 60.

23 92 15.

6 64 61.

23 104 16.

6 72 62.

24 9

17.

6 74 63.

25 59 18.

6 76 64.

25 72 19.

6 101 65.

25 74 20.

6 112 66.

28 51 21.

7 38 67.

29 67 22.

7 51 68.

30 72 23.

7 65 69.

30 86 24.

7 96 70.

31 59 25.

8 48 71.

31 86 26.

10 31 72.

31 99 27.

10 76 73.

32 12 28.

10 113 74.

32 54 29.

11 47 75.

32 71 30.

11 56 76.

33 98 31.

11 61 77.

34 93 32.

11 89 78.

35 51 33.

12 60 79.

35 94 34.

12 97 80.

36 33 35.

13 41 81.

36 65 36.

13 56 82.

36 67 37.

13 95 83.

36 68 38.

13 105 84.

37 29 39.

14 59 85.

37 55 40.

14 60 86.

38 79 41.

14 65 87.

39 53 42.

14 77 88.

40 47 43.

15 75 89.

40 96 44.

15 108 90.

41 79 45.

15 109 91.

41 93 46.

16 59 92.

44 75

Y

  • d i' BWNT TUBAN II (Version 2.1) 09/21/1994 14:34:46 McGuire Nuclear Station - Unit One S/G C 08/94 RFO Page 2 ATTACHMENT #7 - TUBES PLUGGED COUNT ROW COL COUNT ROW COL 93.

44 82 94.

46 83 95.

46 84 96.

48 83 97.

49 50 98.

49 51 99.

49 54 100.

49 55 101.

49 72 Total Data Items Found = 101 Total Tubes Found = 101

BWNT TUBAN II (Version 2.1) 09/21/1994 14:40:53 McGuire Nuclear Station - Unit One S/G D 08/94 RFO Page 1 ATTACHMENT #8 - TUBES PLUGGED j

COUNT ROW COL COUNT ROW COL 1.

2 18 47.

14 81 2.

2 56 48.

15 39 3.

3 38 49.

16 14 4.

4 23 50.

16 19 5.

4 34 51.

16 34 6.

4 49 52.

16 67 7.

4 87 53.

16 80 8.

4 92 54.

16 99 9.

4 98 55.

17 57 10.

5 27 56.

17 62

'll.

5 29 57.

17 88 12.

5 46 58.

18 11 13.

5 66 59.

18 33 14.

5 83 60.

18 79 15.

5 87 61.

19 62 16.

6 9

62.

20 82 17.

6 22 63.

20 83 18.

7 24 64.

20 97 19.

7 38 65.

21 14 20.

7 80 66.

21 15 21.

7 84 67.

21 61 22.

8 4

68.

21 75 23.

8 31 69.

22 6

24.

8 66 70.

22 83 25.

8 67 71.

23 6

26, 8

69 72.

23 21 27.

8 89 73.

23 48 28.

8 98 74.

25 106 29.

9 12 75.

27 29 30.

9 16 76.

27 37 31.

9 76 77.

27 48 32.

10 79 78.

27 78 33, 10 113 79.

27 95 34.

11 5

80.

28 9

35.

11 62 81.

28 47 36.

11 78 82, 29 88 37.

12 49 83.

31 32 38.

12 61 84.

31 34 39.

12 65 85.

32 38 40.

12 80 86.

32 44 41.

13 78 87.

32 55 42.

13 80 88.

33 58 43.

14 16 89.

34 29 44.

14 53 90.

35 57 45.

14 76 91.

35 63 46.

14 80 92.

36 36

BWNT TUBAN II (Version 2.1) 09/21/1994 14:40:53 McGuire Nuclear Station - Unit One ocoooc*

S/G D 000****

08/94 RFO Page 2 ATTACHMENT #8 - TUBES PLUGGED COUNT ROW COL COUNT ROW COL 93.

36 38 94.

36 72 95.

37 30 96.

37 60 97.

37 67 98.

37 81 99.

38 46 100.

38 65 101.

38 82 102.

39 18 103.

39 19 104.

39 33 105.

39 35 106.

39 39 107.

39 43

108, 39 45 109.

39 46 110.

39 57 111.

39 70 112.

40 53 113.

40 70 114.

41 51 115.

42 47 116.

42 54 117.

42 81 118.

43 34 119.

43 39 120.

43 55 121.

45 84 122.

46 40 123.

46 77 124.

47 32

125, 49 44 126.

49 69 127.

49 70 I

128.

49 83 Total Data Items Found = 128 Total Tubes Found = 128

, =.

9 BWNT TUBAN II (Version 2.1) 09/21/1994 15:45:25 McGuire Nuclear Station - Unit One S/G A 08/94 RFO Bobbin,C/L Special Interest,H/L Special Interest,H/L Tubesheet,U-Bend Page 1 of 10 ATTACHMENT #9 - INDICATIONS OF IMPERFECTIONS INDICATIONS OF IMPERFECTIONS TEST TYPE ROW COL IND iTW VOLTS CHN DEG LOCATION EXTENT 1 Bobbin 2

3 NOI 0.88 3 104 8TH TSP

-1.30 8TH TSP Bobbin NOI 1.09 3 124 BTH TSP

-0.48 BTH TSP r

Bobbin NOI 1.73 3 80 BTH TSP

+0.51 8TH TSP Bobbin 2

8 NQI 0.51 3 124 9TH TSP

+36.04 8TH TSP Bobbin ODI 2

0.75 3 143 15TH TSP

+15.92 8TH TSP Bobbin ODI 9

0.43 3 138 15TH TSP

+18.93 BTH TSP C/L Special I VOL 0.58 1 146 8TH TSP

-9.76 BTH TSP C/L Special I VOL 0.64 1 105 15TH TSP

+15.92 13TH TSP C/L Special I VOL 0.79 1 98 15TH TSP

+11.37 13TH TSP Bobbin 2 17 NQI 0.68 3 97 3RD TSP

+20.24 BTH TSP Bobbin NQI 0.55 3 145 20TH TSP

+1.67 9TH TSP H/L Special I VOL 0.92 1 133 3RD TSP

+20.35 4TH TSP C/L Special I VOL 0.89 1 168 20TH TSP

+1.67 20TH TSP Bobbin 2 36 ODI 34 1.21 3 115 2ND TSP

+39.15 BTH TSP H/L Special I VOL 1.30 1 121 2ND TSP

+39.15 3RD TSP U-Bend 2 37 VOL 0.80 1 91 7TH TSP

+3.78 8TH TSP H/L Tubesheet 2 64 MAI 0.82 1 8 TTS-HL

+0.00 TTS-HL Bobbin 2 66 ODI 24 0.88 3 127 8TH TSP

-1.19 BTH TSP i

Bobbin 2 100 NOI 0.92 3 107 9TH TSP

+42.23 BTH TSP Bobbin 2 102 ODI 11 1.95 P 1 142 IST TSP

+0.00 8TH TSP Bobbin 3 91 ODI 13 0.52 3 135 3RD TSP

+9.77 8TH TSP Bobbin 4 22 NQI 4.36 3 13 16TH TSP

+8.00 BTH TSP C/L Special I NOI 3.66 1 9 16TH TSP

+0.65 15TH TSP Bobbin 4 23 NOI 0.80 P 1 43 IST TSP

+0.03 8TH TSP Bobbin 4 42 ODI 15 0.61 3 143 2ND TSP

+2.25 8TH TSP H/L Special I VOL 0.50 1 134 2ND TSP

+2.25 3RD TSP H/L Tubesheet.

4 76 IDI 57 2.81 P 1 100 TE-HL

+10.79 BTH TSP Bobbin SAI 1.24 1 23 TTS-HL

+0.03 TTS-HL Bobbin 4 78 NOI 0.44 P1 82 4TH TSP

-0.07 8TH TSP Bobbin IDI 89 23.60 P 1 55 TE-HL

+12.79 8TH TSP H/L Special I SAI 0.51 1 36 4TH TSP

+0.02 4TH TSP H/L Tubesheet 4 79 SAI 1.31 1 21 TTS-HL

-0.14 TTS-HL Bobbin 4 93 IDI 77 9.44 P1 78 TE-HL

+11.86 8TH TSP Bobbin IDI 94 24.23 P 1 54 TE-HL

+16.84 BTH TSP Bobbin 4 109 NOI 0.49 P 1 41 3RD TSP

-0.03 8TH TSP Bobbin 5 25 ODI 24 0.64 3 129 3RD TSP

+33.66 STH TSP Bobbin 5 28 ODI 13 2.37 P 2 0 17TH TSP

+0.38 BTH TSP Bobbin 5 30 ODI 21 0.25 P 1 140 2ND TSP

-0.05 BTH TSP Bobbin 5 62 IDI 84 6.04 P 1 74 TE-HL

+15.72 BTH TSP H/L Tubesheet 5 64 SAI 1.06 1 21 TTS-HL

-0.21 TTS-HL H/L Tubesheet 5 90 SAI 0.78 1 15 TTS-HL

-0.01 TTS-HL Bobbin 5 99 NOI 0.31 3 80 BTH TSP

+6.20 8TH TSP Bobbin 5 108 IDI 84 4.20 P 1 79 TE-HL

+15.72 BTH TSP H/L Tubesheet 5 109 SAI 0.55 1 49 TTS-HL

-0.14 TTS-HL H/L Tubesheet 5 113 SAI 1.11 1 11 TTS-HL

-0.11 TTS-HL Bobbin 6 56 ODI 15 0.67 3 133 4TH TSP

+26.97 F/L H/L Special I VOL 1.13 1 160 4TH TSP

+26.79 4TH TSP Bobbin 6 58 ODI 10 0.69 3 137 6TH TSP

+34.49 F/L H/L Special I VOL 0.29 1 118 7TH TSP

-B.16 7TH TSP Bobbin 6 59 NQI 0.61 3 123 19TH TSP

-0.88 F/L Bobbin IDI 99 2.33 P 1 27 TE-KL

+10.45 F/L Bobbin 6 60 IDI 95 2.96 P 1 35 TE-HL

+16.91 F/L H/L Tubesheet SAI 0.33 1 28 TTS-HL

-0.06 TTS-HL Bobbin 6 69 NOI 0.47 3 34 12TH TSP

+12.90 F/L C/L Special I VOL 0.91 1 106 11TH TSP

-9.28 11TH TSP Bobbin 7 10 NOI 0.70 P 1 47 4TH TSP

+0.12 F/L H/L Tubesheet 7 72 SCI 0.36 1 46 TTS-HL

-0.13 TTS-HL H/L Tubesheet 7 83 SAI 1.23 1 23 TTS-HL

-0.05 TTS-HL H/L'Tubesheet 7 91 SAI 0.72 1 33 TTS-HL

-0.02 TTS-HL H/L Tubesheet 7 99 SAI 0.50 1 38 TTS-HL

-0.08 TTS-HL H/L Tubesheet 7 109 MAI 0.83 1 32 TTS-HL

-0.04 TTS-HL H/L Tubesheet 7 112 SAI 0.80 1 25 TTS-HL

+0.09 TTS-HL Bobbin 8 22 NOI 0.55 3 136 17TH TSP

-1.11 F/L Bobbin 8 39 ODI 11 2.35 4 138 STH TSP

+12.60 F/L H/L Special I VOL 0.65 1 91 STH TSP

+11.24 to

+12.88 STH TSP

4 I

BWNT TUBAN II (Version 2.1) 09/21/1994 15:45:25 McGuire Nuclear Station - Unit One S/G A 08/94 RFO Bobbin,C/L Special Interest,H/L Special Interest,H/L Tubesheet,U-Bend 1

Page 2 of 10

-ATTACHMENT #9 - INDICATIONS OF IMPERFECTIONS INDICATIONS OF IMPERFECTIONS I

T7ST TYPE ROW COL IND %TW VOLTS CHN DEG LOCATION EXTENT 1 1

H/L Tubesheet 8 58 SAI 0.25 1 35 TTS-HL

+0.09 TTS-CL Bobbin 9

4 ADI 4.94 6 83 TTS-CL

+14.86 F/L i

C/L Special I VOL 0.69 1 118 TTS-CL

+15.57 TTS-CL i

Bobbin 9 17 ADI 4.45 6 81 4TH TSP

+37.40 F/L H/L Special I VOL 1.29 1 143 4TH TSP

+34.00 STH TSP H/L Special I VOL 1.84 1 133 4TH TSP

+37.40 STH TSP i

Bobbin 9 24 NQI 0.92 3 142 3RD TSP

+1.29 F/L 5

Bobbin 9 27 NQI 0.85 3 134 IST TSP

+14.89 F/L Bobbin 9 42 ADI 1.00 6 81 20TH TSP

-1.42 F/L i'

Bobbin 9 47 NQI 0.30 P 1 65 2ND TSP

+0.07 F/L H/L Tubesheet MAI 1.30 1 17 TTS-HL

-0.16 TTS-HL H/L Tubesheet 9 56 SAI 0.55 1 19 TTS-HL

-0.04 TTS-HL i

H/L Tubesheet 9 57 SAI 1.10 1 32 TTS-HL

-0.07 TTS-HL Bobbin 9 59 NOI 0.48 3 54 10TH TSP

+23.80 F/L Bobbin NQI 0.33 3 83 10TH TSP

+23.91 7TS-HL C/L Special I VOL 0.33 1 94 10TH TSP

+23.01 LOTH TSP Bobbin 9 63 IDI 52 5.27 P 1 99 TE-HL

+16.83

?/L i

H/L Tubesh2et SAI 0.79 1 28 TTS-HL

-4.08 PTS-HL H/L Tubesheet 9 75 SAI 0.70 1 12 TTS-HL

-0.08 TTS-HL H/L Tubesheet 9 79 SAI 0.93 1 29 TTS-HL

+0.00

'rTS-HL Bobbin 10 3 NOI 0.86 3 139 10TH TSP

+12.46 F/L Bobbin ODI 12 0.60 3 134 10TH TSP

+26.88 F/L Bobbin ODI 25 0.60 3 124 10TH TSP

+31.27 F/L

[

C/L Special I 10 9 VOL 0.39 1 98 20TH TSP

+8.35 20TH TSP Bobbin 10 12 NQI 0.49 3 135 12TH TSP

+18.36 F/L f

Bobbin NQI 0.52 3 86 10TH TSP

+9.49 F/L

[

Bobbin NOI 0.67 3 153 12TH TSP

+17.60 F/L

~

C/L Special I VOL 0.28 1 69 10TH TSP

+10.30 10TH TSP Bobbin 10 14 ODI 11 0.54 3 135 IST TSP

+12.97 F/L Bobbin ODI 22 0.78 3 126 IST TSP

+7.51 F/L

[

Bobbin 10 23 NOI 0.56 3 38 TTS-CL

+3.89 F/L Bobbin 10 25 IDI 93 6.71 P 1 39 TE-HL

+17.03 F/L

[

H/L Tubesheet MAI 1.21 1 25 TTS-HL

-4.28 TTS-HL Bobbin 10 34 ODI 7

0.87 3 138 IST TSP

+13.89 F/L i

Bobbin 10 36 NQI 0.46 3 111 6TH TSP

+1.59 F/L

{

Bobbin ODI 13 0.92 3 133 TTS-HL

+11.31 F/L Bobbin-10 38 NOI 0.35 3 92 STH TSP

+37.06 F/L Bobbin 10 39 ODI 20 0.63 3 128 3RD TSP

+28.13 F/L

[

Bobbin 10 40 NOI 0.58 3 41 17TH TSP

+3.53 F/L i

Bobbin 10 87 NQI 1.02 3 133 7TH TSP

+25.56 F/L i

H/L Special I 10 88 VOL 1.85 1 143 IST TSP

+20.75 2ND TSP H/L Tubesheet 10 112 SAI 1.35 1 14 TTS-HL

-0.06 TTS-HL H/L Special I 11 24 MAI 0.99 1 29 TTS-HL

-5.69 TTS-HL C/L Special I 11 39 NQI 0.96 1 28 11TH TSP

-3.76 11TH TSP l

Bobbin 11 75 NQI 0.77 3

.43 1AVB

-3.19 F/L j

U-Bend VOL 0.32 1 27 1AVB

-3.17 7TH TSP H/L Tubesheet 11 90 SAI 0.49 1 66 TTS-HL

-0.17 TTS-HL i

Bobbin 11 92 NQI 0.34 3 61 STH TSP

+41.72 F/L Bobbin 11 94 ADI' 3.92 6 71 20TH TSP

+4.02 F/L i

C/L Special I VOL 0.77 1 145 20TH TSP

+3.54 20TH TSP Bobbin 12 5 NOI 0.27 3 104 TTS-HL

+18.80 F/L t

Bobbin 12 20 NQI 0.38 3 108 STH TSP

+8.62 F/L H/L Tubesheet 12 24 MAI 1.09 1 36 TTS-HL

-4.52 TTS-HL i

U-Band 12 66 NQI 0.30 1 45 7TH TSP

+5.90 7TH TSP U-Band 12-69 NQI 0.49 1 42 7TH TSP

+5.76 7TH TSP U-Btnd 12 70 VOL 0.40 1 46 7TH TSP

+5.93 7TH TSP U-BLnd 12 71 VOL 0.52 1 115 7TH TSP

-2.01 7TH TSP Bobbin 12 77 NOI 11.69 3 12 TTS-CL

+0.77 F/L A

Bobbin IDI 50 5.94 P1 16 TE-CL

+18.67 F/L i

H/L Tubesheet 12 87 MAI 0.88 1 34 TTS-HL

+0.17 TTS-HL Bobbin 12 97 NOI 0.21 P 1 82 STH TSP

-0.02 F/L i

H/L Special I VOL 0.37 1 123 STH TSP

+0.00 STH TSP Bobbin 13 46 IDI 61 21.02 P 1 19 TE-HL

+8.96 F/L Bobbin IDI 99 26.85 P 1 32 TE-HL

+13.79 F/L Bobbin 13 48 IDI B6 10.39 P 1 55 TE-HL

+2.38 F/L l

[

t l

a BWNT TUBAN II (Version 2.1) 09/21/1994 15:45:25 McGuire Nuclear Station - Unit One ee******

S/G A 08/94 RFO Bobbin,C/L Special Interest,H/L Special Interest,H/L Tubesheet,U-Bend ATTACHMENT #9 - INDICATIONS OF IMPERFECTIONS INDICATIONS OF IMPERFECTIONS TEST TYPE ROW COL IND %TW VOLTS CHN DEG LOCATION EXTENT 1 H/L Tubesheet 13 50 VOL 0.53 1 137 TTS-HL

-3.02 TTS-HL H/L Tubesheet 13 59 MAI 0.96 1 21 TTS-HL

-0.06 TTS-HL H/L Tubesheet 14 36 SAI 0.65 1 40 TTS-HL

-0.02 TTS-HL Bobbin 14 61 NOI 0.23 3 104 3RD TSP

+30.92 F/L Bobbin 14 63 ODI 22 0.68 3 127 10TH TSP

+29.83 F/L C/L Special I VOL 0.38 1 85 9TH TSP

-13.60 9TH TSP Bobbin 14 68 NOI 0.61 3 94 17TH TSP

+14.03 F/L Bobbin ODI 7

0.94 3 139 2ND TSP

+8.25 F/L H/L Special I VOL 1.29 1 128 2ND TSP

+7.72 2ND TSP C/L Special I VOL 0.33 1 108 16TH TSP

-8.23 16TH TSP Bobbin 14 72 ODI 27 0.36 3 123 13TH TSP

+1.85 F/L Bobbin 14 75 ADI 2.61 6 65 11TH TSP

+41.71 F/L Bobbin 14 84 NOI 0.72 3 119 TTS-CL

+25.32 F/L C/L Special I VOL 1.99 1 153 20TH TSP

-3.39 20TH TSP H/L Tubesheet 14 107 SAI 0.58 1 49 TTS-HL

-0.05 TTS-HL Bobbin 14 110 ODI 5

0.67 3 141 2ND TSP

+30.44 F/L Bobbin 15 28 IDI 66 28.33 P 1 23 TE-HL

+3.93 F/L Bobbin IDI 97 31.68 P 1 34 TE-HL

+8.66 F/L Bobbin 15 32 ADI 4.18 6 66 17TH TSP

+4.72 F/L C/L Special I VOL 0.48 1 128 17TH TSP

+4.85 17TH TSP Bobbin 15 38 ODI 10 0.31 P 1 135 17TH TSP

-0.05 F/L Bobbin 15 44 ODI 28 0.61 P 1 123 2ND TSP

-0.03 F/L H/L Special I SAI 0.72 1 37 2ND TSP

-0.08 2ND TSP Bobbin 15 50 ADI 3.15 6 78 4TH TSP

+19.27 F/L Bobbin ADI 3.84 6 59 IST TSP

+8.69 F/L H/L Special I VOL 0.51 1 80 4TH TSP

+19.27 4TH TSP H/L Special I VOL 0.52 1 141 IST TSP

+8.69 IST TSP Bobbin 15 55 ADI 10.01 6 76 9TH TSP

+33.35 F/L C/L Special I VOL 1.49 1 97 BTH TSP

-10.10 8TH TSP Bobbin 15 56 WAR 14 0.71 P 4 0 4AVB

+0.00 F/L Bobbin 15 63 NOI 1.12 5 73 11TH TSP

+30.76 F/L C/L Special I VOL 0.50 1 100 10TH TSP

-13.10 10TH TSP Bobbin 15 68 IDI 94 18.42 P 1 43 TE-HL

+1.52 F/L Bobbin 15 69 WAR 21

1. 03 P 4 0 1AVB

+0.00 F/L H/L Tubesheet MAI 0.41 1 30 TTS-HL

-0.33 TTS-HL H/L Special I 16 77 NOI 1.21 1 17 IST TSP

-8.96 IST TSP

+

Bobbin 16 84 IDI 58 12.83 P 1 18 TE-HL

+3.73 F/L Bobbin 16 95 NOI 15,83 P 1 163 TE-HL

+10.35 F/L H/L Tubesheet SAI 1.45 1 20 TTS-HL

+0.13 TTS-HL H/L Tubesheet 16 100 SAI 0.94 1 20 TTS-HL

-0.02 TTS-HL Bobbin 16 104 NOI 11.67 P 1 164 TE-HL

+3.45 F/L C/L Special I 16 107 VOL 0.78 1 157 STH TSP

+1.21 9TH TSP l

Bobbin 17 33 NOI 6.11 3 14 1AVB

+6.90 F/L Bobbin 17 82 ADI 5.48 6 86 17TH TSP

+5.69 F/L C/L Special I VOL 1.09 1 107 17TH TSP

+4.90 17TH TSP Bobbin 17 87 ADI 2.16 6 74 11TH TSP

+39.46 F/L Bobbin 17 89 ODI 12 2.38 4 138 10TH TSP

+26.55 F/L i

Bobbin 17 93 NOI 0.37 P 1 153 16TH TSP

+0.00 F/L H/L Tubesheet 18 87 SAI 0.50 1 29 TTS-HL

-0.20 TTS-HL Bobbin 18 92 NQI 7.41 P 1-160 TE-HL

+13.87 F/L L

Cobbin 19 27 WAR 26 1.72 P 4 0 1AVB

+0.00 F/L Bobbin 19 32 ODI 13 1.14 3 134 6TH TSP

+33.67 F/L H/L Special I VOL 1.40 1 139 7TH TSP

-9.97 7TH TSP i

Bobbin 19 48 ADI 2.96 6 80 TTS-CL

+17.57 F/L C/L Special I VOL 0.44 1 126 TTS-CL

+17.57-20TH TSP s

C/L Special I VOL 0.51 1 97 20TH TSP

-13.00 20TH TSP Bobbin 19 85 ODI 28 0.46 3 121 IST TSP

+6.27 F/L H/L Special I VOL 1.35 1 168 IST TSP

+5.40 IST TSP Cobbin 19 105 NQI 6.39 P 1 182 TE-HL

+7.34 F/L Bobbin 20 17 ADI 2.26 6 64 6TH TSP

+36.24 F/L Bobbin 20 37 NQI 0.54 3 125 TTS-CL

+0.58 F/L Bobbin 20 40 NOI 0.44 3 113 4TH TSP

+25.86 F/L H/L Special I VOL 0.23 1 40 STH TSP

-16.64 STH TSP H/L Tubesheet 20 65 SAI 0.50 1 28 TTS-HL

-0.10 TTS-HL Bobbin 20 84 NQI 11.65 P 1 150 TE-HL

+4.44 F/L

I BWNT TUBAN II (Varsion 2.1) 09/21/1994 15:45:25

              • e McGuiro Nuclear Station - Unit One S/G A e***e***

08/94 RFO Bobbin,C/L Special Interest,H/L Special Interest,H/L Tubesheet,U-Bend 1

i 1

Page 4 of 10 ATTACHMENT #9 - INDICATIONS OF IMPERFECTIONS INDICATIONS OF IMPERFECTIONS TEST TYPE ROW COL IND %TW VOLTS CHN DEG LOCATION EXTENT 1 H/L Tubesheet MAI 1.04 1 25 TTS-HL

-3.31 TTS-HL H/L Tubesheet SAI 0.31 1 58 TTS-HL

+0.10 TTS-HL Bobbin 20 86 ODI 10 3.72 P 1 137 TE-HL

+13.09 F/L H/L Tubesheet 20 88 SAI 1.37 1 31 TTS-HL

+0.00 TTS-HL Bobbin 20 91 ADI 3.23 6 73 10TH TSP

+34.73 F/L C/L Special I VOL 1.18 1 152 9TH TSP

-8.72 9TH TSP Bobbin 20 94 ODI 34 0.51 3 118 TTS-CL

+20.52 F/L Bobbin 20 97 ODI 6

0.49 3 139 2ND TSP

+38.77 F/L H/L Special I VOL 0.18 1 107 3RD TSP

-8,53 3RD TSP H/L Special I VOL 0.30 1 102 3RD TSP

-5.23 3RD TSP Bobbin 20 109 ADI 2.79 6 73 6TH TSP

+38.23 F/L H/L Tubesheet SAI 0.85 1 27 TTS-HL

-0.12 TTS-HL H/L Special I VOL 0.36 1 99 7TH TSP

-5.50 7TH TSP Bobbin 21 27 IDI 88 1.81 P 1 49 TE-HL

+10.21 F/L Bobbin 21 54 NQI 0.39 3 104 9TH TSP

+12.67 F/L Bobbin ODI 17 0.33 3 133 9TH TSP

^+19.35 F/L C/L Special I VOL 0.46 1 109 9TH TSP

+17.44 9TH TSP C/L Special I VOL 2.08 1 146 9TH TSP

+14.13 9TH TSP Bobbin 21 78 IDI 61 9.07 P 1 95 TE-HL

+14.02 F/L H/L Special I MAI 7.58 1 29 TTS-HL

-7.18 TTS-HL Bobbin 21 95 ODI 27 0.71 3 120 IST TSP

+12.65 F/L H/L Special I VOL 0.62 1 156 IST TSP

+14.02 IST TSP H/L Tubesheet 21 109 SAI 0.76 1 38 TTS-HL

+0.00 TTS-HL Bobbin 22 29 NOI 0.33 P 1 151 16TH TSP

-0.03 F/L Bobbin 22 33 ODI 24 1.12 3 126 6TH TSP

+6.78 F/L H/L Special I VOL 1.32 1 141 6TH TSP

+6.78 7TH TSP Bobbin 22 86 ODI 14 2.77 4 131 2ND TSP

+29.35 F/L H/L Tubesheet MAI 1.59 1 25 TTS-HL

-3.69 TTS-HL H/L Special I VOL 0.56 1 79 3RD TSP

-15.94 3RD TSP Bobbin 22 92 NOI 0.46 3 99 3RD TSP

+33.96 F/L H/L Special I VOL 1.58 1 164 3RD TSP

+33.96 4TH TSP Bobbin 23 12 ODI 21 0.29 3 129 IST TSP

+2.72 F/L Bobbin 23 16 NOI 0.53 3 83 11TH TSP

+19.15 F/L C/L Special I VOL 0.71 1 109 11TH TSP

+20.60 11TH TSP Bobbin 23 36 ODI 26 0.39 3.

125 16TH TSP

+8.69 F/L C/L Special I VOL 0.74 1 110 16TH TSP

+9.67 16TH TSP Bobbin 23 52 NOI 0.93 3 38 11TH TSP

+12.11 F/L Bobbin 23 61 ADI 4.85 6 61 10TH TSP

+13.69 F/L Bobbin ADI 6.76 6 65 10TH TSP

+26.28 F/L Bobbin ADI 9.65 6 75 10TH TSP

+10.87 F/L C/L Special I VOL 0.76 1 92 10TH TSP

+12.70 10TH TSP C/L Special I VOL 1.17 1 131 10TH TSP

+26.28 10TH TSP C/L Special I VOL 1.54 1 76 10TH TSP

+10.87 10TH TSP Bobbin 23 64 WAR 9

0.41 P 4 0 1AVB

+0.00 F/L H/L Tubesheet 23 67 MAI 1.46 1 21 TTS-HL

-0.07 TTS-HL Bobbin 23 84 ADI 2.77 6 71 16TH TSP

+7.34 F/L Bobbin 23 85 ADI 2.56 6 74 4TH TSP

+32.16 F/L H/L Special I VOL 0.35 1 113 STH TSP

-9.19 STH TSP Bobbin 23 88 NQI 0.79 3 54 IST TSP

+6.86 F/L Bobbin 23 99 ADI 2-.22 6 60 6TH TSP

+35.42 F/L H/L Special I VOL 0.33 1 132 6TH TSP

+35.42 7TH TSP Cobbin 24 37 NOI 2.06 3 10 9TH TSP

+30.96 F/L Bobbin NQI 2.28 3 10 9TH TSP

+24.87 F/L Bobbin NOI 3.21 3 10 9TH TSP

+12.59 F/L Cobbin NOI 4.33 3 13 9TH TSP

+15.48 F/L Cobbin NQI 6.50 3 16 9TH TSP

+17.53 F/L Cobbin NQI 7.39 3 17 9TH TSP

+35.55 F/L Bobbin NQI 7.59 3 16 9TH TSP

+22.58 F/L Cobbin NOI 8.04 3 14 9TH TSP

+26.24 F/L Bobbin NOI 12.91 3 20 9TH TSP

+28.45 F/L Bobbin NOI 13.57 3 18 9TH TSP

+19.97 F/L Bobbin NQI 16.32 3 20 9TH TSP

+32.89 F/L I

Bobbin NQI O.96 3 14 17TH TSP

+3.03 F/L Bobbin NQI 1.20 3 10 10TH TSP

+9.02 F/L Cobbin NQI 1.91 3 10 13TH TSP

+3.32 F/L 1

1

ee******

BWNT TUBAN II (Version 2.1) 09/21/1994 15:45:25 McGuire Nuclear Station - Unit One e*******

S/G A

    • e*ee**.

08/94 RFO Bobbin,C/L Special Interest,H/L Special Interest,H/L Tubesheet,U-Bend ATTACHMENT #9 - INDICATIONS OF IMPERFECTIONS INDICATIONS OF IMPERFECTIONS TEST TYPE ROW COL IND %TW VOLTS CHN DEG LOCATION EXTENT 1 Bobbin NQI 1.92 3 12 17TH TSP

-0.73 F/L Bobbin NQI 2.24 3 12 18TH TSP

+3.52 F/L Bobbin NQI 2.41 3 9 19TH TSP

+5.3?

F/L Bobbin NOI 2.69 3 12 10TH TSP

+ 2 3. 9.' 8 F/L Bobbin NOI 2.82 3 11 10TH TSP

+13. 8'i F/L Bobbin NQI 3.48 3 12 10TH TSP

+15.85 F/L Bobbin NQI 6.22 3 14 10TH TSP

+18.96 F/L Bobbin NQI 7.00 3 14 10TH TSP

+19.13 F/L Bobbin NQI 7.77 3 16 19TH TSP

+6.44 F/L Bobbin NQI 8.42 3 14 10TH TSP

+21.34 F/L Bobbin 24 41 ODI 6

0.57 P 1 144 16TH TSP

+0.07 F/L Bobbin 24 49 NOI 0.19 3 115 TTS-CL

+27.04 F/L Bobbin 25 7 NQI 0.52 3 58 IST TSP

+19,70 F/L Bobbin 25 36 ADI 13.42 6 97 9TH TSP

+21.26 F/L C/L Special I VOL 1.26 1 106 9TH TSP

+22.96 BTH TSP Bobbin 25 60 ADI 2.51 6 77 19TH TSP

+1.79 F/L Bobbin 25 73 NOI 0.43 3 108 IST TSP

+4.97 F/L H/L Special I VOL 0.89 1 99 IST TSP

+3.95 IST TSP H/L Tubesheet 25 77 SAI 1.54 1 6 TTS-HL

-0.14 TTS-HL Bobbin 25 85 IDI 55 7.19 P 1 90 TE-HL

+17.07 F/L H/L Special I SAI 8.50 1 25 TE-HL

+17.07 TTS-HL Bobbin 26 37 ADI 7.46 6 81 9TH TSP

+1.60 F/L C/L Special I VOL 1.01 l' 102 9TH TSP

+2.46 9TH TSP Bobbin 26 46 IDI 57 4.59 P 1 95 TE-HL

+11.16 F/L Bobbin 26 64 IDI 30 5.99 P 1 113 TE-HL

+14.15 F/L Bobbin 26 82 IDI 87 18.04 P1 49 TE-HL

+16.05 F/L Bobbin 26 84 IDI 90 17.93 P 1 43 TE-HL

+14.98 F/L Bobbin IDI 94 46.99 P 1 37 TE-HL

+14.01 F/L Bobbin 27 53 IDI 94 8.32 P 1 44 TE-HL

+4.49 F/L Bobbin 28 43 WAR 5

0.90 P 2 0 2AVB

+0.00 F/L Bobbin 28 81 WAR 10 0.56 P 4 0 3AVB

+0.00 F/L Bobbin WAR 15 0.77 P 4 0 1AVB

+0.00 F/L

[

H/L Tubesheet 28 87 VOL 1.42 1 164 TTS-HL

-0.05 TTS-HL Bobbin 28 94 ADI 4.27 6 75 4TH TSP

+24.74 F/L H/L Special I VOL 0.99 1 142 4TH TSP

+5.70 4TH TSP H/L Special I VOL 1.09 1 111 4TH TSP

+24.74 4TH TSP H/L Tubesheet 28 99 SAI 1.16 1 25 TTS-HL

+0.00 TTS-HL Bobbin 29 52 WAR 4

0.75 P 2 0 2AVB

+0.00 F/L Bobbin 29 65 NOI 3.48 P 1 49 TE-HL

+10.87 F/L Bobbin 29 80 ODI 10 1.02 3 137 2ND TSP

+24.37 F/L Bobbin IDI 79 11.11 P 1 70 TE-HL

+13.13 F/L H/L Special I VOL 0.77 1 125 2ND TSP

+24.10 2ND TSP Bobbin 30 41 WAR 15 0.75 P 4 0 3AVB

+0.00 F/L Bobbin 30 59 WAR 5

0.41 P 4 0 1AVB 40.00 F/L Bobbin 30 72 WAR 25 1.37 P 4 0 3AVB

+0.00 F/L Bobbin 30 73 NQI 2.42 P 1 43 TE-CL

+14.94 F/L H/L Tubesheet 30 84 MAI 0.75 1 23 TTS-HL

-0.16 TTS-HL H/L Special I 30 88 VOL 0.79 1 131 7TH TSP

+1.04 7TH TSP Bobbin 30 97 NQI 0.66 3 45 TTS-HL

+15.08 F/L H/L Special I VOL 0.90 1 112 TTS-HL

+13.49 TTS-HL c

Bobbin 31 41 WAR 29 1.91 P 4 0 2AVB

+0.00 F/L Bobbin 31 44 WAR 30 2,07 P 4 0 3AVB

+0.00 F/L H/L Tubesheet 31 63 SAI 0.47 1 7 TTS-HL

-0.08 TTS-HL H/L Tubesheet 31 64 MAI 0.86 1 1L8 TTS-HL

-0.03 TTS-HL Bobbin 31 87 ODI 16 0.48 3 132 17TH TSP

+3.14 F/L Cobbin 32 19 WAR 20 1.07 P 4 0 2AVB

+0.00 F/L Bobbin WAR 23 1.36 P 4 0 3AVB

+0.00 F/L tobbin 32 48 ODI 15 1.60 3 134 STH TSP

+10.84 F/L H/L-Special I VOL 1.18 1 150 STH TSP

+11.99 STH TSP H/L Tubesheet 32 60 SAI 0.63 1 51 TTS-HL

+0.15 TTS-HL H/L Tubesheet 32 62 SAI 0.92 1 20 TTS-HL

-0.07 TTS-HL H/L Tubesheet 32 63 SCI 2.00 1 31 TTS-HL

+0.04 TTS-HL Bobbin 32 92 ADI 2.93 6 69 2ND TSP

+24.79 F/L

[

Bobbin 33 27 NQI 0.56 3 110 9TH TSP

+35.06 F/L Bobbin NQI 0.39 3 63 19TH TSP

+3.11 F/L

l BWHT TUBAN II (Version 2.1) 09/21/1994 15:45:25 McGuire Nuclear Station - Unit One S/G A 08/94 RFO Bobbin,C/L Special Interest,H/L Special Interest,H/L Tubesheet,U-Bend Page G of 10 ATTACHMENT #9 - INDICATIONS OF IMPERFECTIONS INDICATIONS OF IMPERFECTIONS l

TEST TYPE ROW COL IND tTW VOLTS CHN DEG LOCATION EXTENT 1 C/L Special I VOL 1.00 1 146 BTH TSP

-8.80 BTH TSP C/L Special I VOL 0.37 1 102 19TH TSP

+3.33 19TH TSP H/L Tubesheet 33 82 SAI 0.67 1 12 TTS-HL

-0.11 TTS-HL Bobbin 34 48 WAR 13 0.69 P 4 0 3AVB

+0.00 F/L Bobbin 34 53 WAR 19 1.10 P 4 0 1AVB

+0.00 F/L U-Brnd 34 55 VOL 1.70 1 157 7TH TSP

+18.14 7TH TSP l

Bobbin 34 56 WAR 18 1.05 P 4 0 1AVB

+0.00 F/L

)

Bobbin 34 68 IDI 63 24.41 P 1 92 TE-HL

+18.65 F/L j

H/L Tubesheet MAI 8.17 1 42 TTS-HL

-4.53 TTS-HL j

H/L Special I MAI 5.82 1 19 TE-HL

+16.97 TTS-HL l

Bobbin 34 81 ODI 6

0.91 4 139 9TH TSP

+19.43 F/L l

Bobbin 34 95 NQI 0.44 3 35 9TH TSP

+16.54 F/L Bobbin ODI 6

1.41 3 139 17TH TSP

+15.07 F/L C/L Special I VOL 0.65 1 97 9TH TSP

+16.35 9TH TSP C/L Special I VOL 0.80 1 67 17TH TSP

+14.86 17TH TSP Bobbin 35 15 WAR 12 0.63 P 4 0 1AVB

+0.00 F/L U-Brnd 35 18 VOL 1.30 1 28 7TH TSP

+2.41 7TH TSP U-Brnd 35 19 VOL 0.60 1 141 BTH TSP

+1.59 BTH TSP Bobbin 35 20 ADI 2.35 6 62 20TH TSP

+2.73 F/L U-Brnd VOL 1.10 1 42 7TH TSP

+1.58 7TH TSP U-B:nd 35 24 VOL 0.73 1 15 7TH TSP

+1.66 7TH TSP Bobbin 35 41 ODI 14 0.62 3 133 6TH TSP

+20.45 F/L H/L Special I VOL 0.38 1 93 6TH TSP

+21.10 6TF TSP Bobbin 35 42 NQI 5.40 P 1 12 TE-HL

+6.43 F/L H/L Tubesheet 35 45 SAI 0.43 1 42 TTS-HL

-0.09 TTS-HL Bobbin 35 64 NOI 2.25 3 163 8TH TSP

+1.09 F/L U-Bend NQI 0.46 1 47 BTH TSP

+1.50 BTH TSP Bobbin 35 99 NQI 0.50 3 59 20TH TSP

+6.24 F/L l

Bobbin 36 25 ODI 6

1.05 3 139 17TH TSP

+5.12 F/L C/L Special I VOL 0.47 1 110 17TH TSP

+5.15 17TH TSP Bobbin 36 31 ODI 40 0.75 3 112 11TH TSP

-1.41 F/L C/L Special I VOL 0.85 1 22 11TH TSP

-1.33 11TH TSP Bobbin 36 34 ODI 1

1.43 3 142 2ND TSP

+39.07 F/L Bobbin ODI 23 2.11 4 126 3RD TSP

+11.32 F/L H/L Special I VOL 0.93 1 105 3RD TSP

+11.56 4TH TSP H/L Special I VOL 1.84 1 140 3RD TSP

-4.48 3RD TSP H/L Tubesheet 36 36 VOL 0.61 1 103 TTS-HL

-3.86 TTS-HL Bobbin 36 70 ADI 2.19 6 56 IST TSP

+20.80 F/L Bobbin ODI 3

1.05 3 144 TTS-HL

+10.33 F/L Bobbin 36 76 NQI 0.42 3 111 TTS-CL

+17.93 F/L Bobbin 36 80 ADI 2.98 6 78 6TH TSP

+8.95 F/L H/L Special I VOL 0.31 1 76 6TH TSP

+0.19 6TH TSP Bobbin 36 87 ODI 15 1.44 3 135 4TH TSP

+38.33 F/L H/L Special I VOL 1.61 1 118 4TH TSP

+39.00 STH TSP Bobbin 36 89 NOI 1.00 3 120 TTS-HL

+2.12 F/L H/L Special I VOL 0.63 1 100 TTS-HL

+1.90 TTS-HL l

Bobbin 36 95 NQI 0.49 3 27 19TH TSP

+4.72 F/L Bobbin 36 98 ODI 12 1.21 3 137 TTS-CL

+10.15 F/L 4

C/L Special I VOL 0.49 1 111 TTS-CL

+11.35 TTS-CL Bobbin 37 16 WAR 13 0.75 P 4 0 4AVB

+0.00 F/L Bobbin WAR 24 1.52 P 4 0 3AVB

+0.00 F/L Bobbin WAR 27 1.89 P 4 0 2AVB

+0.00 F/L Bobbin 37 24 WAR 20 1.18 P 4 0 3AVB

+0.00 F/L Bobbin 37 29 NOI 20.30 P 1 176 TE-HL

+9.38 F/L Bobbin 37 31 ODI 6

0.32 P 1 137 17TH TSP

+0.00 F/L U-Bind 37 36 VOL 0.75 1 30 7TH TSP

+9.63 7TH TSP H/L Tubesheet 37 38 VOL 0.42 1 122 TTS-HL

-0.11 TTS-HL i

H/L Special I 37 60 SAI 0.29 1 52 IST TSP

-0.02 IST TSP Bobbin 37 78 IDI 41 10.09 P 1 12 TE-HL

+13.26 F/L Bobbin 37 81 ADI 3.21 6 112 TTS-HL

+9.20 F/L Bobbin ADI 5.74 6 90 TTS-HL

+12.93 F/L H/L Special I VOL 0.72 1 93 TTS-HL

+8.55 TTS-HL H/L Special I VOL 1.30 1 109 TTS-HL

+11.75 TTS-HL Bobbin 37 94 NOI 0.74 3 36 12TH TSP

+17.93 F/L H/L Special I 38 12 SAI 0.50 1 92 IST TSP

+0.00 IST TSP

)

BWWT TUBAN II (Version 2.1) 09/21/1994 15:45:25 l

McGuire Nuclear Station - Unit One S/G A 08/94 RFO Bobbin,C/L Special Interest,H/L Special Interest,H/L Tubesheet,U-Bend Page 7 of 10 ATTACHMENT #9 - INDICATIONS OF IMPERFECTIONS INDICATIONS OF IMPERFECTIONS TEST TYPE ROW COL IND %TW VOLTS CHN DEG LOCATION EXTENT 1 Bobbin 38 40 ADI 2.41 6 63 10TH TSP

+17.43 F/L Bobbin ADI 2.60 6 69 10TH TSP

+13.84 F/L Bobbin ADI 2.81 6 57 10TH TSP

+10.36 F/L C/L Special I VOL 0.27 1 111 10TH TSP

+17.02 10TH TSP C/L Special I VOL 0.31 1 123 10TH TSP

+10.56 10TH TSP C/L Special I VOL 0.35 1 115 10TH TSP

+13.36 10TH TSP C/L Special I VOL 0.40 1 132 10TH TSP

+14.87 10TH TSP Bobbin 38 47 WAR 23 1.03 P 4 G 2AVB

+0.00 F/L Bobbin WAR 23 1.09 P 4 0 1AVB

+0.00 F/L Bobbin 38 51 NQI 1.10 3 150 8TH TSP

+1.23 F/L U-Bcnd VOL 0.32 1 40 BTH TSP

+1.19 8TH TSP Bobbin WAR 21 0.90 P 4 0 1AVB

+0.00 F/L Bobbin 38 61 NOI 5.34 3 12 15TH TSP

-1.06 F/L Bobbin 38 82 WAR 9

0.42 P 4 0 1AVB

+0.00 F/L Bobbin 38 83 NQI 0.29 3 141 6TH TSP

+9.92 F/L H/L Special I VOL 0.50 1 104 6TH TSP

+9.04 6TH TSP Bobbin 38 97 NOI 0.52 3 120 3RD TSP

+36.20 F/L H/L Special I VOL 1.05 1 133 3RD TSP

+36.48 4TH TSP Bobbin 39 34 NQI 0.42 3 137 TTS-CL

+1.33 F/L Bobbin 39 53 ODI 49 0.48 3 104 STH TSP

+31.58 F/L H/L Special I VOL 0.22 1 72 GTH TSP

-13.27 6TH TSP U-Btnd 39 59 NOI 2.03 1 21 2AVB

+7.21 2AVB Bobbin 39 75 ADI 0.91 6 73 13TH TSP

+8.18 F/L Bobbin NQI 0.36 3 111 14TH TSP

+5.57 F/L H/L Tubesheet 39 80 MAI 0.91 1 23 TTS-HL

+0.00 TTS-HL Bobbin 39 87 NOI 0.52 3 93 16TH TSP

+6.31 F/L Bobbin NQI 0.85 3 71 15TH TSP

+0.00 F/L Bobbin 39 91 NQI 0.71 3 130 17TH TSP

+16.88 F/L C/L Special I VOL 0.46 1 138 16TH TSP

-6.16 16TH TSP Bobbin 39 94 NOI 0.65 3 131 STH TSP

+27.03 F/L Bobbin NOI 0.63 3 125 10TH TSP

+40.10 F/L C/L Special I VOL 0.48 1 43 9TH TSP

+27.04 9TH TSP C/L Special I VOL 0.50 1 108 9TH TSP

+9.29 9TH TSP C/L Special I VOL 1.09 1 144 9TH TSP

-3.99 9TH TSP Bobbin 40 23 NOI 0.46 3 90 6TH TSP

+13.00 F/L H/L Special I VOL 1.04 1 127 6TH TSP

+13.40 6TH TSP Bobbin 40 27 WAR 16 0.87 P 4 0 1AVB

+0.00 F/L Bobbin 40 50 NQI 0.41 3 23 12TH TSP

+10.40 F/L C/L Special I VOL 0.80 1 103 12TH TSP

+10.40 12TH TSP Bobbin 40 51 WAR 30 2.24 P 4 0 1AVB

+0.00 F/L Bobbin 40 67 ODI 29 0.37 3 122 11TH TSP

+6.67 F/L C/L Special I VOL 0.38 1 125 11TH TSP

+7.50 11TH TSP Bobbin 40 69 ADI 3.01 6 33 STH TSP

+40.50 F/L Bobbin 40 72 ADI 2.81 6 50 4TH TSP

+32.54 F/L H/L Special I VOL 0.51 1 96 STH TSP

-9.75 STH TSP Bobbin 40 76 ADI 2.27 6 65 10TH TSP

+21.43 F/L C/L Special I VOL 1.81 1 166 10TH TSP

+23.36 10TH TSP Bobbin 40 79 ODI 12 0.97 4 144 GTH TSP

+34.02 F/L H/L Special I VOL 0.76 1 153 7TH TSP

-8.81 7TH TSP Bobbin 40 80 ADI 2.42 6 77 STH TSP

+20.38 F/L Bobbin WAR 12 0.55 P 4 0 2AVB

+0.00 F/L H/L Special I VOL 0.41 1 117 STH TSP

+19.06 STH TSP Bobbin 40 84 ADI 5.92 6 32 1AVB

+11.32 F/L U-Bind VOL 0.69 1 127 2AVB

+1.86 7TH TSP U-B:nd VOL 0.93 1 121 1AVB

+11.32 7TH TSP Bobbin 40 86 NOI 0.42 3 116 14TH TSP

+3.33 F/L Bobbin WAR 12 0.55 P 4 0 1AVB

+0.00 F/L Bobbin WAR 23 1.34 P4 0 3AVB

+0.00 F/L Bobbin WAR 25 1.49 P 4 0 2AVB

+0.00 F/L Bobbin 40 87 ADI 5.12 6 52 TTS-CL

+7.49 F/L Bobbin ADI 3.50 6 39 2ND TSP

+37.92 F/L Bobbin ADI 4.32 6 50 3RD TSP

+10.18 F/L Bobbin NOI 0.62 3 47 3RD TSP

+13.47 F/L Bobbin NQI 0.47 3 111 12TH TSP

+5.33 F/L Bobbin NOI 0.60 3 46 16TH TSP

+6.71 F/L 1

BWNT TUBAN II (Version 2.1) 09/21/1994 15:45:25 i

L********

McGuire Nuclear Station - Unit One

)

S/G A l

08/94 RFO Bobbin,C/L Special Interest,H/L Special Interest,H/L Tubesheet,U-Bend 1

ATTACHMENT #9 - INDICATIONS OF IMPERFECTIONS INDICATIONS OF IMPERFECTIONS TEST TYPE ROW COL IND %TW VOLTS CHN DEG LOCATION EXTENT 1 Bobbin NOI 0.61 3 63 16TH TSP

+6.40 F/L H/L Special I VOL 0.47 1 93 3RD TSP

+12.61 3RD TSP H/L Special I VOL 0.67 1 59 3RD TSP

+9.88 3RD TSP i

C/L Special I VOL 0.67 1 73 TTS-CL

+6.24 to

+8.30 TTS-CL Bobbin 41 22 WAR 13 0.65 P 4 0 1AVB

+0.00 F/L Bobbin 41 43 NQI 0.52 3 45 TTS-CL

+17.29 F/L Bobbin 41 44 WAR 22 1.36 P 4 0 2AVB

+0.00 F/L Bobbin 41 51 NOI 0.62 3 27 1AVB

+16.63 F/L Bobbin 41 54 WAR 13 0.64 P4 0 1AVB

+0.00 F/L Bobbin WAR 27 1.81 P 4 0 2AVB

+0.00 F/L r

Bobbin 41 56 NOI 1.77 3 16 4AVB

-9.82 F/L U-B nd VOL 5.41 1 12 4AVB

-9.18 BTH TSP Bobbin 41 59 WAR 17 0.79 P 4 0 2AVB

+0.00 F/L Bobbin WAR 34 2.36 P 4 0 1AVB

+0.00 F/L Bobbin 41 61 WAR 15 0.65 P 4 0 1AVB

+0.00 F/L Bobbin 41 74 NOI 0.27 P 1 55 IST TSP

+0.13 F/L Bobbin NQI 0.58 P 1 155 2ND TSP

+0.13 F/L Bobbin 41 76 NOI 0.36 P 1 145 STH TSP

+0.10 F/L Bobbin 41 77 ODI 31 0.34 P 1 113 3RD TSP

+0.10 F/L Bobbin 42 24 WAR 19 1.02 P 4 0 2AVB

+0.00 F/L Bobbin 42 39 NOI 0.41 P 1 30 IST TSP

+0.00 F/L Bobbin 42 42 WAR 11 0.56 P 4 0 1AVB

+0.00 F/L Bobbin 42 43 WAR 12 0.63 P 4 0 2AVB

+0.00 F/L i

Bobbin WAR 13 0.67 P 4 0 1AVB

+0.00 F/L Bobbin WAR 19 1.02 P 4 0 3AVB

+0.00 F/L Bobbin 42 51 WAR 15 0.75 P 4 0 1AVB

+0.00 F/L Bobbin 42 52 NQI 1.36 3 23 TTS-CL

+6.50 F/L Bobbin 42 57 NOI 2.38 3 18 TTS-CL

+20.69 F/L Bobbin WAR 18 0.98 P 4 0 1AVB

+0.00 F/L Bobbin 42 68 NOI 0.51 P 1 150 2ND TSP

+0.08 F/L Bobbin 42 74 NOI 8.39 3 170 7TH TSP

+18.42 F/L U-Bend VOL 4.71 1 161 7TH TSP

+18.42 7TH TSP Bobbin 42 76 ODI 29 0.58 3 122 3RD TSP

+32.47 F/L Bobbin 43 32 NOI 1.28 3 39 4TH TSP

+22.87 F/L H/L Special I VOL 1.09 1 120 4TH TSP

+23.43 4TH TSP Bobbin 43 40 WAR 15 0.76 P 4 0 1AVB

+0.00 F/L Bobbin 43 41 WAR 19 1.02 P 4 0 1AVB

+0.00 F/L Bobbin 43 46 WAR 16 0.86 P 4 0 1AVB

+0.00 F/L Bobbin 43 51 WAR 14 0.72 P 4 0 1AVB

+0.00 F/L Bobbin 43 56 WAR 19 1.06 P 4 0 1AVB

+0.00 F/L Bobbin 43 57 WAR 19 1.05 P 4 0 1AVB

+0.00 F/L Bobbin 43 58 ADI 3.46 6 61 17TH TSP

+16.65 F/L C/L Special I VOL 1.02 1 122 16TH TSP

-6.21 16TH TSP Bobbin 43 61 ADI 2.23 6 58 14TH TSP

+14.11 F/L Bobbin 43 68 ODI 23 0.40 P 1 117 IST TSP

+0.00 F/L Bobbin 43 74 NQI 0.19 P 1 152 STH TSP

+0.00 F/L Bobbin 43 87 ADI 8.99 6 71 9TH TSP

+7.14 F/L C/L Special I VOL 0.95 1 151 9TH TSP

+6.59 9TH TSP Bobbin 44 28 ODI 7

1.54 4 130 2ND TSP

+13.73 F/L Bobbin 44 35 NQI 0.42 P 1 90 3RD TSP

+0.00 F/L Bobbin 44 48 ODI 22 0.45 3 126 17TH TSP

+10.62 F/L Bobbin 45 77 ADI 4.77 6 95 15TH TSP

-1.54 F/L C/L Special I VOL 0.84 1 116 ISTH TSP

-2.12 15TH TSP H/L Tubesheet 45 84 SAI 1.53 1 16 TTS-HL

-0.01 TTS-HL Oobbin 45 88 ODI 21 0.69 3 127 TTS-HL

+0.82 F/L Cobbin 46 31 ODI 10 1.83 4 129 9TH TSP

+33.98 F/L C/L Special I VOL 0.83 1 125 8TH TSP

-10.25 BTH TSP Bobbin 46 47 ODI 21 0.32 3 126 TTS-CL

+22.56 F/L C/L Special I VOL 0.94 1 158 20TH TSP

-5.86 20TH TSP Bobbin 46 59 WAR 6

0.96 P 2 0 16TH TSP

+0.00 F/L Bobbin 46 78 ODI 6

1.76 4 149 11TH TSP

+3.64 F/L Bobbin ODI 7

0.86 3 136 11TH TSP

+3.05 F/L C/L Special I VOL 0.66 1 110 11TH TSP

+3.46 11TH TSP Bobbin 46 87 ADI 2.40 6 63 STH TSP

+12.01 F/L H/L Special I VOL 1.55 1 119 STH TSP

+12.27 STH TSP

' BWNT TITBAN II (Version 2.1) 09/21/1994 15:45:25 McGuire Nuclear Station - Unit One i

s/g A 08/94 RFO Bobbin,C/L Special Interest,H/L Special Interest,H/L Tubesheet,U-Bend ATTACHMENT #9 - INDICATIONS OF IMPERFECTIONS INDICATIONS OF IMPERFECTIONS TEST TYPE ROW COL IND %TW VOLTS CHN DEG LOCATION EXTENT 1 Bobbin 47 30 IDI 94 13.87 P 1 31 TE-HL

+8.38 F/L Bobbin 47 56 NQI 0.36 3 90 TTS-HL

+17.02 F/L Bobbin WAR 9

1.73 P 2 0 14TH TSP

+0.00 F/L Bobbin WAR 26 5.89 P 2 0 16TH TSP

+0.00 F/L H/L Special I VOL 0.51 1 59 TTS-HL

+16.78 TTS-HL Bobbin 47 58 WAR 15 2.62 P 2 0 14TH TSP

+0.00 F/L Bobbin 47 59 WAR 5

0.73 P 2 0 12TH TSP

+0.00 F/L Bobbin WAR 5

0.76 P 2 0 17TH TSP

+0.00 F/L Bobbin WAR 10 1.64 P2 0 16TH TSP

+0.00 F/L Bobbin WAR 14 2.50 P 2 0 14TH TSP

+0.00 F/L Bobbin 47 60 WAR 5

0.83 P 2 0 17TH TSP

+0.00 F/L Bobbin WAR 7

1.20 P 2 0 14TH TSP

+0.00 F/L Bobbin WAR 14 2.55 P 2 0 16TH TSP

+0.00 F/L H/L Tubesheet 47 63 MAI 1.42 1 9 TTS-HL

-3.49 TTS-HL Bobbin 47 77 WAR 8

1.40 P 2 0 16TH TSP

+0.00 F/L H/L Tubesheet 47 86 SAI 0.48 1 17 TTS-HL

-0.88 TTS-HL Bobbin 48 37 WAR 4

0.78 P 2 0 16TH TSP

+0.00 F/L Bobbin 48 38 WAR 11 2.02 P 2 0 16TH TSP

+0.00 F/L Bobbin 48 41 WAR 12 2.21 P 2 0 16TH TSP

+0.00 F/L Bobbin 48 53 WAR 8

1.56 P 2 0 17TH TSP

+0.00 F/L Bobbin 48 54 WAR 23 4.93 P 2 0 16TH TSP

+0.00 F/L Bobbin 48 55 WAR 12 2.32 P 2 0 16TH TSP

+0.00 F/L Bobbin 48 56 WAR 7

1.27 P 2 0 17TH TSP

+0.00 F/L Bobbin WAR 14 2.70 P 2 0 16TH TSP

+0.00 F/L Bobbin WAR 15 2.91 P 2 0 12TH TSP

+0.00 F/L Bobbin WAR 23 5.05 P 2 0 14TH TSP

+0.00 F/L Bobbin 48 59 WAR 7

1.18 P 2 0 16TH TSP

+0.00 F/L Bobbin 48 62 WAR 26 5.42 P 2 0 16TH TSP

+0.00 F/L H/L Tubesheet 48 85 VOL 0.42 1 155 TTS-HL

-0.22 TTS-HL H/L Tubesheet 48 86 SAI 0.64 1 157 TTS-HL

-0.05 TTS-HL Bobbin 49 35 WAR 7

1.17 P 2 0 16TH TSP

+0.00 F/L Bobbin 49 37 WAR 10 1.87 P 2 0 16TH TSP

+0.00 F/L Bobbin 49 30 WAR 17 3.36 P 2 0 16TH TSP

+0.00 F/L Bobbin 49 40 WAR 15 2.98 P 2 0 17TH TSP

+0.00 F/L Bobbin WAR 18 3.65 P 2 0 16TH TSP

+0.00 F/L Bobbin 49 41 WAR 3

0.58 P 2 0 14TH TSP

+0.00 F/L Bobbin WAR 14 2.72 P 2 0 16TH TSP

+0.00 F/L Bobbin 49 42 WAR 23 4.90 P 2 0 16TH TSP

+0.00 F/L Bobbin 49 43 WAR 14 2.74 P 2 0 16TH TSP

+0.00 F/L Bobbin WAR 14 2.84 P 2 0 17TH TSP

+0.00 F/L Bobbin WAR 17 3.35 P 2 0 15TH TSP

+0.00 F/L Bobbin 49 45 WAR 3

0.58 P 2 0 14TH TSP

+0.00 F/L Bobbin WAR 6

0.96 P 2 0 15TH TSP

+0.00 F/L Bobbin WAR 6

1.03 P 2 0 16TH TSP

+0.00 F/L Bobbin 49 46 NQI 0.37 3 102 4TH TSP

+19.57 F/L Bobbin NOI 0.66 3 95 3RD TSP

+23.50 F/L H/L Special I VOL 1.09 1 131 3RD TSP

+23.56 3RD TSP H/L Special I VOL 1.19 1 132 4TH TSP

+19.91 4TH TSP Bobbin 49 50 WAR 18 3.81 P 2 0 16TH TSP

+0.00 F/L Bobbin 49 53 WAR 12 2.23 P 2 0 14TH TSP

+0.00 F/L Bobbin WAR 15 2.87 P 2 0 12TH TSP

+0.00 F/L Bobbin WAR 19 3.82 P 2 0 17TH TSP

+0.00 F/L Bobbin WAR 19 4.00 P 2 0 19TH TSP

+0.00 F/L Bobbin WAR 22 4.86 P 2 0 16TH TSP

+0.00 F/L Bobbin 49 57 WAR 6

1.08 P 2 0 12TH TSP

+0.00 F/L Bobbin WAR 14 2.83 P 2 0 17TH TSP

+0.00 F/L Bobbin WAR 15 2.99 P 2 0 14TH TSP

+0.00 F/L Bobbin WAR 17 3.33 P 2 0 16TH TSP

+0.00 F/L Bobbin 49 64 WAR 10 1.77 P 2 0 16TH TSP

+0.00 F/L Bobbin WAR 12 2.01 P 2 0 17TH TSP

+0.00 F/L U-Bend 49 72 VOL 1.56 1 19 4AVB

+0.00 4AVB Bobbin 49 74 WAR 24 4.01 P2 0 16TH TSP

+0.00 F/L Bobbin 49 77 WAR 10 1.73 P 2 0 16TH TSP

+0.00 F/L Bobbin 49 80 NQI 2.03 P 1 31 TE-CL

+17.14 F/L l

l l

I

1 e

BWNT TUBAN II (Version 2.1) 09/21/1994 15:45:25 McGuire Nuclear Station - Unit One Ti/G A 09/94 RFO Bobbin,C/L Special Interest,H/L Special Interest,H/L Tubesheet,U-Bend J

Page 10 of 10 ATTACHMENT #9 - INDICATIONS OF IMPERTECTIONS INDICATIONS OF IMPERFECTIONS TEST TYPE ROW COL IND %TW VOL?3 CHN DEG LOCATION EXTENT 1 Totcl Indications Found = 584 Total Tubes Found = 347 t-1

.J

s BWNT TUBAN II (Version 2.1) 09/22/1994 16:06:39 McGuire Nuclear Station - Unit One S/G B 08/94 RFO Bobbin,C/L Special Interest,H/L Special Interest,H/L Tubesheet,U-Bend Page 1 of 12 ATTACHMENT #10 - INDICATIONS OF IMPERFECTIONS UJDICATIONS OF IMPERFECTIONS TEST TYPE ROW COL IND %TW VOLTS CHN DEG LOCATION EXTENT 1 Bobbin 2 22 ADI 2.75 6 59 9TH TSP

+13.78 BTH TSP Bobbin NOI 0.59 3 132 18TH TSP

+1.51 BTH TSP C/L Special I VOL 0.43 1 112 9TH TSP

+12.71 9TH TSP C/L Special I VOL 0.34 1 123 18TH TSP

+1.66 18TH TSP Bobbin 2 25 ODI 8

0.69 3 146 10TH TSP

+30.50 8TH TSP C/L Special I VOL 0.94 1 135 9TH TSP

-12.77 9TH TSP Bobbin 2 27 ODI 20 0.70 3 129 13TH TSP

+4.59 BTH TSP C/L Special I VOL 0.28 1 105 13TH TSP

+4.95 13TH TSP Bobbin 2 52 ADI 2.09 6 74 12TH TSP

+7.84 BTH TSP C/L Special I VOL 0.65 1 55 12TH TSP

+6.86 12TH TSP Bobbin 2 54 NQI 0.26 3 49 TTS-CL

+18.54 BTH TSP C/L Special I VOL 9.56 1 71 TTS-CL

+18.32 20TH TSP Bobbin 2 61 NOI 0.86 3 147 15TH TSP

-1.29 8TH TSP C/L Special I VOL 0.33 1 151 15TH TSP

-1.20 ISTH TSP H/L Tubesheet 2 62 SAI 0.47 1 20 TTS-HL

+0.04 TTS-HL Bobbin 3

1 IDI 96 16.98 P 1 34 TE-HL

+8.77 BTH TSP U-B nd 3 12 NOI 3.37 1 14 BTH TSP

+1.06 8TH TSP Bobbin NOI 0.50 A 45 20TH TSP

+7.99 BTH TSP Bobbin 3 39 IDI 48 5.4L T, 106 TE-HL

+5.11 BTH TSP Bobbin 3 47 ADI 2.68 6 84 14TH TSP

+3.33 BTH TSP Bobbin IDI 99 15.48 P 1 38 TE-HL

+8.00 BTH TSP C/L Special I VOL 0.71 1 154 14TH TSP

+1.31 to

+3.55 13TH TSP H/L Tubesheet 3 62 SAI 0.64 1 48 TTS-HL

-0.10 TTS-HL H/L Tubesheet 3 63 SAI 0.67 1 35 TTS-HL

-1.35 TTS-HL Bobbin 3 65 ODI 39 1.08 P 1 114 IST TSP

+0.05 BTH TSP H/L Special I SAI 1.06 1 63 IST TSP

+0.06 IST TSP U-B:nd 3 85 VOL 2.64 1 160 BTH TSP

+3.73 BTH TSP Bobbin 3 93 ODI 18 4.89 3 7 4TH TSP

+37.44 8TH TSP Bobbin 3 95 IDI 10 3,07 P 1 144 TE-HL

+5.34 BTH TSP Bobbin IDI 55 10.20 P 1 22 TE-HL

+5.99 8TH TSP Bobbin 4

1 IDI 94 24.87 P 1 47 TE-HL

+9.20 GTH TSP Bobbin 4

4 ADI 5.14 6 68 3RD TSP

+6.39 BTH TSP H/L Special I VOL 0.41 1 113 3RD TSP

+5.67 3RD TSP Bobbin 4

6 ODI 2

0.61 3 153 9TH TSP

+18.38 8TH TSP Bobbin 4 14 NOI 0.49 3 90 16TH TSP

+1.83 BTH TSP C/L Special I VOL 0.26 1 70 15TH TSP

-8.76 15TH TSP Bobbin 4 16 ODI 7

0.60 3 147 9TH TSP

+16.46 BTH TSP C/L Special I VOL 0.56 1 31 9TH TSP

+16.90 9TH TSP Bobbin 4 40 ODI 37 0.38 3 108 TTS-CL

+3.59 BTH TSP H/L Tubesheet 4 59 SAI 0.60 1 35 TTS-HL

-0.11 TTS-HL Bobbin 4 77 NOI 0.56 P 1 133 2ND TSP

-0.05 8TH TSP Bobbin 4 83 NOI 0.44 P 1 101 2ND TSP

+0.02 BTH TSP Bobbin NOI 0.58 P 1 48 IST TSP

-0.11 BTH TSP H/L Special I SAI 0.44 1 45 2ND TSP

+0.04 2ND TSP H/L Tubesheet 4 108 SAI 0.87 1 14 TTS-HL

-2,14 TTS-HL Bobbin 5

9 NOI 0.74 P1 33 12TH TSP

+0.45 BTH TSP H/L Tubesheet 5 19 MAI 0.64 1 34 TTS-HL

-1.52 TTS-HL Bobbin 5 27 NQI 7.87 P 1 149 TE-HL

+15.68 BTH TSP H/L Tubesheet 5 57 SAI O.63 1 172 TTS-HL

-0.02 TTS-HL Bobbin 5 101 IDI 41 12.80 P 1 15 TE-HL

+16.10 BTH TSP Bobbin IDI 54 11.11 P 1 20 TE-HL

+12.35 BTH TSP Cobbin IDI 70 7.27 P 1 26 TE-HL

+9.10 BTH TSP Bobbin IDI 70 11.40 P 1 26 TE-HL

+8.17 BTH TSP Cobbin 5 108 IDI 97 3.40 P 1 35 TE-HL

+12.34 BTH TSP Bobbin 6

4 NQI 0.10 P 1 130 2ND TSP

+0.07 F/L Bobbin 6 11 NQI 0.26 P 1 82 IST TSP

+0.00 F/L H/L Tubesheet 6 25 MAI 0.77 1 15 TTS-HL

+0.07 TTS-HL Cobbin 6 27 NOI 0.40 3 95 11TH TSP

+33.62 F/L Bobbin 6 32 ODI 9

0.83 3 143 3RD TSP

+40.92 F/L H/L Special I VOL 0.58 1 89 3RD TSP

+40.90 4TH TSP H/L Special I VOL 0.86 1 113 4TH TSP

-0.34 4TH TSP Bobbin 6 34 IDI 88 13.55 P 1 45 TE-HL

+11.47 F/L H/L Tubenheet 6 37 SAI 0.82 1 9 TTS-HL

+0.00 TTS-HL H/L Tubesheet 6 43 SAI 0.31 1 53 TTS-HL

+0.00 TTS-HL H/L Tubesheet 6 99 SAI 0.78 1 33 TTS-HL

-3.09 TTS-HL i

BWNT TUBAN II (Version 2.1) 09/22/1994 16:06:39 l

McGuire Nuclear Station - Unit One S/G B e***e***

08/94 RFO Bobbin,C/L Special Interest,H/L Special Interest,H/L Tubesheet,U-Bend Page 2 of 12 ATTACHMENT #10 - INDICATIONS OF IMPERFECTIONS i

INDICATIONS OF IMPERFECTIONS i

TEST TYPE ROW COL IND %TW VOLTS CHN DEG LOCATION EXTENT 1 t

Bobbin 7

2 IDI 74 15.23 P 1 25 TE-HL

+9.53 F/L l

Bobbin IDI 82 22.37 P 1 20 TE-HL

+2.92 F/L t

Bobbin 7

4 NQI 2.73 P 1 198 TE-CL

+11.97 F/L i

H/L Tubesheet 7 15 NQI 0.59 1 168 TTS-HL

+0.10 TTS-HL Bobbin 7 22 IDI 26 10.89 P 1 9 TE-HL

+18.23 F/L r

H/L Special I MAI 1.06 1 27 TE-HL

+18.52 TTS-HL i

H/L Special I SAI 3.34 1 28 TE-HL

+0.58 TTS-HL

-l Bobbin 7 23 IDI 44 10.36 P 1 15 TE-HL

+17.29 F/L 1

Bobbin 7 29 IDI 73 21.00 P 1 22 TE-HL

+10,67 F/L l

Bobbin 7 42 IDI 47 9.81 P 1 16 TE-HL

+17.22 F/L l

H/L Tubenheet 7 57 SCI 0.94 1 156 TTS-HL

-0.13 TTS-HL i

Bobbin 7 69 NOI 0.58 P 1 72 2ND TSP

+0.04 F/L i

H/L Special I SAI 0.90 1 59 2ND TSP

-0.02 2ND TSP i

Bobbin 7 106 ODI 7

0.83 3 146 3RD TSP

+20.67 F/L l

Bobbin ODI 18 0.29 P 1 124 2ND TSP

-0.09 F/L l

H/L Special I MAI 0.37 1 39 2ND TSP

-0.14 2ND TSP H/L Special I VOL 0.53 1 97 3RD TSP

+19.53 3RD TSP i

Bobbin 8 22 ODI 18 1.49 3 134 17TH TSP

+16.04 F/L C/L Special I VOL 0.82 1 115 16TH TSP

-6.05 16TH TSP H/L Tubesheet 8 24 SAI 0.50 1 30 TTS-HL

+0.14 TTS-HL H/L Tubesheet 8 28 SAI 0.85 1 30 TTS-HL

+0.13 TTS-HL l

H/L Tubesheet 8 39 SAI 0.29 1 29 TTS-HL

+0.14 TTS-HL Bobbin 8 46 IDI 76 13.61 P 1 26 TE-HL

+16.21 F/L Bobbin 8 56 IDI 41 15.12 P 1 12 TE-HL

+14.31 F/L i

Bobbin 8 60 ODI 14 0.48 3 138 2ND TSP

+31.36 F/L j

H/L Special I VOL 0.28 1 112 2ND TSP

+31.52 3RD TSP l

H/L Special I 8 74 VOL 1.34 1 139 STH TSP

+21.08 STH TSP I

Bobbin 9

2 NOI 8.23 P 1 145 TE-HL

+11.31 F/L Bobbin 9

3 IDI 73 16.79 P 1 67 TE-HL

+7.47 F/L i

Bobbin 9

4 ODI l'i 1.09 4 124 TTS-CL

+11.58 F/L

[

Bobbin 9

6 ODI 19 0.40 P 1 126 IST TSP

+0.02 F/L t

H/L Tubesheet 9 18 VOL 0.66 1 156 TTS-HL

+0.06

'TTS-HL Bobbin 9 68 ODI 40 0.23 P 1 103 2ND TSP

-0.02 F/L l

H/L Special I SAI 0.79 1 58 2ND TSP

-0.00 2ND TSP i

Bobbin 9 69 ODI 56 0.59 P 1 84 2ND TSP

+0.04 F/L I

H/L Special I SAI 0.64 1 60 2ND TSP

+0.00 2ND TSP I

H/L Tubesheet 9 70 SAI 1.42 1 14 TTS-HL

+0.10 TTS-HL s

Bobbin 9 76 NQI 0.46 P 1 137 3RD TSP

+0.09 F/L l

Bobbin 9 79 NQI 0.61 P 1 150 3RD TSP

+0.05 F/L Bobbin 9 96 ODI 32 0.75 3 113 9TH TSP

+6.30 F/L

}

C/L Special I VOL 0.81 1 118 9TH TSP

+6.36 9TH TSP i

Bobbin 9 100 IDI 34 7.45 P 1 11 TE-HL

+12.36 F/L H/L Tubesheet 10 14 SAI 0.49 1 37 TTS-HL

-2.54 TTS-HL Bobbin 10 21 IDI 62 10.80 P 1 21 TE-HL

+4.81 F/L Bobbin 10 27 ADI 2.51 6 44 10TH TSP

+13.38 F/L Bobbin 10 31 NQI 0.96 P 1 40 12TH TSP

-0.15 F/L Bobbin 10 43 ODI 31 0.81 3 116 10TH TSP

+28.60 F/L C/L Special I VOL 1.39 1 99 9TH TSP

-15.41 9TH TSP Bobbin 10 50 ODI 14 0.50 3 139 12TH TSP

+4.46 F/L Bobbin IDI 47 11.27 P 1 16 TE-HL

+15.01 F/L Bobbin 10 66 ODI 52 0.48 P 1 88 2ND TSP

+0.04 F/L H/L Special I SAI 0.67 1 72 2ND TSP

-0.07 2ND TSP Bobbin 10 67 ODI 74 0.24 P 1 62 2ND TSP

+0.00 F/L i

H/L Special I SAI 0.35 1 145 2ND TSP

+0.00 2ND TSP Bobbin 10 70 ODI 55 0.40 P 1 85 4TH TSP

+0.04 F/L Cobbin ODI 70 0.63 P 1 67 2ND TSP

+0.09 F/L l

H/L Special I SAI 1.23 1 36 2ND TSP

-0.04 2ND TSP j

H/L Tubesheet 10 87 SAI 0.69 1 34 TTS-HL

-0.06 TTS-HL i

Bobbin 10 98 ODI 56 0.35 P 1 84 2ND TSP

+0.13 F/L H/L Special I SAI 0.25 1 74 2ND TSP

+0.06 2ND TSP l

Bobbin 11 8 NQI 0.58 3 122 17TH TSP

+15.60 F/L C/L Special I VOL 0.46 1 106 16TH TSP

-6.40 16TH TSP i

Bobbin 11 14 NQI 0.33 3 99 17TH TSP

+19.34 F/L j

Bobbin ODI 41 0.47 3 103 16TH TSP

+5.60 F/L

[

C/L Special I VOL 0.22 1 149 16TH TSP

+5.73 16TH TSP j

i s

c

9 BWNT *1UBAN II (Version 2.1) 09/22/1994 16:06:39 McGuire Nuclear Station - Unit One S/G B 08/94 RFO Bobbin,C/L Special Interest,H/L Special Interest,H/L Tubesheet,U-Bend Page 3 of 12 7

ATTACHMENT #10 - INDICATIONS OF IMPERFECTIONS

{

INDICATIONS OF IMPERFECTIONS TEST TYPE ROW COL IND LTW VOLTS CHN DEG LOCATION EXTENT 1 p

Bobbin 11 15 ODI 28 1.36 4 112 10TH TSP

+31.38 F/L C/L Special I VOL 0.42 1 111 STH TSP

-13.06 9TH TSP l

Bobbin 11 25 ADI 2.36 6 83 9TH TSP

+33.52 F/L C/L Special I VOL O.33 1 115 9TH TSP

+33.58 9TH TSP j

Bobbin 11 30 IDI 88 13.32 P 1 50 TE-HL

+6.40 F/L t

Bobbin 11 52 IDI 87 15.76 P 1 51 TE-HL

+11.32 F/L H/L Tubesheet 11 63 SCI 0.41 1 149 TTS-HL

-0.15 TTS-HL H/L Tubesheet 11 64 SAI 0.72 1 25 TTS-HL

-3.57 TTS-HL H/L Tubesheet 11 85 SAI 0.61 1 40 TTS-HL

-3.30 TTS-HL Bobbin 11 86 IDI 83 34.28 P 1 51 TE-HL

+17.88 F/L I

Bobbin 11 94 ODI 3

0.69 3 154 4TH TSP

+32.23 F/L i

Bobbin ODI 4

0.69 3 153 4TH TSP

+39.46 F/L Bobbin ODI 8

0.41 3 146 4TH TSP

+34.25 F/L Bobbin ODI 16 0.32 3 135 4TH TSP

+38.75 F/L r

H/L Special I VOL 0.51 1 117 STH TSP

-3.27 STH TSP H/L Special I VOL 0.51 1 143 STH TSP

-11.50 STH TSP H/L Special I VOL 0.82 1 166 STH TSP

-9.88 STH TSP H/L Special I VOL 0.87 1 161 STH TSP

-4.86 STH TSP H/L Tubesheet 11 102 MAI 2.40 1 39 TTS-HL

-3.77 TTS-HL i

Bobbin 11 106 ODI 2

0.76 3 156 9TH TSP

+4.78 F/L l

C/L Special I VOL 0.23 1 98 9TH TSP

+4.98 9TH TSP t

Bobbin 11 112 IDI 50 20.87 P 1 17 TE-HL

+3.30 F/L Bobbin 12 6 ODI 9

0.87 3 146 3RD TSP

+11.66 F/L Bobbin ODI 30 0.56 P 1 117 2ND TSP

-0.07 F/L H/L Tubesheet SAI 0.83 1 16 TTS-HL

-0.04 TTS-HL f

H/L Special I SAI 0.70 1 89 2ND TSP

+0.00 2ND TSP l

Bobbin 12 8 NOI 0.31 P 1 69 STH TSP

+0.04 F/L H/L Special I SAI 0.27 1 135 STH TSP

-0.01 STH TSP Bobbin 12 10 ODI 10 1.21 3 144 6TH TSP

+2.56 F/L H/L Special I VOL 1.45 1 132 6TH TSP

+2.25 6TH TSP Bobbin 12 11 ODI 38 0.51 3 107 TTS-CL

+12.67 F/L

+

Bobbin ODI 42 0.42 3 102 TTS-CL

+12.42 F/L i

C/L Special I SAI 0.22 1 108 TTS-CL

+12.52 TTS-CL C/L Special I SAI 0.33 1 63 TTS-CL

+12.73 TTS-CL Bobbin 12 12 NOI 0.44 P 1 43 IST TSP

-0.04 F/L Bobbin ODI 23 0.36 P 1 128 3RD TSP

+0.11 F/L i

Bobbin 12 17 NOI 0.57 3 82 3RD TSP

+6.06 F/L H/L Special I VOL 1.55 1 192 3RD TSP

+6.07 3RD TSP Bobbin 12 18 IDI 74 10.98 P 1 65 TE-HL

+12.02 F/L Bobbin 12 29 IDI 82 26.24 P1 28 TE-HL

+3.10 F/L

{

H/L Tubesheet 12 32 SAI 0.61 1 25 TTS-HL

+0.01 TTS-HL i

Bobbin 12 48 NQI 0.20 P 1 111 ISTH TSP

-0.11 F/L Bobbin 12 67 NOI 5.01 P 1 27 TE-HL

+16.91 F/L Bobbin ODI 29 0.47 P 1 119 IST TSP

-0.13 F/L l

H/L Special I SAI 4.27 1 33 TTS-HL

-4.63 TTS-HL i

H/L Special I SAI 0.29 1 112 IST TSP

-0.21 IST TSP Bobbin 12 72 IDI 44 11.91 P 1 15 TE-HL

+5.64 F/L H/L Tubesheet 12 84 SAI 1.01 1 33 TTS-HL

-3.18 TTS-HL Bobbin 13 5 ODI 16 0.48 P 1 137 2ND TSP

+0.12 F/L H/L Special I SAI 0.43 1 41 2ND TSP

+0.02 2ND TSP Bobbin 13 11 ODI 67 0.57 P 1 73 IST TSP

+0.02 F/L H/L Special I SAI 0.97 1 28 IST TSP

+0.01 1ST TSP H/L Tubesheet 13 19 MAI 0.60 P 2 16 TTS-HL

-0.03 TTF-HL Bobbin 13 37 ODI 26 0.64 3 122 18TH TSP

+3.95 F/L C/L Special I VOL 0.44 1 97 18TH TSP

+3.94 17TH TSP Bobbin 13 47 IDI 82 16.17 P 1 55 TE-HL

+4.37 F/L Bobbin 13 88 ODI 15 0.53 P 1 132 IST TSP

-0.07 F/L Eobbin 13 92 ODI 14 1.04 3 139 4TH TSP

+35.49 F/L H/L-Special I VOL 0.89 1 138 STH TSP

-8.84 STH TSP Bobbin 13 106 ODI 62 0.45 P 1 79 IST TSP

+0.00 F/L i

H/L Special I SAI 0.30 1 48 IST TSP

-0.07 IST TSP Bobbin 14 8 NQI 0.47 P 1 100 4TH TSP

+0.10 F/L H/L Special I SAI 0.51 1 64 4TH TSP

-0.01 4TH TSP Bobbin 14 9 NQI 0.29 P 1 72 2ND TSP

+0.05 F/L r

H/L Tubesheet 14 30 SAI 0.26 1 43 TTS-HL

+0.05 TTS-HL

{

i J

BWNT TUBAN II (Version 2.1) 09/22/1994 16:06:39 McGuire Nuclear Station - Unit One S/G B 08/94 RFO Bobbin,C/L Special Interest,H/L Special Interest,H/L Tubesheet,U-Bend i

)

Page 4 of 12 ATTACHMENT #10 - INDICATIONS OF IMPERFECTIONS l

INDICATIONS OF IMPERFECTIONS l

TEST TYPE ROW COL IND %TW VOLTS CHN DEG LOCATION EXTENT 1 Bobbin 14 41 IDI 76 7.66 P 1 64 TE-HL

+14.02 F/L

+

Bobbin 14 42 IDI 41 9.54 P 1 105 TE-HL

+17.16 F/L Bobbin 14 51 ODI 3

0.94 3 155 3RD TSP

+28.87 F/L H/L Special I VOL 0.96 1 162 3RD TSP

+29.00 4TH TSP H/L Tubesheet 14 59 MAI 0.97 1 14 TTS-HL

-3.24 TTS-HL H/L Tubesheet 14 78 MAI 3.38 1 27 TTS-HL

-3.15 TTS-HL Bobbin 15 15 IDI 53 3.58 P 1 91 TE-HL

+13.94 F/L i

Bobbin 15 17 NQI 0.52 P 1 100 2ND TSP

+0.02 F/L Bobbin ODI 26 1.31 4 114 17TH TSP

+20.14 F/L H/L Special I MAI 0.52 1 37 2ND TSP

+0.00 2ND TSP i

C/L Special I VOL 0.61 1 108 16TH TSP

-2.38 16TH TSP Bobbin 15 20 IDI 1

6.58 P 1 157 TE-HL

+6.36 F/L Bobbin IDI 9

5.72 P 1 147 TE-HL

+11.84 F/L Bobbin IDI 52 8.29 P 1 94 TE-HL

+5.41 F/L Bobbin 15 32 IDI 64 7.78 P 1 78 TE-HL

+17.07 F/L H/L Tubesheet SAI 6.07 1 44 TTS-HL

-4.22 TTS-HL Bobbin 15 96 ODI 14 2.32 4 130 11TH TSP

+41.35 F/L C/L Special I VOL 0.28 1 93 10TH TSP

-0.52 10TH TSP l

C/L Special I VOL 0.57 1 81 10TH TSP

-2.91 10TH TSP Bobbin 16 38 IDI 94 58.62 P 1 42 TE-HL

+17.33 F/L r

Bobbin 16 43 ODI 10 1.78 4 132 11TH T.3P

+3.54 F/L l

C/L Special I VOL 0.27 1 112 11TH TSP

+3.75 11TH TSP Bobbin 16 44 IDI 60 5.00 P 1 21 TE-HL

+6.07 F/L t

Bobbin 16 47 ODI 34 0.52 P 1 114 IST TSP

-0.02 F/L H/L Special I SAI 0.80 1 35 IST TSP

-0.02 IST TSP f

H/L Tubesheet 16 57 MAI 1.02 1 15 TTS-HL

-2.12 TTS-HL Bobbin 16 91 NQI 1.01 3 49 10TH TSP

+31.48 F/L C/L Special I VOL 1.53 1 120 9TH TSP

-12.37 9TH TSP Bobbin 16 107 ODI 6

0.78 3 150 STH TSP

+15.32 F/L l

Bobbin ODI 8

0.49 3 147 4TH TSP

+22.86 F/L i

H/L Special I VOL 0.49 1 133 4TH TSP

+22.86 4TH TSP H/L Special I VOL 1.13 1 131 STH TSP

+15.32 STH TSP I

Bobbin 16 108 ODI 4

0.92 3 153 10TH TSP

+34.82 F/L C/L Special I VOL 0.97 1 123 9TH TSP

-8.91 9TH TSP i

Bobbin 17 18 ADI 1.28 4 61 9TH TSP

+5.88 F/L f

C/L Special I VOL 0.40 1 63 9TH TSP

+5.67 9TH TSP Bobbin 17 26 ODI 40 7.22 P 1 106 TE-HL

+13.74 F/L t

Bobbin 17 38 NOI 8.47 P 1 160 TE-HL

+13.66 F/L Bobbin NQI 11.77 P 1 160 TE-HL

+13.94 F/L H/L Tubesheet 17 42 VOL 1.15 1 167 TTS-HL

-0.08 TTS-HL Bobbin 17 59 ODI 4

0.79 3 152 3RD TSP

+40.34 F/L H/L Special I VOL 0.91 1 149 4TH TSP

-4.04 4TH TSP Bobbin 17 63 ODI 13 0.79 3 140 9TH TSP

+10.35 F/L Bobbin ODI 7

0.74 3 148 10TH TSP

+32.81 F/L f

C/L Special I VOL 0.31 1 132 9TH TSP

-11.34 9TH TSP

{

C/L Special I VOL 0.60 1 121 9TH TSP

+10.62 9TH TSP

~

Bobbin 17 65 ODI 33 0.48 3 115 4TH TSP

+42.39 F/L I

H/L Special I VOL 0.14 1 135 STH TSP

-1.86 STH TSP Bobbin 17 67 ODI 18 0.82 3 134 12TH TSP

+17.48 F/L Bobbin 17 68 IDI 33 3.66 P 1 117 TE-HL

+4.51 F/L Bobbin 17 70 NQI 19.42 P 1 162 TE-HL

+7.94 F/L l

Bobbin 17 71 ODI 7

0.79 3 148 3RD TSP

+8.59 F/L I

Bobbin 3DI 26 0.38 3 123 3RD TSP

+9.14 F/L Bobbin IDI 52 8.47 P 1 95 TE-HL

+16.18 F/L H/L Special I MAI 8.26 1 21 TTS-HL

-3.13 TTS-HL H/L Special I VOL 0.89 1 124 3RD TSP

+9.17 3RD TSP Bobbin 17 80 ODI 11 0.75 3 142 10TH TSP

+10.53 F/L F

  • obbin IDI 25 20.46 P 1 128 TE-HL

+1.83 F/L i

C/L Special I VOL 0.46 1 80 10TH TSP

+10.10 10TH TSP Bobbin 17 88 NOI 4.53 P 1 29 TE CL

+19.01 F/L t

Bobbin 17 96 NOI 2.81 P 1 55 TE-HL

+6.74 F/L l

  • >obbin 17 101 IDI 63 10.07 P 1 22 TE-HL

+8.43 F/L l

Bobbin 18 5 ODI 24 0.36 3 125 11TH TSP

+36.81 F/L C/L Special I VOL 1.07 1 158 10TH TSP

-7.72 10TH TSP i

Bobbin 18 37 NQI 9.74 P 1 164 TE-HL

+10.06 F/L

{

i f

1

BWNT TUBAN II (Version 2.1) 09/22/1994 16:06:39 McGuire Nuclear Station - Unit One S/G B 08/94 RFO Bobbin,C/L Special Interest,H/L Special Interest,H/L Tubesheet,U-Bend ATTACHMENT #10 - INDICATIONS OF IMPERFECTIONS INDICATIONS OF IMPERFECTIONS TEST TYPE ROW COL IND %TW VOLTS CHN DEG LOCATION EXTENT 1 Bobbin ODI 18 0.31 P 1 132 17TH TSP

-0.03 F/L Bobbin 18 40 IDI 75 12.01 P 1 67 TE-HL

+9.01 F/L Bobbin 18 51 ODI 22 0.26 3 127 11TH TSP

+8.20 F/L Bobbin 18 58 ODI 13 0.42 3 140 11TH TSP

+33.84 F/L C/L Special I VOL 0.47 1 138 11TH TSP

+33.84 10TH TSP H/L Tubesheet 18 102 SAI 1.85 1 167 TTS-HL

-0.23 TTS-HL Bobbin 19 31 NOI 8.73 P 1 147 TE-HL

+14.98 F/L Bobbin 19 32 IDI 75 9.57 P 1 58 TE-HL

+16.88 F/L H/L Tubesheet SAI 11.27 1 27 TTS-HL

-4.34 TTS-HL Bobbin 19 70 NOI 0.31 P 1 56 IST TSP

+0.05 F/L H/L Tubecheet 20 5 MAI 1.24 1 11 TTS-HL

+0.00 TTS-HL Bobbin 20 11 NOI 58.22 P 1 42 TE-HL

+15.85 F/L H/L Special I MAI 12.72 1 26 TE-HL

+16.70 TTS-HL Bobbin 20 32 IDI 37 9.34 P 1 104 TE-HL

+6.64 F/L H/L Tubesheet 20 48 SAI 0.38 2 36 TTS-HL

-0.08 TTS-HL Bobbin 20 59 ODI 6

1.39 3 147 9TH TSP

+18.58 F/L C/L Special I VOL 1.90 1 154 9TH TSP

+18.98 9TH TSP Bobbin 20 61 NQI 12.37 P 1 161 TE-HL

+11.27 F/L Bobbin 20 100 ODI 39 0.54 3 106 GTH TSP

+4.62 F/L H/L Special I VOL 0.46 1 111 6TH TSP

+4.62 6TH TSP Bobbin 20 103 ODI 10 0.99 4 139 10TH TSP

+33.66 F/L C/L Special I VOL 0.36 1 52 9TH TSP

-11.75 9TH TSP C/L Special I VOL 0.44 1 121 9TH TSP

-10.42 9TH TSP C/L Special I VOL 0.78 1 151 9TH TSP

-4.96 9TH TSP Bebbin 21 6 ODI 10 1.12 3 141 9TH TSP

+27.60 F/L C/L Special I VOL 1.09 1 105 9TH TSP

+27.83 9TH TSP Bobbin 21 7 ODI 49 0.36 3 92 4AVB

+3.21 F/L Bobbin 21 10 NQI 4.22 P 1 160 TE-HL

+12.19 F/L Bobbin 21 11 IDI 1

5.58 P 1 152 TE-HL

+15.06 F/L Bobbin IDI 26 2.16 P 1 119 TE-HL

+16.99 F/L Bobbin 21 12 IDI 28 5.16 P 1 116 TE-HL

+14.09 F/L Bobbin 21 16 ODI 16 0.90 3 133 STH TSP

+18.97 F/L H/L Special I VOL 0.80 1 96 STH TSP

+18.88 STH TSP Bobbin 21 22 ODI 13 0.88 3 137 TTS-CL

+1.14 F/L C/L Special I VOL 1.38 1 115 TTS-CL

+1.33 TTS-CL Bobbin 21 25 IDI 77 9.59 P 1 56 TE-HL

+11.42 F/L H/L Tubesheet MAI 1.16 1 12 TTS-HL

+0.09 TTS-HL Bobbin 21 30 IDI 39 6.97 P 1 106 TE-HL

+14.04 F/L Bobbin IDI 97 14.02 P 1 34 TE-HL

+3.78 F/L Bobbin IDI 98 44.01 P 1 37 TE-HL

+2.78 F/L Bobbin 21 31 IDI 76 10.17 P 1 57 TE-HL

+14.83 F/L Bobbin 21 37 IDI 45 16.24 P 1 13 TE-HL

+1.85 F/L Bobbin 21 42 IDI 60 8.13 P 1 76 TE-HL

+17.95 F/L H/L Tubesheet MAI 5.66 1 27 TTS-HL

-3.41 TTS-HL Bobbin 21 51 ODI 31 0.36 P 1 112 17TH TSP

-0.05 F/L Bobbin 21 64 NOI 9.73 P 1 163 TE-HL

+8.30 F/L Bobbin 21 65 ODI 24 0.28 P 1 122 IST TSP

+0.00 F/L Bobbin 21 86 NOI 0.40 3 85 3RD TSP

+26.11 F/L Bobbin ODI 36 0.51 3 110 3RD TSP

+27.79 F/L H/L Special I VOL 0.49 1 94 3RD TSP

+26.11 3RD TSP H/L Special I VOL 0.51 1 100 3RD TSP

+27.79 3RD TSP Bobbin 21 93 ODI 10 0.47 3 142 STH TSP

+4.02 F/L Cobbin ODI 14 0.61 3 137 STH TSP

+12.07 F/L Bobbin ODI 14 0.69 3 137 STH TSP

+9.50 F/L H/L Special I VOL 0.44 1 61 STH TSP

+4.02 STH TSP H/L Special I VOL 0.55 1 115 STH TSP

+9.50 STH TSP H/L Special I VOL 0.64 1 125 STH TSP

+12.07 STH TSP Bobbin 21 99 ODI 22 2.14 4 327 13TH TSP

+5.29 F/L C/L Special I VOL 0.50 1 101 13TH TSP

+4.60 13TH TSP Bobbin 22 6 WAR 15 0.58 P 4 0 4AVB

+0.00 F/L Cobbin 22 10 IDI 53 5.40 P 1 84 TE-HL

+9.04 F/L Bobbin 22 18 IDI 19 2.63 P 1 128 TE-HL

+16.86 F/L Bobbin IDI 54 6.89 P 1 83 TE-HL

+15.85 F/L Bobbin IDI 95 26.00 P 1 35 TE-HL

+5.74 F/L Bobbin 22 22 NOI 0.55 3 58 9TH TSP

+10.33 F/L l

I********

BWNT TUBAN II (Version 2.1) 09/22/1994 16:06:39 McGuire Nuclear Station - Unit One e*******

S/G B 08/94 RFO Bobbin,C/L Special Interect,H/L Special Interest,H/L Tubenheet,U-Bend Page 6 of 12 ATTACHMENT #10 - INDICATIONS OF IMPERFECTIONS INDICATIONS OF IMPERFECTIONS TEST TYPE ROW COL IND %TW VOLTS CHN DEG IDCATION EXTENT 1 l

C/L Special I VOL 0.46 1 165 9TH TSP

+11.05 9TH TSP Bobbin 22 33 IDI 3

4.85 P 1 153 TE-HL

+10.09 F/L Bobbin IDI 69 13.97 P 1 24 TE-HL

+4.67 F/L Bobbin IDI 73 7.71 P 1 65 TE-HL

+13.99 F/L Bobbin IDI 80 21.01 P 1 57 TE-HL

+11.06 F/L i

Bobbin IDI 86 32.46 P 1 30 TE-HL

+2.68 F/L H/L Tubesheet SAI 1.58 1 37 TTS-HL

+0.13 TTS-HL Bobbin 22 35 NQI 18.96 P 1 177 TE-HL

+4.34 F/L Bobbin 22 36 IDI 46 14.42 P 1 16 TE-HL

+3.74 F/L Bobbin 22 42 NQI 8.78 P 1 160 TE-HL

+4.49 F/L Bobbin 22 43 ODI 10 1.53 3 141 20TH TSP

+1.72 F/L l

C/L Special I VOL 0.54 1 91 20TH TSP

+1.86 20TH TSP Bobbin 22 52 IDI 64 8.58 P 1 76 TE-HL

+16.90 F/L Bobbin 22 54 ADI 2.10 6 69 16TH TSP

+4.55 F/L Bobbin ODI 14 1.35 4 132 16TH TSP

+7.90 F/L C/L Special I VOL 0.33 1 91 16TH TSP

+4.89 ISTH TSP C/L Special I VOL 0.55 1 94 16TH TSP

+8.75 15TH TSP Bobbin 22 67 IDI 83 38.06 P 1 51 TE-HL

+12.60 F/L H/L Tubesheet SAI 1.11 1 18 TTS-HL

+0.00 TTS-HL H/L Tubesheet 22 75 SAI 0.28 1 33 TTS-HL

-2.96 TTS-HL Bobbin 22 85 WAR 4

0.25 P 4 0 1AVB

+0.00 F/L Bobbin WAR 5

0.31 P 4 0 4AVB

+0.00 F/L Bobbin 22 92 ODI 1

1.10 3 156 4TH TSP

+37.31 F/L H/L Special I VOL 0.45 1 118 STH TSP

-7.47 STH TSP Bobbin 22 97 ODI 22 0.62 3 128 STH TSP

+40.27 F/L Bobbin ODI 5

1.01 3 150 17TH TSP

+11.72 F/L l

H/L Special I VOL 1.06 1 131 6TH TSP

-4.43 6TH TSP C/L Special I VOL 0.61 1 84 17TH TSP

+11.32 17TH TSP Bobbin 22 99 ODI 13 1.75 4 135 6TH TSP

+20.13 F/L Bobbin ODI 26 0.63 3 122 6TH TSP

+22.66 F/L H/L Special I VOL 0.62 1 112 6TH TSP

+26.49 6TH TSP H/L Special I VOL 0.62 1 114 6TH TSP

+28.12 6TH TSP H/L Special I VOL 0.72 1 116 6TH TSP

+21.81 6TH TSP H/L Special I VOL 1.51 1 112 6TH TSP

+23.71 6TH TSP i

Bobbin 23 14 ODI 14 1.44 3 137 6TH TSP

+13.06 F/L H/L Special I VOL 0.91 1 89 6TH TSP

+13.34 6TH TSP H/L Special I VOL 1.05 1 110 6TH TSP

+14.54 6TH TSP Bobbin 23 19 IDI 64 11.75 P 1 70 TE-HL

+16.02 F/L Bobbin 23 20 IDI 1

5.06 P 1 142 TE-HL

+14.96 F/L Bobbin IDI 50 10.90 P 1 13 TE-HL

+3.93 F/L Bobbin IDI 60 6.28 P 1 75 TE-HL

+10.21 F/L H/L Tubesheet 23 22 VOL 0.55 1 156 TTS-HL

+0.51 TTS-HL Bobbin 23 26 IDI 66 9.69 P 1 68 TE-HL

+14.04 F/L i

Bobbin 23 34 NOI 36.93 P 1 38 TE-HL

+2.77 F/L Bobbin 23 36 IDI 90 4.26 P 1 39 TE-HL

+1.76 F/L Bobbin 23 39 IDI 1

5.14 P 1 142 TE-HL

+14.13 F/L Bobbin 23 41 IDI 78 20.21 P 1 53 TE-HL

+15.04 F/L Bobbin IDI 99 21.37 P 1 27 TE-HL

+1.82 F/L Bobbin 23 42 IDI 27 6.58 P 1 121 TE-HL

+15.09 F/L Bobbin 23 44 IDI 2

5.91 P 1 154 TE-HL

+5.35 F/L Bobbin 23 45 NQI 9.84 P 1 160 TE-HL

+16.93 F/L Bobbin IDI 9

5.57 P 1 145 TE-HL

+15.02 F/L Bobbin 23 48 IDI 23 6.51 P 1 126 TE-HL

+13.13 F/L Bobbin 23 62 NOI 5.94 3 10 2ND TSP

+35.78 F/L Bobbin 23 67 NQI 0.74 3 30 2ND TSP

+26.15 F/L H/L Special I VOL 0.25 1 62 2ND TSP

+26.15 2ND TSP H/L Tubecheet 23 69 SAI 0.46 1 51 TTS-HL

+0.15 TTS-HL Bobbin 24 16 IDI 68 7.43 P 1 72 TE-HL

+10.31 F/L r

Bobbin 24 25 IDI 81 17.30 P 1 56 TE-HL

+17.86 F/L H/L Tubesheet MAI 14.51 1 30 TTS-HL

-5.28 TTS-HL Bobbin 24 28 IDI 94 21.93 P 1 31 TE-HL

+9.48 F/L Bobbin 24 41 NOI 4.63 P 1 133 TE-HL

+3.44 F/L Bobbin NOI 5.68 P 1 147 TE-HL

+13.19 F/L H/L Tubesheet SAI 1.63 1 17 TTS-HL

+0.20 TTS-HL H/L Tubesheet 24 45 SAI 3.34 1 16 TTS-HL

+0.08 TTS-HL t

BWNT TUBAN II (Version 2.1) 09/22/1994 16:06:39 McGuire Nuclear Station - Unit One S/G B 08/94 RFO Bobbin,C/L Special Interest,H/L Special Interest,H/L Tubesheet,U-Bend Page 7 of 12 ATTACHMF5"' *10 - INDICATIONS OF IMPERFECTIONS INDIP.~.rIONS OF IMPERFECTIONS TEST TYPE ROW COL IND %TW VOLTS CHN DEG LOCATION EXTENT 1 Bobbin 24 49 NOI 6.43 P 1 168 TE-HL

+15.12 F/L Bobbin 24 50 IDI 78 13.93 P 1 60 TE-HL

+16.06 F/L Bobbin 24 52 NOI 4.94 P 1 160 TE-HL

+16.01 F/L Lobbin 24 93 ODI 14 0.56 3 138 19TH TSP

+3.30 F/L C/L Special I VOL 0.67 1 90 19TH TSP

+3.91 19TH TSP Bobbin 24 107 NOI 0.32 P 1 68 3RD TSP

-0.02 F/L Bobbin 25 33 IDI 31 8.74 P 1 113 TE-HL

+9.28 F/L Bobbin 25 34 IDI 32 5.12 P 1 112 TE-HL

+6.38 F/L Bobbin IDI 41 4.79 P 1 102 TE-HL

+3.43 F/L Bobbin IDI 41 7.56 P 1 102 TE-HL

+10.26 F/L Bobbin 25 42 NQI 9.39 P 1 140 TE-HL

+5.33 F/L Bobbin 25 44 NOI 8.75 P 1 155 TE-HL

+4.43 F/L Bobbin 25 50 NQI 4.99 P 1 147 TE-HL

+B.27 F/L' Bobbin IDI 58 8.33 P 1 83 TE-HL

+9.25 F/L Bobbin 25 62 NOI 0.57 P 1 93 3RD TSP

+0.00 F/L H/L Special I SAI 0.32 P 1 126 3RD TSP

+0.02 3RD TSP Bobbin 25 74 NOI 0.77 P 1 96 3RD TSP

+0.00 F/L H/L Special I SAI 1.06 1 41 3RD TSP

-0.13 3RD TSP Bobbin 25 89 NOI 3.98 P 1 36 TE-CL

+18.91 F/L Bobbin 25 92 NQI 13.26 P 1 27 TE-HL

+13.99 F/L Bobbin 25 94 ODI 78 0.84 P 1 61 IST TSP

-0.02 F/L H/L Special I SAI 0.51 1 74 IST TSP

-0.03 IST TSP Bobbin 25 96 ODI 17 0.96 3 134 4TH TSP

+18.78 F/L H/L Special I VOL 0.93 1 106 4TH TSP

+13.98 4TH TSP Bobbin 26 8 WAR 17 1.22 P 4 0 2AVB

+0.00 F/L Bobbin 26 13 NOI 0.50 P 1 49 IST TSP

+0.07 F/L H/L Special I SAI 0.41 1 93 IST TSP

+0.00 IST TSP Bobbin 26 19 NOI 0.82 P 1 36 IST TSP

+0.09 F/L H/L Special I SAI 0.27 1 91 IST TSP

+0.00 IST TSP Bobbin 26 36 IDI 33 5.55 P 1 111 TE-HL

+4.36 F/L H/L Tubesheet 26 47 SAI 0.48 1 33 TTS-HL

+0.00 TTS-HL Bobbin 26 73 NOI 2.57 P 1 119 TE-CL

+19.17 F/L H/L Tubenheet 26 80 SAI 3.47 1 46 TTS-HL

-3.82 TTS-HL H/L Tubesheet 26 82 SAI 2.66 1 29 TTS-HL

-2.50 TTS-HL Bobbin 26 87 NOI 3.69 P 1 62 TE-HL

+11.62 F/L H/L Special I MAI 1.76 1 16 TE-HL

+11.90 TTS-HL Bobbin 26 99 ODI 31 0.17 3 117 10TH TSP

+7.67 F/L Bobbin ODI 33 0.30 3 114 10TH TSP

+12.10 F/L C/L Special I VOL 0.21 1 141 10TH TSP

+11.53 10TH TSP C/L Special I VOL 0.36 1 154 10TH TSP

+7.36 10TH TSP Bobbin 27 14 NOI 0.78 P 1 42 12TH TSP

-0.05 F/L Bobbin ODI 10 0.87 P 1 140 IST TSP

+0.15 F/L H/L Special I SAI 0.49 1 66 IST TSP

+0.02 IST TSP Bobbin 27 16 IDI 89 63.39 P 1 48 TE-HL

+11.09 F/L Bobbin 27 19 NQI 0.37 P 1 54 11TH TSP

+0.00 F/L Bobbin 27 24 ODI 12 2.20 4 129 IST TSP

+15.49 F/L H/L Special I VOL 1.19 1 112 2ND TSP

-8.74 2ND TSP Bobbin 27 27 ODI 5

0.93 3 148 4TH TSP

+38.87 F/L H/L Special I VOL 1.32 1 128 4TH TSP

+39.90 STH TSP Bobbin 27 42 NOI 7.97 P 1 159 TE-HL

+8.80 F/L Bobbin ODI 6

7.51 P 1 136 TE-HL

+13.97 F/L H/L Tubenheet 27 63 SAI 1.96 1 22 TIS-HL

-0.13 TTS-HL U-Bend 27 64 VOL 5.72 1 14 2AVB

+4.78 3AVB U-Bend 27 65 VOL 6.61 1 19 7TH TSP

+46.50 3AVB U-Bend 27 66 VOL 7.79 1 17 2AVB

+5.25 3AVB Bobbin WAR 12 0.77 P 4 0 3AVB

+0.00 F/L Bobbin IDI 67 10.14 P 1 71 TE-HL

+16.41 F/L Cobbin IDI 72 8.16 P 1 65 TE-HL

+12.46 F/L H/L.Tubesheet MAI 13.29 1 29 TTS-HL

-4.87 TTS-HL H/L Tubesheet 27 70 MAI 0.51 1 32 TTS-HL

-4.11 TTS-HL Bobbin 27 89 NOI 1.20 3 140 2ND TSP

+5.33 F/L Bobbin 27 106 NQI 39.54 P 1 186 TE-HL

+3.04 F/L Bobbin 28 17 NQI 0.93 P 1 46 2ND TSP

-0.05 F/L H/L Special I SAI 1.01 1 22 2ND TSP

-0.05 2ND TSP Bobbin 28 61 ODI 15 0.68 3 137 12TH TSP

+18.75 F/L i

1 BWNT TUBAN II (Version 2.1) 09/22/1994 16:06:39 McGuire Nuclear Station - Unit One S/G B 08/94 RFO Bobbin,C/L Special Interest,H/L Special Interest,H/L Tubesheet,U-Bend i

ATTACHMENT #10 - INDICATIONS OF IMPERFECTIONS INDICATIONS OF IMPERFECTIONS TEST TYPE ROW COL IND %TW VOLTS CHN DEG LOCATION EXTENT 1 C/L Special I VOL 0

')

1 164 11TH TSP

-3.32 11TH TSP Bobbin 28 65 ODI 3

1.28 3 153 8TH TSP

+8.91 F/L U-Brnd VOL 2.41 1 42 8TH TSP

+8.95 8TH TSP Bobbin 28 73 ADI 6.78 6 88 TTS-HL

+6.78 F/L Bobbin NOI 0.88 3 63 IST TSP

+4.48 F/L H/L Special I VOL 1.61 1 132 TTS-HL

+7.53 IST TSP H/L Special I VOL 0.89 1 138 IST TSP

+1.37 IST TSP H/L Special I VOL 1.10 1 110 IST TSP

+4.43 IST TSP Bobbin 28 74 ODI 1

0.25 P 1 145 IST TSP

-0.39 F/L Bobbin 28 90 IDI 66 2.88 P 1 73 TE-HL

+13.97 F/L Bobbin 28 100 IDI 69 12.81 P 1 69 TE-HL

+11.53 F/L Bobbin 29 28 IDI 9

5.29 P 1 141 TE-HL

+16.83 F/L Bobbin 29 33 NOI 0.18 P 1 76 17TH TSP

-0.08 F/L Bobbin 29 72 ODI 15 1.89 4 137 9TH TSP

+13.36 F/L C/L Special I VOL 0.96 1 102 9TH TSP

+13.36 9TH TSP H/L Tubesheet 29 99 VOL 0.54 1 104 TTS-HL

+0.00 TTS-HL Bobbin 30 18 ODI 31 0.82 3 118 12TH TSP

+10.27 F/L C/L Special I VOL 1.22 1 95 12TH TSP

+10.27 11TH TSP Bobbin 30 23 NOI 0.83 P 1 74 IST TSP

+0.18 F/L Bobbin NOI 0.70 P 1 98 11TH TSP

-0.10 F/L Bobbin 30 35 WAR 20 1.42 P 4 0 2AVB

+0.00 F/L Bobbin 30 38 WAR 16 1.02 P 4 0 4AVB

+0.00 F/L Bobbin 30 77 ODI 3

0.63 3 153 9TH TSP

+13.13 F/L H/L Tubesheet MAI 1.23 1 35 TTS-HL

-4.05 TTS-HL C/L Special I VOL 0.76 1 101 9TH TSP

+13.32 8TH TSP Bobbin 30 78 NOI 0.49 3 100 12TH TSP

+15.41 F/L C/L Special I VOL 0.81 1 107 11TH TSP

-6.91 11TH TSP Bobbin 30 90 NOI 0.94 3 109 3RD TSP

+21.44 F/L Bobbin ODI 5

0.94 3 150 IST TSP

+18.04 F/L H/L Special I VOL 1.42 1 135 2ND TSP

-6.00 2ND TSP H/L Special I VOL 2.15 1 147 3RD TSP

+22.95 3RD TSP Bobbin 31 12 ADI 6.80 6 72 17TH TSP

+15.09 F/L C/L Special I VOL 0.41 1 63 16TH TSP

-6.87 16TH TSP Bobbin 31 31 NQI 0.52 P 1 45 IST TSP

+0.05 F/L Bobbin 31 56 IDI 89 14.81 P 1 42 TE-HL

+15.66 F/L Bobbin 31 59 IDI 75 10.23 P 1 66 TE-HL

+11.00 F/L Bobbin 31 60 IDI 24 4.42 P 1 126 TE-HL

+15.06 F/L Bobbin 31 66 IDI 4

5.45 P 1 142 TE-HL

+8.10 F/L H/L Tubenheet 31 67 SAI 1.11 1 29 TTS-HL

+0.26 TTS-HL Bobbin 31 68 NOI 7.06 P 1 156 TE-HL

+12.25 F/L Bobbin 31 72 NQI 4.76 P 1 161 TE-HL

+15.98 F/L Tobbin NOI 15.87 P 1 146 TE-HL

+13.38 F/L Bobbin 31 73 IDI 6

5.45 P 1 140 TE-HL

+10.48 F/L Bobbin 31 96 NOI 0.48 P 1 51 IST TSP

-0.38 F/L H/L Special I NQI O.70 1 44 IST TSP

-0.01 1ST TSP Bobbin 31 97 ODI 3

0.30 P 1 143 STH TSP

+0.05 F/L Bobbin 31 102 NOI 0.52 3 77 2ND TSP

+30.55 F/L H/L Special I VOL 0.52 1 87 3RD TSP

+3.31 3RD TSP H/L Special I VOL 1.60 1 114 3RD TSP

-13.91 3RD TSP Bobbin 32 24 NQI 0.34 P1 50 IST TSP

+0.54 F/L Bobbin 32 41 WAR 13 0.78 P4 0 3AVB

+0.00 F/L Bobbin 32 56 IDI 72 8.85 P 1 63 TE-HL

+18.05 F/L H/L Tubenheet SAI 8.74 1 26 TTS-HL

-3.61 TTS-HL Bobbin 32 64 NQI 7.59 P 1 163 TE-HL

+16.32 F/L Bobbin 32 75 ODI 9

0.68 3 145 2ND TSP

+6.61 F/L H/L Special I VOL 0.50 1 85 2ND TSP

+6.79 2ND TSP Bobbin 32 103 IDI 63 7.76 P 1 25 TE-HL

+7.32 F/L H/L Tubesheet 33 12 SCI 0.50 1 86 TTS-HL

+0.11 TTS-HL Cobbin 33 14 WAR 5

0.29 P 4 0 4AVB

+0.00 F/L Bobbin 33 16 IDI 43 6.02 P 1 97 TE-HL

+8.99 F/L Bobbin 33 63 NQI 0.49 P 1 55 IST TSP

+0.10 F/L Bobbin 33 66 IDI 83 21.45 P 1 33 TE-HL

+6.13 F/L Bobbin 33 67 NQI 0.39 P 1 50 IST TSP

+0.02 F/L H/L Special I SAI 0.50 1 34 IST TSP

+0.08 IST TSP Bobbin 33 77 ODI 35 0.38 3 111 16TH TSP

+7.31 F/L i

l

~ _ -

BWNT TUBAN II (Version 2.1) 09/22/1994 16:06:39 McGuire Nuclear Station - Unit One eeeeeeee S/G B 08/94 RFO Bobbin,C/L Special Interest,H/L Special Interest,H/L Tubesheet,U-Bend l

l Page 9 of 12 l

ATTACHMENT #10 - INDICATIONS OF IMPERFECTIONS INDICATIONS OF IMPERFECTIONS j

TEST TYPE ROW COL IND %TW VOLTS CHN DEG LOCATION EXTENT 1 l

U-Band 33 36 VOL 2.74 1 161 2AVB

+6.24 2AVB i

Bobbin ODI 6

2.02 3 147 2AVB

+7.19 F/L Bobbin 33 88 WAR 17 1.10 P 4 0 2AVB

+0.00 F/L Bobbin 33 99 ODI 1

1.44 3 154 3RD TSP

+29.20 F/L l

Bobbin ODI 23 0.40 3 125 3RD TSP

+27.34 F/L H/L Special I VOL 1.56 1 161 3RD TSP

+27.34 3RD TSP

[

H/L Special I VOL 1.94 1 159 3RD TSP

+29.20 3RD TSP Bobbin 33 100 WAR 22 1.56 P 4 0 2AVB

+0.00 F/L Bobbin 34 13 WAR 11 0.73 P 4 0 3AVB

+0.00 F/L l

Bobbin 34 16 WAR 18 1.26 P 4 0 3AVB

+0.00 F/L Bobbin 34 19 NQI 1.14 P1 51 2ND TSP

+0.08 F/L Bobbin 34 24 IDI 96 20.08 P 1 39 TE-HL

+1.46 F/L Bobbin 34 30 WAR 20 1.45 P 4 0 2AVB

+0.00 F/L Bobbin 34 33 ODI 5

1.23 4 145 STH TSP

+39.17 F/L t

H/L Special I VOL 1.39 1 112 6TH TSP

-4.95 6TH TSP i

Bobbin 34 45 IDI 91 7.99 P 1 31 TE-HL

+1.40 F/L t

Bobbin 34 57 IDI 2

6.63 P 1 151 TE-HL

+13.86 F/L Bobbin 34 64 IDI 2

11.54 P 1 159 TE-HL

+11.51 F/L f

Bobbin 34 70 NOI 0.20 P 1 65 2ND TSP

+0.14 F/L Bobbin 34 74 ODI 4

0.78 P 1 156 16TH TSP

-0.15 F/L Bobbin 34 76 ODI 7

0.90 3 146 4TH TSP

+10.26 F/L H/L Special I VOL 1.61 1 166 4TH TSP

+10.39 4TH TSP Bobbin 34 83 ODI 10 1.00 3 142 3RD TSP

+18.34 F/L Bobbin ODI 16 1.02 3 134 3RD TSP

+23.68 F/L i

H/L Special I VOL 1.13 1 21 3RD TSP

+24.94 3RD TSP Bobbin 34 88 ADI 1.53 6 57 TTS-CL

+24.02 F/L Bobbin 34 102 ODI 20 0.86 3 129 2ND TSP

-0.82 F/L H/L Special I VOL 0.29 1 88 2ND TSP

-0.82 2ND TSP Bobbin 35 14 ODI 30 0.50 3 118 IST TSP

+22.07 F/L U-Band VOL 1.36 1 138 7TH TSP

+2.46 7TH TSP r

H/L Tubesheet 35 20 SAI 0.91 1 16 TTS-HL

-0.12 TTS-HL Bobbin 35 35 NOI 8.16 P 1 158 TE-HL

+3.53 F/L Bobbin 35 39 WAR 11 0.73 P 4 0 1AVB

+0.00 F/L t

Bobbin IDI 40 8.26 P 1 107 TE-HL

+13.S8 F/L Bobbin 35 53 WAR 33 2.79 P 4 0 2AVB

+0.00 F/L Bobbin 35 75 WAR 16 1.01 P 4 0 3AVB

+0.00 F/L l

Bobbin 35 78 WAR 26 2.06 P 4 0 3AVB

+0.00 F/L Bobbin 35 99 IDI 67 34.43 P 1 24 TE-HL

+6.45 F/L H/L Tubesheet 36 31 MAI 0.68 1 31 TTS-HL

-3.04 TTS-HL Bobbin 36 39 WAR 21 1.28 P 4 0 1AVB

+0.00 F/L Bobbin 36 43 NOI 0.76 3 134 4TH TSP

+20.54 F/L H/L Special I VOL 2.29 1 143 4TH TSP

+20.66 4TH TSP Bobbin 36 55 NQI 0.37 P 1 72 2ND TSP

+0.05 F/L Bobbin 36 65 WAR 14 0.92 P 4 0 3AVB

+0.00 F/L Bobbin WAR 17 1.14 P 4 0 4AVB

+0.00 F/L Bobbin 36 69 WAR 20 1.43 P 4 0 3AVB

+0.00 F/L Bobbin 36 72 WAR 14 0.89 P 4 0 2AVB

+0.00 F/L U-B:nd 36 79 VOL 0.84 1 159 3AVB

-2.32 3AVB Bobbin NQI 1.75 3 154 3AVB

-2.14 F/L Bobbin 36 BB ODI 4

1.31 3 151 STH TSP

+22.48 F/L H/L Special I VOL 0.92 1 137 STH TSP

+22.62 STH TSP Bobbin 36 100 IDI 44 23.24 P 1 15 TE-HL

+4.34 F/L t

Bobbin 37 27 NOI 0.54 3 113 16TH TSP

-0.97 F/L t

C/L Special I VOL 1.09 1 121 16TH TSP

-0.97 16TH TSP Cobbin 37 32 ODI 11 1.89 3 142 19TH TSP

+4.33 F/L C/L Special I VOL 1.72 1 153 19TH TSP

+4.45 19TH TSP Cobbin 37 33 ODI 7

1.73 3 147 12TH TSP

+9.35 F/L C/L Special I VOL 1.68 1 166 12TH TSP

+9.33 12TH TSP Robbin 37 35 ODI 6

1.62 4 139 12TH TSP

+15.72 F/L Bobbin 37 57 IDI 9

14.37 P 1 144 TE-HL

+14.06 F/L

~

Bobbin 37 66 NOI 0.57 P 1 63 3RD TSP

+0.09 F/L H/L Special I SAI 0.79 1 31 3RD TSP

-0.05 3RD TSP t

Bobbin 37 85 IDI 86 3.98 P 1 31 TE-HL

+8.16 F/L Cobbin 37 88 NOI 0.62 3 145 17TH TSP

+6.42 F/L C/L Special I VOL 0.38 1 111 17TH TSP

+6.35 16TH TSP r

t

BWNT TUBAN II (Version 2.1) 09/22/1994 16:06:39 McGuire Nuclear Station - Unit One e*******

S/G B 08/94 RFO Bobbin,C/L Special Interest,H/L Special Interest,H/L Tubesheet,U-Bend Page 10 of 12 ATTACHMENT #10 - INDICATIONS OF IMPERFECTIONS INDICATIONS OF IMPERFECTIONS TEST TYPE ROW COL IND %TW VOLTS CHN DEG LOCATION EXTENT 1 Bobbin 38 17 WAR 13 0.70 P 4 0 1AVB

+0.00 F/L Bobbin 38 24 ODI 17 0.57 3 134 17TH TSP

+1.67 F/L Bobbin 38 30 IDI 87 32.28 P 1 51 TE-HL

+6.33 F/L Bobbin 38 54 WAR 14 0.75 P 4 0 2AVB

+0.00 F/L Bobbin WAR 18 1.07 P 4 0 3AVB

+0.00 F/L Bobbin WAR 20 1.22 P 4 0 1AVB

+0.00 F/L U-B:nd 38 58 VOL 1.04 P1 80 3AVB

+0.00 2AVB Bobbin WAR 39 4.70 P 4 0 3AVB

+0.00 F/L Bobbin 38 59 WAR 13 0.83 P 4 0 1AVB

+0.00 F/L Bobbin WAR 13 0.83 P 4 0 3AVB

+0.00 F/L Bobbin WAR 25 2.00 P 4 0 2AVB

+0.00 F/L Bobbiu 38 65 NQI 0.75 3 129 2ND TSP

+7.62 F/L Bobbin WAR 17 1.13 P 4 0 3AVB

+0.00 F/L H/L Special I VOL 0.52 1 98 2ND TSP

+7.42 2ND TSP Bobbin 38 69 WAR 12 0.71 P 4 0 3AVB

+0.00 F/L Bobbin 38 74 ODI 19 0.26 P 1 131 18TH TSP

+0.00 F/L Bobbin 38 75 IDI 26 5.40 P 1 122 TE-HL

+6.47 F/L Bobbin 39 18 WAR 15 0.92 P 4 0 3AVB

+0.00 F/L Dobbin 39 20 ODI 24 0.52 3 125 3RD TSP

+23.35 F/L Bobbin 39 43 WAR 13 0.71 P 4 0 3AVB

+0.00 F/L H/L Tubesheet 39 60 SAI 0.94 1 26 TTS-HL

-0.06 TTS-HL Bobbin 39 75 WAR 14 0.83 P 4 0 1AVB

+0.00 F/L Bobbin 39 80 WAR 6

0.39 P 4 0 4AVB

+0.00 F/L Bobbin WAR 27 2.15 P 4 0 2AVB

+0.00 F/L Bobbin WAR 32 2.94 P 4 0 3AVB

+0.00 F/L Bobbin 39 81 NOI 2.79 3 155 10TH TSP

+35.15 F/L C/L Special I VOL 1.54 1 145 9TH TSP

-8.91 9TH TSP Bcbbin 39 87 ODI 8

2.41 4 137 TTS-HL

+2.02 F/L Bobbin 39 96 ODI 25 0.41 3 123 10TH TSP

+17.14 F/L C/L Special I VOL 1.38 1 158 10TH TSP

+17.03 9TH TSP Bobbin 40 19 WAR 10 0.56 P 4 0 3AVB

+0.00 F/L Bobbin WAR 15 0.67 P 4 0 1AVB

+0.00 F/L Bobbin 40 21 WAR 14 0.80 P 4 0 1AVB

+0.00 F/L Bobbin 40 28 ADI 1.24 6 78 TTS-CL

+23.25 F/L i

Bobbin ADI 5.08 6 38 7TH TSP

+2.10 F/L Bobbin ADI 3.02 6 28 12TH TSP

+18.69 F/L Bobbin 40 35 ADI 2.92 6 26 9TH TSP

+12.38 F/L Bobbin ADI 1.98 6 35 10TH TSP

+38.47 F/L Bobbin 40 38 WAR 21 1.44 P 4 0 3AVB

+0.00 F/L Bobbin 40 39 NOI 0.46 3 139 10TH TSP

+31.75 F/L Bobbin 40 44 WAR 8

0.46 P 4 0 1AVB

+0.00 F/L Bobbin 40 47 WAR 11 0.61 P 4 0 1AVB

+0.00 F/L Bobbin 40 51 NQI 1.23 P 1 141 2ND TSP

-0.12 F/L H/L Special I SAI 0.72 1 48 2ND TSP

-0.19 2ND. TSP Bobbin 40 54 WAR 11 0.62 P 4 0 1AVB

+0.00 F/L Bobbin 40 62 WAR 12 0.68 P 4 0 1AVB

+0.00 F/L Bobbin 40 70 WAR 26 2.07 P 4 0 3AVB

+0.00 F/L Bobbin 40 76 ODI 15 0.55 3 135 9TH TSP

+9.92 F/L C/L Special I SAI 0.28 1 51 9TH TSP

+9.60 BTH TSP Bobbin 40 87 ODI 32 0.37 3 114 9TH TSP

+4.67 F/L C/L Special I SAI 0.44 1 105 9TH TSP

+4.95 BTH TSP Bobbin 40 88 IDI 13 6.99 P 1 136 TE-HL

+16.92 F/L H/L Tubesheet MAI 1.76 1 56 TTS-HL

-4.67 TTS-HL Bobbin 40 95 ODI 29 0.40 3 118 9TH TSP

+15.01 F/L Bobbin 41 44 NOI 5.25 3 10 TTS-CL

+14.34 F/L Bobbin NOI 4.47 3 8 17TH TSP

+5.15 F/L Bobbin WAR 18 1.14 P 4 0 3AVB

+0.00 F/L Cobbin WAR 19 1.23 P 4 0 4AVB

+0.00 F/L Bobbin WAR 27 2.00 P 4 0 2AVB

+0.00 F/L Cobbin 41 45 WAR 6

0.45 P 4 0 1AVB

+0.00 F/L Bobbin 41 48 WAR 22 1.47 P 4 0 2AVB

+0.00 F/L H/L Tubesheet SAI 1.06 1 14 TTS-HL

+0.20 TTS-HL Bobbin 41 57 WAR 11 0.63 P 4 0 4AVB

+0.00 F/L Bobbin WAR 15 0.91 P 4 0 1AVB

+0.00 F/L Bobbin WAR 17 1.04 P4 0 3AVB

+0.00 F/L

v 9

BWNT TUBAN II (Version 2.1) 09/22/1994 16:06:39 McGuire Nuclear Station - Unit One S/G B 08/94 RFO Bobbin,C/L Special Interest,H/L Special Interest,H/L Tubesheet,U-Bend Page 11 of 12 ATTACHMENT #10 - INDICATIONS OF IMPERFECTIONS INDICATIONS OF IMPERFECTIONS TEST TYPE ROW COL IND %TW VOLTS CHN DEG LOCATION EXTENT 1 Bobbin 41 58 WAR 23 1.67 P 4 0 1AVB

+0.00 F/L Bobbin 41 64 WAR 27 2.14 P4 0 1AVB

+0.00 F/L Bobbin WAR 31 2.74 P4 0 2AVB

+0.00 F/L Bobbin WAR 34 3.34 P 4 0 3AVB

+0.00 F/L Bobbin 41 65 WAR 16 0.97 P 4 0 1AVB

+0.00 F/L Bobbin WAR 23 1.69 P 4 0 3AVB

+0.00 F/L Bobbin WAR 32 3.00 P 4 0 2AVB

+0.00 F/L Bobbin 41 66 WAR 22 1.54 P4 0 1AVB

+0.00 F/L Bobbin 41 68 WAR 7

0 44 P4 0 3AVB

+0.00 F/L Bobbin WAR 14 0.82 P 4 0 1AVB

+0.00 F/L Bobbin 41 70 WAR 10 0.57 P 4 0 2AVB

+0.00 F/L Bobbin WAR 16 1.01 P 4 0 1AVB

+0.00 F/L H/L Tubesheet SAI 0.77 1 16 TTS-HL

+0.08 TTS-HL Bobbin 41 71 WAR 11 0.65 P 4 0 1AVB

+0.00 F/L Bobbin 41 72 WAR 15 0.91 P 4 0 1AVB

+0.00 F/L Bobbin 41 91 IDI 50 2.99 P 1 92 TE-HL

+17.89 F/L H/L Tubesheet SAI 7.31 1 22 TTS-HL

-3.62 TTS-HL Bobbin 42 21 WAR 10 0.62 P 4 0 1AVB

+0.00 F/L Bobbin 42 33 ODI 44 0.44 3 100 6TH TSP

+27.48 F/L H/L Special I VOL 0.40 1 54 6TH TSP

+27.47 6TH TSP Bobbin 42 45 ODI 20 1.27 3 129 13TH TSP

+6.21 F/L Bobbin WAR 4

0.36 P 4 0 1AVB

+0.00 F/L C/L Special I VOL 0.87 1 108 13TH TSP

+6.06 12TH TSP Bobbin 42 47 NOI 3.92 3 10 9TH TSP

+18.72 F/L H/L Tubesheet 42 48 MAI 2.17 1 34 TTS-HL

+0.03 TTS-HL Bobbin 42 51 NOI 0.20 P 1 121 17TH TSP

+0.00 F/L Bobbin 42 54 ODI 1

0.97 3 154 2ND TSP

+31.57 F/L H/L Special I VOL 1.29 1 146 2ND TSP

+31.53 2ND TSP H/L Tubesheet 42 56 SAI 0.59 1 31 TTS-HL

+0.21 TTS-HL H/L Tubesheet 42 57 SAI 1.52 1 31 TTS-HL

-0.07 TTS-HL H/L Tubesheet 42 60 MAI 2.45 1 16 TTS-HL

-0.01 TTS-HL Bobbin 42 64 WAR 26 1.87 P 4 0 1AVB

+0.00 F/L H/L Tubesheet 42 67 SAI 0.27 1 56 TTS-HL

-0.02 TTS-HL i

H/L Tubesheet 42 76 SAI 0.42 1 39 TTS-HL

-0.11 TTS-HL L

Bobbin 42 77 IDI 72 4.84 P 1 70 TE-HL

+14.03 F/L Bobbin 42 89 ODI 20 0.34 P 1 131 16TH TSP

-0.11 F/L Bobbin 43 22 WAR 20 1.35 P 4 0 2AVB

+0.00 F/L Bobbin WAR 24 1.75 P 4 0 1AVB

+0.00 F/L Boboin 43 23 WAR 7

0.43 P 4 0 2AVB

+0.00 F/L Bobbin 43 27 ODI 2

0.52 3 152 3RD TSP

+28.48 F/L H/L Special I VOL 0.61 1 124 3RD TSP

+28.47 3RD TSP H/L Tubesheet 43 37 SAI 1.82 1 24 TTS-HL

-0.01 TTS-HL H/L Special I 43 74 VOL 0.76 1 150 STH TSP

-0.29 STH TSP Bobbin 43 88 IDI 38 3.96 P 1 111 TE-HL

+14.46 F/L Bobbin 43 89 NOI 12.21 P 1 22 TE-HL

+16.75 F/L H/L Tubesheet MAI 3.24 1 26 TTS-HL

-4.73 TTS-HL H/L Tubesheet 44 37 SAI 1.80 1 28 TTS-HL

+0.00 TTS-HL Bobbin 44 43 WAR 17 1.08 P 4 0 1AVB

+0.00 F/L H/L Tubesheet 44 45 MAI 0.30 1 38 TTS-HL

-0.19 TTS-HL Bobbin 44 46 WAR 12 0.68 P 4 0 1AVB

+0.00 F/L Bobbin 44 47 WAR 8

1.58 P 2 0 15TH TSP

+0.00 F/L Bobbin 44 48 WAR 10 0.61 P 4 0 3AVB

+0.00 F/L Bobbin 44 56 NQI 5.79 3 14 19TH TSP

+10.38 F/L Bobbin 44 62 WAR 18 1.12 P 4 0 1AVB

+0.00 F/L Bobbin 44 63 WAR 18 1.13 P 4 0 1AVB

+0.00 F/L Bobbin 44 64 IDI 74 0.64 P1 68 TE-HL

+15.07 F/L Bobbin 44 72 NOI 0.28 3 82 10TH TSP

+2.10 F/L Bobbin NQI 0.30 3 73 10TH TSP

+5.75 F/L Cobbin NQI 0.57 3 90 11TH TSP

+14.97 F/L Cobbin NQI 0.77 3 159 11TH TSP

+21.17 F/L C/L Special I VOL 0.50 1 126 10TH TSP

+2.14 8TH TSP C/L Special I VOL 0.86 1 144 10TH TSP

+5.70 BTH TSP C/L Special I VOL 1.72 1 117 10TH TSP

-0.55 BTH TSP C/L Special I VOL 1.21 1 110 11TH TSP

+20.68 10TH TSP C/L Special I VOL 1.22 1 107 11TH TSP

+14.71 10TH TSP

BWNT TUBAN II (Version 2.1) 09/22/1994 16:06:39 McGuire Nuclear Station - Unit One S/G B 08/94 RFO Bobbin,C/L Special Interest,H/L Special Interest,H/L Tubesheet,U-Bend r

Page 12 of 12 ATTACHMENT #10 - INDICATIONS OF IMPERFECTIONS INDICATIONS OF IMPERFECTIONS TEST TYPE ROW COL IND %TW VOLTS CHN DEG LOCATION EXTENT 1 Bobbin 44 76 ODI 3

1.18 3 150 9TH TSP

+19.55 F/L C/L Special I VOL 0.54 1 89 9TH TSP

+19.11 BTH TSP Bobbin 44 79 NOI 0.28 3 61 19TH TSP

+9.43 F/L C/L Special I VOL 0.19 1 111 19TH TSP

+9.30 18TH TSP Bobbin 44 83 IDI 8

1.59 P 1 144 TE-HL

+9.34 F/L H/L Tubesheet 44 91 SAI 0.50 1 28 TTS-HL

-2.56 TTS-HL bobbin 45 40 WAR 9

0.54 P4 0 1AVB

+0.00 F/L Bobbin 45 75 NQI 0.68 P 1 35 3RD TSP

+0.00 F/L H/L Special I SAI 0.16 1 67 3RD TSP

-0.01 3RD TSP Bobbin 46 28 IDI 97 10.78 P 1 34 TE-HL

+7.78 F/L H/L Tubesheet 47 57 MAI 1.00 1 28 TTS-HL

-4.90 TTS-HL U-Band 48 31 VOL 1.40 1 198 1AVB

+20.04 4AVB Bobbin 48 37 NQI 0.61 P 1 70 IST TSP

+0.05 F/L H/L Special I SAI 0.50 1 46 IST TSP

+0.05 IST TSP Bobbin 48 71 ODI 5

0.43 P 1 143 1ETH TSP

+0.02 F/L Bobbin 48 75 ODI 12 0.35 3 139 3RD TSP

+25.96 F/L Bobbin 48 76 NQI 0.45 P 1 55 IST TSP

+0.02 F/L H/L Special I MAI 0.63 1 167 1ST TSP

+0.11 IST TSP Bobbin 48 85 ODI 22 0.76 3 127 TTS-HL

+5.02 F/L H/L Special I VOL 0.39 1 173 TTS-HL

+4.82 IST TSP Bobbin 49 32 NQI 0.73 3 55 TTS-HL

+23.56 F/L H/L Tubesheet VOL 0.52 1 73 TTS-HL

+0.01 TTS-HL H/L Special I VOL 0.48 1 167 TTS-HL

+23.60 IST TSP Bobbin 49 38 NOI 0.42 3 111 4TH TSP

+29.01 F/L Bobbin NQI 0.43 3 113 4TH TSP

+2.23 F/L Bobbin ODI 9

0.51 3 142 STH TSP

+25.71 F/L Bobbin ODI 11 0.40 3 140 4TH TSP

+37.38 F/L Bobbin ODI 11 0.70 3 140 4TH TSP

+24.82 F/L Bobbin ODI 13 0.87 3 137 3RD TSP

+23.91 F/L H/L Special I VOL 0.22 1 65 4TH TSP

+29.17 STH TSP H/L Special I VOL 0.29 1 91 4TH TSP

+24.91 STH TSP H/L Special I VOL 0.30 1 130 4TH TSP

+37.47 STH TSP H/L Special I VOL 0.45 1 145 4TH TSP

-19.97 STH TSP H/L Special I VOL 0.93 1 7 4TH TSP

+2.16 STH TSP Bobbin 49 40 WAR 10 2.53 P 2 0 17TH TSP

+0.00 F/L Bobbin 49 56 WAR 8

2.06 P 2 0 19TH TSP

-0.34 F/L H/L Tubesheet SAI 1.33 1 15 TTS-HL

-0.05 TTS-HL Bobbin 49 57 ODI 43 0.44 3 100 TTS-HL

+3.58 F/L Bobbin WAR 7

1.34 P2 0 19TH TSP

+0.00 F/L Bobbin WAR 9

1.83 P 2 0 17TH TSP

+0.00 F/L H/L Tubesheet VOL 0.36 1 146 TTS-HL

-0.12 TTS-HL Total Indications Found = 756 Total Tubes Found = 455 l

e BWNT TUBAN II (Version 2.1) 09/22/1994 16:31:50 McGuire Nuclear Station - Unit One S/G C 08/94 RFO Bobbin,C/L Special Interest,H/L Special Interest,H/L Tubesheet,U-Bend Page 1 of 11 ATTACHMENT #11 - INDICATIONS OF IMPERFECTIONS INDICATIONS OF IMPERFECTIONS TEST TYPE ROW COL IND %TW VOLTS CHN DEG LOCATION EXTENT 1 Bobbin 2

8 NQI 1.20 3 138 18TH TSP

+19.65 8TH TSP Bobbin ODI 8

1.36 4 150 1BTH TSP

+10.71 8TH TSP C/L Special I VOL 0.51 1 109 18TH TSP

+10.24 18TH TSP C/L Special I VOL 0.83 1 120 18TH TSP

+19.61 18TH TSP Bobbin 2 14 NOI 1.84 3 149 18TH TSP

+19.22 8TH TSP C/L Special I VOL 0.92 1 118 18TH TSP

+19.11 18TH TSP H/L Tubesheet 2 47 SAI 0.95 1 14 TTS-HL

+0.07 TTS-HL H/L Tubesheet 2 62 dAI 0.72 1 13 TTS-HL

-0.09 TTS-HL U-Bend 2 64 VOL 0.42 1 76 7TH TSP

+2.85 BTH TSP H/L Tubesheet 2 70 SAI 0.40 1 39 TTS-HL

-0.15 TTS-HL Bobbin 2 88 ODI 14 1.09 3 131 15TH TSP

+18.06 BTH TSP C/L Special I VOL 0.90 1 123 15TH TSP

+18.39 15TH TSP H/L Tubesheet 2 93 SAI 0.96 1 24 TTS-HL

+0.09 TTS-HL H/L Tubesheet 2 104 SAI 1.01 1 18 TTS-HL

+0.07 TTS-HL Bobbin 3 40 IDI 6

3.49 P 1 138 TE-CL

+1.03 8TH TSP U-Bsnd 3 80 VOL 0.71 1 149 7TH TSP

+0.05 7TH TSP H/L Tubesheet 3 81 SAI 0.22 1 65 TTS-HL

-0.07 TTS-HL H/L Tubesheet 3 95 SAI 0.84 1 14 TTS-HL

+0.03 TTS-HL Bobbin 4

4 NOI 1.13 3 39 11TH TSP

+28.62 8TH TSP C/L Special I VOL 0.38 1 96 11TH TSP

+28.82 11TH TSP Bobbin 4 11 ODI 9

C.57 3 135 9TH TSP

+2.22 BTH TSP C/L Special I VOL 1.22 1 160 9TH TSP

+1.86 9TH TSP Bobbin 4 18 NQI 0.97 P 1 104 IST TSP

-0.04 BTH TSP U-B:nd 4 31 VOL 1.25 1 71 8TH TSP

+7.13 7TH TSP Bobbin 4 54 IDI 35 10.29 P 1 13 TE-HL

+8.18 9TH TSP H/L Tubesheet 4 84 SAI 0.51 1 37 TTS-HL

-0.05 TTS-HL Bobbin 4

87 NQI 7.31 3 17 7TH TSP

+6.01 9TH TSP H/L Tubesheet 4

98 SAI 0.45 1 30 TTS-HL

-0.16 TTS-HL H/L Tubesheet 4 111 SAI 0.55 1 25 TTS-HL

-1.00 TTS-HL Bobbin 5 48 ODI 19 0.33 3 128 9TH TSP

+9.14 BTH TSP H/L Tubenheet 5 53 SAI 1.03 1 19 TTS-HL

+0.07 TTS-HL Bobbin 5 56 IDI 39 11.60 P 1 22 TE-HL

+16.07 BTH TSP Bobbin 5 61 ODI 26 1.11 3 123 10TH TSP

+24.81 BTH TSP C/L Special I VOL 0.90 1 50 10TH TSP

+24.75 10TH TSP Bobbin 5 94 IDI 61 17.88 P 1 23 TE-HL

+6.07 STH TSP H/L Tubesheet 5 108 SAI 0.33 1 73 TTS-HL

-0.03 TTS-HL Bobbin 6

8 NOI 1.17 3 141 16TH TSP

+2.23 F/L Bobbin ODI 1

1.44 3 141 STH TSP

+23.34 F/L Bobbin ODI 5

1.80 3 138 4TH TSP

+15.42 F/L Bobbin ODI 11 1.38 3 134 2ND TSP

+33.00 F/L Bobbin ODI 12 1.27 3 133 9TH TSP

+17.01 F/L H/L Special I VOL 0.42 1 101 6TH TSP

-20.21 6TH TSP H/L Special I VOL 0.82 1 31 4TH TSP

+14.74 4TH TSP C/L Special I VOL 0.73 1 150 STH TSP

+17.28 9TH TSP C/L Special I VOL 0.68 1 116 16TH TSP

+2.40 16TH TSP Bobbin 6 35 NQI 0.26 3 112 15TH TSP

-1.25 F/L Bobbin 6 64 IDI 60 10.68 P 1 24 TE-HL

+11.57 F/L H/L Tubesheet SAI 0.43 1 30 TTS-HL

+0.03 TTS-HL H/L Tubesheet 6 72 SAI 0.49 1 34 TTS-HL

+0.03 TTS-HL H/L Tubesheet 6 74 SAI 0.39 1 45 TTS-ITL

+0.05 TTS-HL H/L Tubesheet 6 76 SAI 0.68 1 26 TTS-HL

+0.00 TTS-HL Bobbin 6 78 NOI 0.34 P 1 105 2ND TSP

+0.02 F/L Bobbin 6 101 IDI 63 12.53 P 1 25 TE-HL

+18.28 F/L H/L Tubesheet MAI 1.13 1 33 TTS-HL

-3.16 TTS-HL H/L Tubesheet SAI 1.24 P2 19 TTS-HL

-0.04 TTS-HL Bobbin 6 104 NQI 0.72 3 92 11TH TSP

+5.68 F/L C/L Special I VOL 0.97 1 94 11TH TSP

+5.87 11TH TSP Bobbin 6 112 ODI 17 0.66 3 129 12TH TSP

+13.06 F/L H/L Tubesheet SAI 0.27 1 96 TTS-HL

+0.00 TTS-HL C/L Special I VOL 0.43 1 111 12TH TSP

+12.87 12TH TSP H/L Tubesheet 7 38 SAI 1.05 1 13 TTS-HL

+0.02 TTS-HL H/L Tubesheet 7 51 MAI 1.38 1 3 TTS-HL

+0.09 TTS-HL Bobbin 7 65 NOI 0.58 3 89 9TH TSP

+24.07 F/L C/L Special I SAI 0.40 1 46 9TH TSP

+24.14 9TH TSP Bobbin 7 68 NQI 0.42 3 38 9TH TSP

+10.48 F/L

BWNT TUBAN II (Version 2.1) 09/22/1994 16:31:50 McGuire Nuclear Station - Unit One S/G C 08/94 RFO Bobbin,C/L Special Interest,H/L Special Interest,H/L Tubesheet,U-Bend Page 2 of 11 ATTACHMENT #11 - INDICATIONS OF IMPERFECTIONS INDICATIONS OF IMPERFECTIONS TEST TYPE ROW COL IND %TW VOLTS CHN DEG LOCATION EXTENT 1 Bobbin NQI 2.59 3 18 13TH TSP

+3.17 F/L Bobbin 7 75 ADI 2.80 6 95 IST TSP

+9.89 F/L Bobbin 7 94 IDI 46 12.91 P 1 16 TE-HL

+13.36 F/L Bobbin IDI 83 10.30 P 1 69 TE-HL

+15.10 F/L Bobbin 7 96 NOI 0.43 P 1 66 2ND TSP

+0.13 F/L Bobbin NOI 0.61 P 1 52 STH TSP

-0.31 F/L H/L Special I SAI 0.27 1 66 5TH TSP

-0.08 STH TSP Bobbin 8 21 NQI 0.83 3 133 11TH TSP

+10.68 F/L C/L Special I VOL 0.51 1 112 11TH TSP

+11.66 11TH TSP Bobbin 8 22 ADI 4.65 6 79 12TH TSP

+15.57 F/L Bobbin ODI 11 3.35 6 85 11TH TSP

+8.19 F/L C/L Special I VOL 0.28 1 129 11TH TSP

+11.50 11TH TSP C/L Special I VOL 0.47 1 153 11TH TSP

+8.73 11TH TSP C/L Special I VOL 0.90 1 95 11TH TSP

-7.09 11TH TSP H/L Tubesheet 8 48 SAI 0.87 1 161 TTS-HL

-0.11 TTS-HL Bobbin 8 85 ADI 3.43 6 96 19TH TSP

+2.59 F/L Bobbin 8 105 ODI 21 0.36 3 127 11TH TSP

+24.35 F/L Bobbin IDI 41 14.41 P 1 16 TE-HL

+6.56 F/L C/L Special I VOL 0.26 1 61 11TH TSP

+23.86 11TH TSP Bobbin 8 106 NQI 5.68 3 14 17TH TSP

+6.32 F/L Bobbin 9 10 ADI 2.77 6 88 3RD TSP

+25.22 F/L H/L Special I VOL 0.79 1 161 4TH TSP

-18.42 4TH TSP Bobbin 9 16 ODI 10 1.23 4 145 10TH TSP

+24.19 F/L Bobbin ODI 29 0.48 3 121 10TH TSP

+28.69 F/L C/L Special I VOL 0.29 1 106 10TH TSP

+23.35 10TH TSP C/L Special I VOL 0.29 1 115 10TH TSP

+29.30 10TH TSP C/L Special I VOL 0.34 1 138 10TH TSP

+30.67 10TH TSP C/L Special I VOL 0.35 1 61 10TH TSP

+21.38 10TH TSP C/L Special I VOL 0.77 1 17 10TH TSP

+24.33 10TH TSP C/L Special I VOL 0.92 1 42 10TH TSP

+25.98 10TH TSP Bobbin 9 20 ODI 21 0.79 3 127 12TH TSP

+19.62 F/L C/L Special I VOL 0.64 1 109 11TH TSP

-2.40 11TH TSP Bobbin 9 31 ODI 3

2.26 4 142 2ND TSP

+15.97 F/L Bobbin IDI 41 1.17 P 1 103 TE-HL

+1.56 F/L H/L Special I VOL 0.81 1 110 2ND TSP

+15.93 2ND TSP Bobbin 9 42 ADI 2.73 6 82 TTS-HL

+6.66 F/L H/L Special I VOL 0.45 1 109 TTS-HL

+4.06 TTS-HL Bobbin 9 73 NQI 0.77 3 112 2ND TSP

+5.58 F/L H/L Special I VOL 0.96 1 117 2ND TSP

+5.56 2ND TSP Bobbin 9 77 ODI 11 1.50 3 134 10TH TSP

+34.60 F/L Bobbin ODI 16 0.51 3 130 10TH TSP

+33.63 F/L C/L Special I VOL 0.81 1 91 9TH TSP

-8.13 9TH TSP C/L Special I VOL 1.36 1 109 9TH TSP

-9.59 9TH TSP Bobbin 9 99 IDI 76 11.70 P 1 25 TE-HL

+5.79 F/L Bobbin 9 109 NOI 0.58 P 1 62 IST TSP

+0.05 F/L U-Brnd 10 4 VOL 0.94 1 135 7TH TSP

-15.16 7TH TSP H/L Tubesheet 10 31 SAI 0.48 1 19 TTS-HL

-1.11 TTS-HL Bobbin 10 53 ODI 30 0.22 3 120 3RD TSP

+21.70 F/L Bobbin 10 71 ADI 4.59 6 92 IST TSP

+21.61 F/L Bobbin 10 76 NOI 0.62 P 1 83 2ND TSP

+0.19 F/L H/L Special I SAI 0.45 1 72 2ND TSP

+0.19 2ND TSP Bobbin 10 78 ADI 2.82 6 80 6TH TSP

+15.40 F/L Bobbin ODI 30 0.53 3 119 4TH TSP

+5.09 F/L H/L Special I VOL 0.48 1 155 6TH TSP

+17.03 6TH TSP H/L Special I VOL 0.66 1 146 4TH TSP

+5.29 4TH TSP Bobbin 10 95 NOI 1.37 3 155 2ND TSP

+26.51 F/L H/L Special I VOL 0.99 1 106 3RD TSP

-18.27 3RD TSP H/L Tubesheet 10 113 SAI 0.51 1 17 TTS-HL

+0.22 TTS-HL Bobbin 11 8 ODI 5

1.45 4 141 15TH TSP

+7.02 F/L C/L Special I VOL 0.35 1 103 14TH TSP

-4.99 14TH TSP Bobbin 11 13 ODI 5

2.18 4 141 10TH TSP

+41.77 F/L C/L Special I VOL 0.26 1 90 9TH TSP

-2.4B 9TH TSP H/L Tubenheet 11 47 SAI 1.59 1 17 TTS-HL

-0.03 TTS-HL H/L Tubesheet 1.1 56 MAI 0.30 1 51 TTS-HL

-0.03 TTS-HL Bobbin 11 61 NOI 0.77 P1 83 IST TSP

-0.06 F/L l

1

- 1

c~

ce******

BWNT TUBAN II (Version 2.1) 09/22/1994 16:31:50 McGuire Nuclear Station - Unit One S/G C

  • ee*****

08/94 RFO Bobbin,C/L Special Interest,H/L Special Interest,H/L Tubesheet,U-Bend Page 3 of 11 ATTACHMENT #11 - INDICATIONS OF IMPERFECTIONS INDICATIONS OF IMPERFECTIONS TEST TYPE ROW COL IND %TW VOLTS CHN DEG LOCATION EXTENT 1 H/L Special I MAI 0.60 1 80 IST TSP

-0.11 IST TSP Bobbin 11 63 ODI 17 1.78 4 138 9TH TSP

+17.22 F/L C/L Special I VOL 0.85 1 21 9TH TSP

+17.17 9TH TSP Bobbin 11 66 NQI 0.50 P 1 55 IST TSP

-0.02 F/L H/L Special I 11 73 VOL 1.21 1 30 IST TSP

+15.38 1ST TSP H/L Tubesheet 11 89 SAI 0.41 1 66 TTS-HL

-0.09 TTS-HL Bobbin 11 97 ODI B

1.09 3 138 12TH TSP

+19.14 F/L C/L Special I VOL 0.63 1 105 11TH TSP

-2.75 11TH TSP Bobbin 11 111 ODI 14 2.31 3 134 14TH TSP

+1.91 F/L C/L Special I VOL 0.80 1 99 14TH TSP

+1.88 14TH TSP Bobbin 12 9 NOI 0.44 3 120 12TH TSP

+10.15 F/L C/L Special I VOL 0.39 1 131 11TH TSP

-12.94 11TH TSP Bobbin 12 16 NQI 0.23 P 1 111 17TH TSP

-0.07 F/L Bobbin 12 39 ODI 16 1.05 3 131 17TH TSP

+15.43 F/L C/L Special I VOL 1.02 1 91 16TH TSP

-7.30 16TH TSP Bobbin 12 60 NQI 0.73 P 1 63 2ND TSP

+0.04 F/L H/L Special I SAI 0.89 1 49 2ND TSP

-0.03 2ND TSP Bobbin 12 76 ODI 5

0.70 3 140 6TH TSP

+11.56 F/L H/L Special I VOL 0.50 1 65 6TH TSP

+5.58 GTH TSP H/L Special I VOL 0.81 1 124 6TH TSP

+11.27 6TH TSP Bobbin 12 97 NQI 0.84 P1 73 3RD TSP

+0.06 F/L H/L Special I SAI 0.81 1 19 3PD TSP

-0.01 3RD TSP Bobbin 13 3 ADI 2.69 6 86 10TH TSP

+19.46 F/L Cobbin ADI 3.59 6 60 10TH TSP

+22.40 F/L C/L Special I VOL 0.77 1 67 10TH TSP

+23.65 10TH TSP C/L Special I VOL 0.94 1 50 10TH TSP

+20.51 10TH TSP Bobbin 13 39 ADI 2.37 6 71 2ND TSP

+14.17 F/L H/L Special I VOL O.71 1 146 2ND TSP

+14.90 2ND TSP Bobbin 13 41 NOI 0.41 P 1 67 IST TSP

+0.10 F/L H/L Special I SAI 0.38 1 75 IST TSP

-0.02 IST TSP Bobbin 13 47 NOI 3.62 P 2 148 TE-HL

+15.04 F/L Bobbin 13 52 ODI 28 0.35 3 121 3RD TSP

+9.73 F/L robbin 13 56 ODI 69 1.05 P 1 81 3RD TSP

-0.39 F/L H/L Special I SAI 0.96 1 52 3RD TSP

+0.00 3RD TSP Bobbin 13 76 NQI 0.64 P 1 63 4TH TSP

-0.02 F/L H/L Tuhsheet 13 95 SAI 0.57 1 35 TTS-HL

-0.06 TTS-HL robbin 13 105 NOI 0.66 P 1 66 2ND TSP

-0.09 F/L H/L Special I SAI 0.22 1 112 2ND TSP

-0.17 2ND TSP Cobbin 14 20 NOI 1.31 3 43 7TH TSP

+3.90 F/L Cobbin 14 53 ADI 2.39 6 93 11TH TSP

+7.33 F/L C/L Special I VOL 0.46 1 128 11TH TSP

+7.49 11TH TSP H/L Tubesheet 14 59 SCI 0.35 1 77 TTS-HL

-0.09 TTS-HL H/L Tubesheet 14 60 MAI 0.43 1 64 TTS-HL

-2.13 TTS-HL Bobbin 14 61 IDI 82 16.70 P 1 27 TE-HL

+6.23 F/L H/L Tubesheet 14 65 SCI 0.35 1 67 TTS-HL

-0.05 TTS-HL Bobbin 14 69 IDI 79 13.77 P 1 26 TE-HL

+7.51 F/L H/L Tubesheet 14 77 MAI 0.58 1 39 TTS-HL

-0.13 TTS-HL i

Cobbin 14 98 IDI 54 9.92 P 1 14 TE-HL

+14.01 F/L Bobbin 14 106 ODI 6

1.85 4 145 3RD TSP

+11.03 F/L H/L Special I VOL 0.32 1 72 3RD TSP

+10.70 3RD TSP Bobbin 15 4 ADI 5.59 6 93 9TH TSP

+10.64 F/L 1

C/L Special I VOL 0.59 1 51 9TH TSP

+9.27 9TH TSP l

C/L Special I VOL 0.69 1 94 9TH TSP

+10.91 9TH TSP Bobbin 15 6 ODI 28 0.17 P 1 126 11TH TSP

-0.05 F/L l

Bobbin 15 11 NOI 0.90 3 104 12TH TSP

+7.41 F/L C/L Special I VOL 1.10 1 105 12TH TSP

+7.74 12TH TSP Bobbin 15 15 ODI 30 0.46 3 120 9TH TSP

+8.26 F/L i

C/L Special I VOL 0.97 1 163 9TH TSP

+0.69 9TH TSP Bobbin 15 20 ODI 17 1.27 4 150 GTH TSP

+25.76 F/L H/L Special I VOL 0.24 1 94 7TH TSP

-20.08 7TH TSP Cobbin 15 22 ODI 6

2.17 4 163 TTS-CL

+2.69 F/L Bobbin ODI 10 0.73 3 137 18TH TSP

+3.01 F/L Bobbin ODI 17 0.48 3 131 13TH TSP

+6.15 F/L C/L Special I VOL 0.67 1 131 TTS-CL

+2.66 TTS-CL C/L Special I VOL 0.48 1 128 18TH TSP

+3.51 18TH TSP

4 BWNT TUBAN II (Version 2.1) 09/22/1994 16:31:50 McGuire Nuclear Station - Unit One S/G C

  • ee*****

08/94 RPO Bobbin,C/L Special Interest,H/L Special Interest,H/L Tubesheet,U-Bend Page 4 of 11 ATTACHMENT #11 - INDICATIONS OF IMPERFECTIONS INDICATIONS OF IMPERFECTIONS TEST TYPE ROW COL IND %TW VOLTS CHN DEG IOCATION EXTENT 1 C/L Special I VOL 0.55 1 86 13TH TSP

+7.33 13TH TSP Bobbin 15 26 NQI 0.24 3 93 IST TSP

+17.40 F/L Bobbin 15 38 NQI 0.52 3 109 TTS-CL

+16.55 F/L Bobbin NOI 0.41 3 102 3RD TSP

+35.97 F/L Bobbin ODI 5

0.98 3 140 TTS-CL v7.47 F/L H/L Special I VOL 1.56 1 149 4TH TSP

-9.08 4TH TSP Bobbin 15 48 ADI 6.26 6 71 14TH TSP

+3.78 F/L C/L Special I VOL 0.63 1 112 14TH TSP

+4.36 14TH TSP Bobbin 15 75 NQI 1.40 P 1 21 IST TSP

+0.06 F/L H/L Special I SAI 0.21 1 94 IST TSP

+0.08 IST TSP Bobbin 15 108 NQI 0.23 P 1 83 2ND TSP

+0.16 F/L H/L Special I SAI 0.25 1 57 2ND TSP

+0.07 2ND TSP H/L Tubesneet 15 109 MAI 0.34 1 35 TTS-HL

-0.14 TTS-HL Bobbin 16 7 NOI 0.40 3 88 10TH TSP

+4.78 F/L C/L Special I VOL 1.12 1 164 10TH TSP

+5.05 10TH TSP Bobbin 16 11 NOI 0.36 3 108 11TH TSP

+38.06 F/L C/L Special I VOL 1.29 1 169 10TH TSP

-6.27 10TH TSP Bobbin 16 13 ODI 20 0.59 3 128 11TH TSP

+24.12 F/L C/L Special I VOL 0.63 1 115 11TH TSP

+23.85 11TH TSP Bobbin 16 33 ODI 24 1.26 3 126 10TH TSP 429.18 F/L C/L Special I VOL 0.77 1 149 10TH TSP

+28.49 10TH TSP Bobbin 16 56 NOI 1.00 3 51 18TH TSP

+4.78 F/L C/L Special I VOL 0.28 1 92 18TH TSP

+5.62 17TH TSP H/L Tubesheet 16 59 SCI 0.58 1 27 TTS-HL

-0.42 TTS-HL H/L Tubesheet 16 62 SAI 0.59 1 14 TTS-HL

-0.08 TTS-HL Bobbin 16 65 NOI 0.19 P 1 107 4TH TSP

-0.16 F/L H/L Special I SAI 0.22 1 75 4TH TSP

+0.16 4TH TSP Bobbin 16 105 NOI 2.26 P 1 27 3RD TSP

+0.00 F/L Bobbin 17 8 NOI 0.89 3 135 10TH TSP

+9.29 F/L C/L Special I VOL 1.04 1 39 10TH TSP

+10.03 10TH TSP Bobbin 17 10 NQI 0.63 3 97 11TH TSP

+15.32 F/L C/L Special I VOL 0.76 1 106 11TH TSP

+16.13 11TH TSP Bobbin 17 13 NOI 8.41 3 15 TTS-CL

+16.15 F/L Bobbin NQI 0.27 P 1 129 17TH TSP

-0.05 F/L Bobbin 17 21 NOI 0.73 3 138 9TH TSP

+25.74 F/L C/L Special I VOL 1.21 1 105 9TH TSP

+27.23 9TH TSP H/L Tubesheet 17 30 SAI 0.75 1 24 TTS-HL

-2.73 TTS-HL Bobbin 17 34 NOI 0.34 P 1 122 16TH TSP

-0.81 F/L C/L Special I VOL 0.55 1 104 16TH TSP

-0.72 16TH TSP Bobbin 17 55 NOI 1.93 P 1 134 TE-HL

+12.53 F/L Bobbin 17 61 IDI 74 7.16 P 1 79 TE-HL

+13.66 F/L Bobbin IDI 80 8.57 P 1 28 TE-HL

+14.08 F/L H/L Tubesheet 17 67 SAI 0.43 1 61 TTS-HL

+0.04 TTS-HL H/L Tubesheet 17 69 MAI 1.43 1 34 TTS-HL

-1.48 TTS-HL Bobbin 17 72 NOI 0.84 3 99 9TH TSP

+26.96 F/L C/L Special I VOL 0.83 1 110 9TH TSP

+26.95 9TH TSP Bobbin 17 73 NQI 0.36 P 1 138 6TH TSP

+0.00 F/L H/L Special I 17 85 VOL 0.75 1 162 STH TSP

+0.14 STH TSP Bobbin 17 87 ODI 10 1 15 3 135 3RD TSP

+1.46 F/L H/L Special I VOL 1.46 1 153 3RD TSP

+1.47 3RD TSP Bobbin 17 88 NQI 1.17 P 1 165 BTH TSP

+3.48 F/L U-Bend VOL 1.06 1 129 BTH TSP

+4.28 BTH TSP Bobbin 17 95 NOI 0.47 3 76 2ND TSP

+30.13 F/L Bobbin NQI 0.47 3 128 3RD TSP

+27.53 F/L Bobbin NQI 0.60 3 86 3RD TSP

+20.47 F/L Bobbin NQI 0.63 3 129 3RD TSP

+23.76 F/L Bobbin 17 111 ADI 9.11 6 68 GTH TSP

+37.68 F/L H/L Special I VOL 0.98 1 143 7TH TSP

-9.18 7TH TSP H/L Special I VOL 1.29 1 126 7TH TSP

-6.14 7TH TSP robbin 18 13 ODI 17 0.32 P 1 132 17TH TSP

-0.02 F/L Bobbin 18 27 NOI 1.06 3 132 6TH TSP

+32.38 F/L Bobbin NQI 0.49 P 1 156 17TH TSP

+0.00 F/L H/L Special I VOL 1.42 1 124 7TH TSP

-11.82 7TH TSP Bobbin 18 50 NQI 0.31 P 1 80 2ND TSP 40.12 F/L H/L Special I SAI 0.32 1 148 2ND TSP

+0.06 2ND TSP

BWNT TUBAN II (Version 2.1) 09/22/1994 16:31:50 McGuire Nuclear Station - Unit One S/G C 08/94 RFO Bobbin,C/L Special Interest,H/L Special Interest,H/L Tubesheet,U-Bend ATTACHMENT #11 - INDICATIONS OF IMPERFECTIONS INDICATIONS OF IMPERFECTIONS TEST TYPE ROW COL IND %TW VOLTS CHN DEG LOCATION EXTENT 1 Bobbin 18 77 NQI 0.48 3 60 2ND TSP

+11.81 F/L Bobbin ADI 6.26 6 76 10TH TSP

+17.44 F/L C/L Special I VOL 1.36 1 80 10TH TSP

+17.44 10TH TSP Bobbin 18 78 ADI 2.09 6 75 10TH TSP

+32.97 F/L C/L Special I VOL 0.63 1 103 9TH TSP

-11.94 9TH TSP Bobbin 18 92 NOI 0.77 3 61 3RD TSP

+9.25 F/L H/L Special I VOL 0.49 1 114 3RD TSP

+9.19 3RD TSP H/L Tubesheet 18 99 VOL 0.56 1 46 TTS-HL

-1.20 TTS-HL H/L Tubesheet 19 33 SAI 1.19 1 23 TTS-HL

-0.04 TTS-HL Bobbin 19 46 ODI 17 0.59 3 131 10TH TSP

+15.99 F/L l

Bobbin ODI 24 0.60 3 126 10TH TSP

+18.28 F/L C/L Special I VOL 0.55 1 74 10TH TSP

+16.79 10TH TSP l

C/L Special I VOL 0.68 1 34 10TH TSP

+19.14 10TH TSP j

Bobbin 19 53 NOI 0.34 P1 94 2ND TSP

+0.00 F/L Bobbin 19 63 NQI 0.51 3 102 TTS-HL

+24.16 F/L H/L Special I VOL 0.69 1 109 TTS-HL

+23.89 IST TSP Bobbin 19 66 NOI 1.56 P 1 155 TE-HL

+14.63 F/L i

Bobbin 19 86 NQI 0.31 3 79 6TH TSP

+1.78 F/L Bobbin ODI 7

0.65 3 136 6TH TSP

+3.69 F/L l

Bobbin ODI 24 0.34 3 124 STH TSP

+22.31 F/L l

Bobbin 19 95 NOI 1.42 3 41 10TH TSP

+13.92 F/L l

C/L Special I VOL 0.77 1 59 10TH TSP

+13.75 10TH TSP Bobbin 20 23 WAR 10 0.45 P 4 0 4AVB

+0.00 F/L Bobbin 20 34 NOI 3.62 3 20 3AVB

-11.79 F/L U-B:nd VOL 1.31 1 157 3AVB

-11.65 8TH TSP Bobbin 20 64 IDI 42 15.34 P 1 13 TE-HL

+8.43 F/L Bobbin 20 81 ADI 3.11 6 73 2ND TSP

+13.20 F/L H/L Special I VOL 0.27 1 95 2ND TSP

+14.83 2ND TSP C/L Special I NQI O.42 1 70 10TH TSP

+12.47 10TH TSP i

Bobbin 21 7 NQI 0.46 3 139 6TH TSP

+4.98 F/L H/L Special I VOL 0.28 1 96 6TH TSP

+4.84 6TH TSP Bobbin 21 8 ODI 26 1.30 4 134 12TH TSP

+19.61 F/L C/L Special I VOL 0.41 1 61 12TH TSP

+20.22 11TH TSP Bobbin 21 23 WAR 4

0.36 P 4 0 1AVB

+0.00 F/L Bobbin 21 27 WAR 11 0.59 P 4 0 2AVB

+0.00 F/L Bobbin 21 34 ODI 9

2.31 4 145 9TH TSP

+10.88 F/L C/L Special I VOL 0.65 1 21 STH TSP

+16.57 9TH TSP C/L Special I VOL 1.08 1 31 9TH TSP

+11.37 9TH TSP Bobbin 21 43 ODI 13 1.83 4 142 12TH TSP

+11.21 F/L C/L Special I VOL 0.60 1 99 12TH TSP

+11.09 12TH TSP l

H/L Tubesheet 21 48 SAI 0.96 1 19 TTS-HL

+0.14 TTS-HL Bobbin 22 9 NOI 0.43 3 112 STH TSP

+40.63 F/L Bobbin ODI 4

0.65 3 138 TTS-CL

+26.57 F/L H/L Special I VOL 1.23 1 116 6TH TSP

-3.45 6TH TSP C/L Special I VOL 0.53 1 82 20TH TSP

-2.93 20TH TSP C/L Special I VOL 0.79 1 125 20TH TSP

-4.50 20TH TSP Bobbin 22 11 ADI 6.40 6 83 11TH TSP

+26.06 F/L C/L Special I VOL 0.38 1 30 11TH TSP

+25.79 11TH TSP Bobbin 22 18 ODI 23 0.83 3 124 2ND TSP

+19.59 F/L H/L Special I VOL 0.33 1 43 3RD TSP

-25.79 3RD TSP Bobbin 22 19 IDI 95 5.83 P 1 45 TE-HL

+10.14 F/L Bobbin 22 43 ODI 13 2.67 4 142 3RD TSP

+33.85 F/L H/L Special I VOL 0.52 1 124 4TH TSP

-10.81 4TH TSP H/L Tubesheet 22 55 SAI 0.59 1 28 TTS-HL

+0.03 TTS-HL Bobbin 22 56 NOI 0.24 P 1 103 2ND TSP

+0.05 F/L H/L Tubesheet 22 83 MAI 0.53 1 14 TTS-HL

+0.07 TTS-HL H/L Special I 22 88 VOL 0.04 1 114 6TH TSP

-19.07 6TH TSP H/L Special I VOL 1.22 1 124 6TH TSP

-27.29 6TH TSP Bobbin 22 102 ADI 3.44 6 92 19TH TSP

+3.19 F/L C/L Special I VOL 0.54 1 150 19TH TSP

+2.91 19TH TSP Bobbin 23 15 ODI 1

0.87 3 140 16TH TSP

+5.06 F/L C/L Special I VOL 0.50 1 75 16TH TSP

+4.46 16TH TSP C/L Special I VOL 0.51 1 100 16TH TSP

+5.09 16TH TSP Bobbin 23 67 ADI 3.02 6 89 6TH TSP

+17.80 F/L H/L Special I VOL 0.45 1 139 6TH TSI'

+18.19 6TH TSP

(

v i

BWNT TUBAN II (Version 2.1) 09/22/1994 16:31:50 l

McGuire Nuclear Station - Unit One j

S/G C 08/94 RFO Bobbin,C/L Special Interest,H/L Special Interest,H/L Tubesheet,U-Bend

[

t Page 6 of 11 ATTACHMENT #11 - INDICATIONS OF IMPERFECTIONS s

INDICATIONS OF IMPERFECTIONS TEST TYPE ROW COL IND %TW VOLTS CHN DEG LOCATION EXTENT 1

[

Bobbin 23 68 IDI 74 6.94 P 1 26 TE-HL

+18.07 F/L H/L Tubesheet 23 83 SAI 0.79 1 24 TTS-HL

+0.09 TTS-HL t

H/L Tubesheet 23 92 SAI 1.09 1 28 TTS-HL

+0.13 TTS-HL i

Bobbin 23 104 ODI 34 0.68 P 1 108 IST TSP

+0.51 F/L H/L Special I VOL 0.69 1 80 1ST TSP

+0.36 IST TSP e

Cobbin 23 106 ODI 25 0.56 3 123 9TH TSP

+36.68 F/L C/L Special I VOL 0.60 1 23 8TH TSP

-7.37 8TH TSP H/L Tubenheet 24 9 NOI 0.79 1 112 TTS-HL

+0.02 TTS-HL Bobbin 24 16 WAR 21 1.00 P 4 0 2AVB

+0.00 F/L Bobbin 24 27 ADI 3.49 6 75 4TH TSP

+26.62 F/L i

H/L Special I VOL 0.13 1 116 STH TSP

-20.38 to

-19.19 STH TSP Bobbin 24 82 IDI 57 8.46 P 1 20 TE-HL

+3.35 F/L Cobbin 24 91 NQI 1.26 3 46 9TH TSP

+19.64 F/L C/L Special I VOL 0.90 1 115 9TH TSP

+20.16 9TH TSP Bobbin 25 7 NQI 3.36 P 1 147 TE-HL

+11.11 F/L Bobbin 25 10 NOI 4.66 3 13 2AVB

+3.53 F/L Cobbin 25 37 ADI 5.49 6 78 3AV3

-4.42 F/L U-Eand VOL 0.91 1 46 3AVB

-4.55 3AVB H/L Tubesheet 25 59 SAI 1.51 1 14 TTS-HL

+0.04 TTS-HL H/L Tubesheet 25 72 SAI 1.03 1 195 TTS-HL

+0.13 TTS-HL H/L Tubesheet 25 74 SAI 1.70 1 25 TTS-HL

+0.09 TTS-HL i

Bobbin 26 14 ODI 12 1.19 3 132 TTS-CL

+15.41 F/L C/L Special I VOL 0.71 1 59 TTS-CL

+14.52

.TTS-CL Bobbin 26 29 NOI 0.52 P 1 110 2ND TSP

+0.10 F/L l

Bobbin 26 69 ADI 4.72 6 65 2ND TSP

+20.58 F/L Bobbin 26 71 ADI 2.18 6 71 6TH TSP

+10.63 F/L Cobbin 26 83 ODI 17 0.51 3 131 2ND TSP

+2.53 F/L Bobbin ODI 29 0.72 3 122 2ND TSP

+3.03 F/L i

H/L Special I VOL 0.32 1 93 2ND TSP

+2.50 2ND TSP H/L Special I VOL 0.65 1 92 2ND TSP

+3.01 2ND TSP Cobbin 27 8 WAR 19 0.86 P 4 0 3AVB

+0.00 F/L Bobbin 27 9 WAR 16 0.69 P 4 0 1AVB

+0.00 F/L Cobbin 27 21 ODI 12 0.20 3 138 TTS-CL

+22.08 F/L tobbin ODI 1

0.54 3 139 2ND TSP

+21.50 F/L

~ Bobbin 27 31 NQI 1.58 P 1 58 TE-HL

+19.56 F/L Bobbin WAR 24 1.49 P 4 0 3AVB

+0.00 F/L i

Bobbin 27 32 WAR 17 0.71 P 4 0 1AVB

+0.00 F/L 1

Bobbin WAR 24 1.27 P 4 0 4AVB

+0.00 F/L 1

Robbin 27 51 ODI 35 0.82 3 114 12TH TSP

+17.60 F/L i

C/L Special I VOL 0.59 1 59 11TH TSP

-4.78 11TH TSP l

Eobbin 27 56 ADI 9.55 6 46 17TH TSP

+10.48 F/L C/L Special I VOL 0.59 1 80 17TH TSP

+9.67 17TH TSP i

Bobbin 27 58 ADI 9.50 6 86 12TH TSP

+15.55 F/L C/L Special I VOL 0.69 1 120 11TH TSP

-7.02 11TH TSP Bobbin 27 69 ADI 4.36 6 90 2ND TSP

+39.83 F/L Bobbin ODI 4

0.71 3 142 2ND TSP

+36.42 F/L Bobbin 27 81 ODI 19 0.99 3 130 4TH TSP

+38.84 F/L H/L Special I VOL 0.46 1 134 STH TSP

-4.70 STH TSP-Bobbin 28 25 NQI 3.00 P 1 159 TE-HL

+11.43 F/L i

Kobbin 28 37 WAR 22 1.36 P 4 0 4AVB

+0.00 F/L i

Bobbin 28 43 WAR 15 0.79 P 4 0 2AVB

+0.00 F/L l

H/L Tubesheet 28 51 SAI 0.51 1 116 TTS-HL

+0.02 TTS-HL Cobbin 28 73 ADI 4.81 6 62 9TH TSP

+36.60 F/L

~

C/L Special I VOL 0.75 1 113 BTH TSP

-7.73 BTH TSP Bobbin 29 14 NOI 0.35 3 118 TTS-CL

+16.84 F/L l

C/L Special I VOL 1.16 1 164 TTS-CL

+17.20 TTS-CL H/L Tubesheet 29 67 SAI 1.00 1 30 TTS-HL

-0.06 TTS-HL Bobbin 29 105 WAR 21 1.25 P 4 0 3AVB

+0.00 F/L Bobbin 30 42 NOI 0.36 3 37 10TH TSP

+7.97 F/L C/L Special I VOL 0.24 1 95 10TH TSP

+8.35 10TH TSP Bobbin 30 51 WAR 15 0.67 P 4 0 1AVB

+0.00 F/L Bobbin 30 52 WAR 15 0.70 P 4 0 1AVB

+0.00 F/L Eobbin 30 53 WAR 19 0.96 P 4 0 1AVB

+0.00 F/L Bobbin 30 58 ODI 8

1.76 3 137 11TH TSP

+37.21 F/L i

C/L Special I VOL 1.74 1 121 10TH TSP

-6.79 10TH TSP i

e h

BWNT TUBAN II (Version 2.1) 09/22/1994 16:31:50 McGuire Nuclear Station - Unit One S/G C 08/94 RFO Bobbin,C/L Special Interest,H/L Special Interest,H/L Tubesheet,U-Bend Page 7 of 11 ATTACHMENT #11 - INDICATIONS OF IMPERFECTIONS INDICATIONS OF IMPERFECTIONS TEST TYPE ROW COL IND %TW VOLTS CHN DEG LOCATION EXTENT 1 H/L Tubesheet 30 72 SCI 0.33 1 24 TTS-HL

+0.12 TTS-HL H/L Tubesheet 30 86 SAI 0.86 1 19 TTS-HL

+0.00 TTS-HL Bobbin 30 105 WAR 23 1.46 P 4 0 3AVB

+0.00 F/L Bobbin WAR 23

1. 51 P 4 0 2AVB

+0.00 F/L Bobbin 31 32 ODI G

1.17 3 138 11TH TSP

+42.41 F/L C/L Special I VOL 1.77 1 122 10TH TSP

-1.44 10TH TSP Bobbin 31 33 NOI 0.73 3 111 IST TSP

+12.97 F/L H/L Special I VOL 2.49 1 162 2ND TSP

-11.33 2ND TSP Bobbin 31 36 WAR 15 0.69 P 4 0 2AVB

+0.00 F/L Bobbin 31 38 WAR 16 0.77 P 4 0 2AVB

+0.00 F/L Bobbin 31 41 NQI 0.55 3 92 11TH TSP

+36.23 F/L C/L Special I VOL 0.47 1 70 10TH TSP

-8.20 10TH TSP Bobbin 31 42 WAR 22 1.23 P 4 0 3AVB

+0.00 F/L Bobbin 31 44 WAR 18 0.90 P 4 0 3AVB

+0.00 F/L Bobbin 31 46 NOI 0.66 3 41 17TH TSP

+10.49 F/L C/L Special I VOL 0.43 1 91 17TH TSP

+11.50 17TH TSP Bobbin 31 49 WAR 8

0.35 P 4 0 2AVB

+0.00 F/L Bobbin 31 50 WAR 9

0.39 P 4 0 1AVB

+0.00 F/L H/L Tubesheet 31 59 SAI 0.84 1 16 TTS-HL

+0.00 TTS-HL Bobbin 31 67 WAR 12 0.53 P 4 0 1AVB

+0.00 F/L Bobbin WAR 18 0.85 P 4 0 3AVB

+0.00 F/L Bobbin 31 85 NOI 0.71 3 75 TTS-HL

+3.85 F/L H/L Special I VOL 0.41 1 163 TTS-HL

+3.64 TTS-HL H/L Tubesheet 31 86 SAI 0.78 1 25 TTS-HL

+0.02 TTS-HL Bobbin 31 99 ODI 57 0.50 P 1 97 3RD TSP

+0.02 F/L H/L Special I SAI 0.31 1 55 3RD TSP

+0.00 3RD TSP H/L Tubesheet 32 12 NQI 0.49 1 40 TTS-HL

+0.19 TTS-HL Bobbin 32 27 NQI 7.54 P 1 16 TE-HL

+19.63 F/L Bobbin 32 47 WAR 11 0.53 P 4 0 1AVB

+0.00 F/L Bobbin 32 54 NOI 0.48 3 101 13TH TSP

+1.38 F/L C/L Special I VOL 0.48 1 23 13TH TSP

+1.71 13TH TSP Bobbin 32 57 IDI 67 4.82 P 1 24 TE-HL

+3.01 F/L H/L Tubesheet 32 71 SAI 3.49 1 150 TTS-HL

+0.00 TTS-HL Bobbin 33 12 WAR 13 0.63 P 4 0 1AVB

+0.00 F/L Bobbin 33 33 WAR 13 0.63 P 4 0 2AVB

+0.00 F/L Bobbin WAR 27 1.85 P 4 0 3AVB

+0.00 F/L Bobbin 33 46 WAR 24 1.49 P 4 0 2AVB

+0.00 F/L Bobbin 33 51 WAR 19 1.0P P 4 0 1AVB

+0.00 F/L H/L Tubesheet 33 98 SAI 1.27 1 24 TTS-HL

+0.06 TTS-HL robbin 33 102 WAR 22 1.11 P 4 0 3AVB

+0.00 F/L E bbin WAR 25 1.33 P 4 0 2AVB

+0.00 F/L Bobbin 34 56 WAR 18 1.03 P 4 0 1AVB

+0.00 F/L tobbin 34 93 ODI 52 0.52 P 1 98 IST TSP

+0.15 F/L H/L Special I SAI 0.17 1 62 IST TSP

+0.01 IST TSP Bobbin 34 101 WAR 17 0.83 P 4 0 2AVB

+0.00 F/L Bobbin WAR 20 1.02 P 4 0 3AVB

+0.00 F/L Cobbin 35 19 WAR 25 1.82 P 4 0 2AVB

+0.00 F/L Cobbin 35 29 WAR 27 1.84 P 4 0 2AVB

+0.00 F/L Cobbin 35 46 WAR 17 0.96 P 4 0 1AVB

+0.00 F/L Cobbin 35 48 WAR 17 0.96 P 4 0 1AVB

+0.00 F/L H/L Tubesheet 35 51 SAI 1.00 1 33 TTS-HL

-0.03 TTS-HL Bobbin 35 53 WAR 23 1.49 P 4 0 1AVB

+0.00 F/L Bobbin 35 56 WAR 20 1.19 P 4 0 1AVB

+0.00 F/L Bobbin 35 67 ODI 34 0.57 3 115 12TH TSP

+17.21 F/L Bobbin 35 94 NQI 0.31 P 1 94 IST TSP

+0.02 F/L H/L Special I SAI 0.55 1 75 IST TSP

-0.06 IST TSP Bobbin 35 100 WAR 22 1.32 P 4 0 3AVB

+0.00 F/L Bobbin 36 23 WAR 21 1.30 P 4 0 3AVB

+0.00 F/L Bobbin 36 26 NOI 1.04 P 1 126 TE-CL

+16.27 F/L Bobbin 36 33 ODI 88 41.97 3 40 4AVB

+4.38 F/L U-Bend NQI 4.98 1 124 4AVB

-14.96 7TH TSP Cobbin 36 47 WAR 20 1.26 P 4 0 1AVB

+0.00 F/L Cobbin 36 55 NOI 6.47 P 1 13 TE-HL

+12.79 F/L Bobbin WAR 20 1.21 P 4 0 1AVB

+0.00 F/L Bobbin 36 65 ODI 65 0.35 P 1 85 2ND TSP

+0.07 F/L

BWNT TUBAN II (Version 2.1) 09/22/1994 16:31:50 McGuire Nuclear Station - Unit One S/G C 08/94 RFO Bobbin,C/L Special Interest,H/L Special Interest,H/L Tubesheet,U-Bend I

ATTACHMENT #11 - INDICATIONS OF IMPERFECTIONS INDICATIONS OF IMPERFECTIONS TEST TYPE ROW COL IND %TW VOLTS CHN DEG LOCATION EXTENT 1 H/L Special I SAI 0.25 1 62 2ND TSP

-0.03 2ND TSP H/L Tubesheet 36 67 SAI 0.58 1 26 TTS-HL

+0.09 TTS-HL U-Bend 36 68 VOL 0.88 1 52 7TH TSP

+3.78 7TH TSP Bobbin 36 96 WAR 14 0.62 P 4 0 4AVB

+0.00 F/L Bobbin 36 100 WAR 21 1.14 P4 0 3AVB

+0.00 F/L Bobbin 37 16 NOI 0.60 P 1 167 IST TSP

+0.12 F/L H/L Tubesheet 37 29 VOL 0.51 1 140 TTS-HL

+0.00 TTS-HL Bobbin 37 44 WAR 19 1.15 P 4 0 1AVB

+0.00 F/L Bobbin 37 47 WAR 11 0.65 P 4 0 1AVB

+0.00 F/L Bobbin 37 51 WAR 13 0.77 P 4 0 1AVB

+0.00 F/L Bobbin 37 52 WAR 9

0.58 P 4 0 1AVB

+0.00 F/L Bobbin 37 55 WAR 21 1.24 P 4 0 3AVB

+0.00 F/L H/L Tubesheet VOL 1.10 1 159 TTS-HL

+0.00 TTS-HL Bobbin 37 57 WAR 16 0.90 P 4 0 1AVB

+0.00 F/L Bobbin 37 60 WAR 12 0.52 P 4 0 1AVB

+0.00 F/L Bobbin 37 78 ADI 2.56 6 73 4TH TSP

+30.38 F/L H/L Special I VOL 0.36 1 113 4TH TSP

+30.20 4TH TSP Bobbin 38 18 WAR 15 0.86 P 4 0 3AVB

+0.00 F/L Bobbin 38 20 WAR 12 0.72 P 4 0 3AVB

+0.00 F/L Bobbin 38 25 WAR 9

0.56 P 4 0 1AVB

+0.00 F/L Bobbin WAR 15 0.87 P 4 0 2AVB

+0.00 F/L Bobbin WAR 19 1.14 P 4 0 3AVB

+0.00 F/L Bobbin 38 31 WAR 26 1.80 P 4 0 4AVB

+0.00 F/L Bobbin WAR 32 2.71 P 4 0 3AVB

+0.00 F/L Bobbin 38 42 ODI 6

0.53 3 138 11TH TSP

+18.65 F/L C/L Special I VOL 0.38 1 131 11TH TSP

+19.11 11TH TSP C/L Special I VOL 0.44 1 119 11TH TSP

+23.81 11TH TSP Bobbin 38 48 WAR 16 0.94 P4 0 1AVB

+0.00 F/L Bobbin 38 51 WAR 22 1.34 P 4 0 2AVB

+0.00 F/L Bobbin 38 52 WAR 14 0.80 P 4 0 1AVB

+0.00 F/L Bobbin 38 57 WAR 20 1.14 P4 0 1AVB

+0.00 F/L H/L Tubesheet 38 79 SAI 1.28 1 29 TTS-HL

+0.00 TTS-HL Bobbin 38 83 WAR 16 0.74 P 4 0 3AVB

+0.00 F/L Bobbin 39 28 WAR 12 0.60 P 4 0 2AVB

+0.00 F/L Bobbin WAR 17 0.89 P 4 0 3AVB

+0.00 F/L Bobbin 39 29 WAR 12 0.57 P 4 0 3AVB

+0.00 F/L Bobbin WAR 32 2.71 P 4 0 2AVB

+0.00 F/L Bobbin 39 30 WAR 12 0.56 P 4 0 1AVB

+0.00 F/L Bobbin WAR 17 0.86 P 4 0 2AVB

+0.00 F/L Bobbin WAR 18 0.95 P 4 0 3AVB

+0.00 F/L Bobbin 39 32 WAR 13 0.62 P 4 0 2AVB

+0.00 F/L Bobbin 39 39 WAR 22 1.25 P 4 0 3AVB

+0.00 F/L Bobbin 39 42 WAR 17 0.89 P 4 0 2AVB

+0.00 F/L Bobbin 39 49 WAR 13 0.62 P 4 0 1AVB

-0.08 F/L Bobbin 39 50 WAR 21 1.20 P 4 0 1AVB

+0.00 F/L Bobbin 39 52 WAR 24 1.47 P 4 0 1AVB

+0.00 F/L Bobbin 39 53 ODI 77 0.48 P 1 71 IST TSP

-0.05 F/L H/L Special I SAI 0.32 1 50 1ST TSP

-0.05 IST TSP Bobbin 39 54 NOI 1.92 3 30 6TH TSP

+10.57 F/L H/L Special I VOL 1.73 1 64 6TH TSP

+11.74 6TH TSP Bobbin 39 58 WAR 27 1.68 P 4 0 3AVB

+0.00 F/L Bobbin WAR 28 1.87 P 4 0 1AVB

+0.00 F/L Bobbin 39 61 WAR 18 0.86 P 4 0 1AVB

+0.00 F/L Bobbin 39 63 WAR 16 0.73 P 4 0 1AVB

+0.00 F/L Bobbin 39 64 WAR 19 0.92 P 4 0 1AVB

+0.00 F/L Bobbin 39 65 WAR 14 0.59 P 4 0 1AVB

+0.00 F/L Bobbin 39 82 WAR 31 2.29 P 4 0 2AVB

+0.00 F/L Bobbin 39 83 WAR 15 0.69 P 4 0 2AVB

+0.00 F/L Bobbin WAR 16 0.75 P 4 0 1AVB

+0.00 F/L Bobbin 39 84 ADI 6.25 6 70 6TH TSP

+21.75 F/L Bobbin WAR 12 0.52 P 4 0 2AVB

+0.00 F/L 1

Bobbin WAR 16 0.71 P 4 0 3AVB

+0.00 F/L H/L Special I VOL 1.26 1 136 6TH TSP

+21.77 6TH TSP Bobbin 39 91 WAR 17 0.79 P 4 0 3AVB

+0.00 F/L Bobbin 39 92 WAR 14 0.64 P4 0 1AVB

+0.00 F/L

  • a p

BWNT TUBAN II (Version 2.1) 09/22/1994 16:31:50 McGuire Nuclear Station - Unit One S/G C 08/94 RFO

[

Bobbin,C/L Special Interest,H/L Special Interest,H/L Tubesheet,U-Bend l

ATTACHMENT #11 - INDICATIONS OF IMPERFECTIONS INDICATIONS OF IMPERFECTIONS TEST TYPE ROW COL IND %TW VOLTS CHN DEG LOCATION EXTENT 1 Bobbin WAR 19 0.92 P 4 0 3AVB

+0.00 F/L Bobbin 39 93 WAR 22 1.20 P 4 0 3AVB

+0.00 F/L Bobbin 40 20 WAR 7

0.35 P 4 0 4AVB

+0.00 F/L Bobbin WAR 16 0.82 P 4 0 2AVB

+0.00 F/L Bobbin 40 26 WAR 12 0.59 P 4 0 1AVB

+0.00 F/L Bobbin 40 28 WAR 14 0.72 P 4 0 2AVB

+0.00 F/L Bobbin 40 31 WAR 12 0.60 P 4 0 1AVB

+0.00 F/L Bobbin 40 33 WAR 20 1.13 P 4 0 2AVB

+0.00 F/L Bobbin 40 39 WAR 18 0.92 P 4 0 2AVB

+0.00 F/L Bobbin 40 41 WAR 12 0.56 P 4 0 3AVB

+0.00 F/L Bobbin WAR 34 3.17 P 4 0 2AVB

+0.00 F/L Bobbin 40 42 WAR 21 1.17 P 4 0 3AVB

+0.00 F/L Bobbin WAR 28 1.93 P 4 0 2AVB

+0.00 F/L Bobbin 40 43 WAR 13 0.62 P 4 0 1AVB

+0.00 F/L Bobbin WAR 22 1.30 P 4 0 4AVB

+0.00 F/L Bobbin WAR 28 1.93 P 4 0 2AVB

+0.00 F/L Bobbin WAR 31 2.49 P 4 0 3AVB

+0.00 F/L Bobbin 40 46 WAR 19 1.01 P 4 0 1AVB

+0.00 F/L Bobbin 40 47 ODI 53 0.64 3 98 STH TSP

+12.36 F/L Bobbin WAR 15 0.75 P 4 0 3AVB

+0.00 F/L Bobbin WAR 30 2.24 P 4 0 1AVB

+0.00 F/L Bobbin 40 48 WAR 19 1.03 P 4 0 1AVB

+0.00 F/L Bobbin 40 50 WAR 15 0.76 P 4 0 3AVB

+0.00 F/L Bobbin 40 52 WAR 17 0.86 P 4 0 2AVB

+0.00 F/L Bobbin 40 56 WAR 12 0.59 P 4 0 1AVB

+0.00 F/L Bobbin WAR 13 0.63 P 4 0 2AVB

+0.00 F/L Bobbin 40 60 WAR 13 0.62 P 4 0 1AVB

+0.00 F/L Bobbin 40 61 WAR 26 1.60 P 4 0 2AVB

+0.00 F/L Bobbin 40 64 WAR 20 1.05 P 4 0 1AVB

+0.00 F/L Bobbin 40 65 WAR 19 0.95 P 4 0 1AVB

+0.00 F/L Bobbin 40 67 WAR 17 0.83 P 4 0 3AVB

+0.00 F/L Bobbin WAR 19 0.92 P 4 0 2AVB

+0.00 F/L Bobbin 40 71 WAR 18 0.85 P 4 0 1AVB 40.00 F/L Bobbin 40 80 WAR 21 1.07 P 4 0 1AVB

+0.00 F/L Bobbin 40 81 WAR 9

0.35 P 4 0 1AVB

+0.00 F/L Bobbin WAR 18 0.89 P 4 0 2AVB

+0.00 F/L Bobbin 40 82 WAR 15 0.69 P 4 0 2AVB

+0.00 F/L Bobbin 40 83 WAR 15 0.66 P 4 0 1AVB

+0.00 F/L Bobbin WAR 20 1.03 P 4 0 3AVB

+0.00 F/L Bobbin WAR 22 1.17 P 4 0 2AVB

+0.00 F/L Bobbin 40 92 WAR 18 0.85 P 4 0 3AVB

+0.00 F/L H/L Tubesheet 40 96 SAI 1.04 1 14 TTS-HL

+0.00 TTS-HL Bobbin 41 21 WAR 11 0.54 P 4 0 1AVB

+0.00 F/L Bobbin 41 24 WAR 26 1.70 P 4 0 2AVB

+0.00 F/L Bobbin 41 39 WAR 24 1.44 P 4 0 2AVB

+0.00 F/L Bobbin 41 41 NOI 2.06 P 1 40 TE-HL

+15.79 F/L Bobbin 41 49 WAR 14 0.67 P 4 0 4AVB

+0.00 F/L Bobbin 41 55 WAR 14 0.72 P 4 0 3AVB

+0.00 F/L Bobbin WAR 28 1.91 P 4 0 2AVB

+0.00 F/L Bobbin 41 74 WAR 11 0.46 P 4 0 2AVB

+0.00 F/L Bobbin WAR 15 0.68 P 4 0 1AVB

+0.00 F/L H/L Special I 41 79 VOL 0.84 1 141 IST TSP

+0.17 IST TSP H/L Tubesheet 41 93 VOL 0.20 1 77 TTS-HL

+0.70 TTS-HL Bobbin 42 22 IDI 99 10.52 P 1 33 TE-CL

+2.88 F/L Cobbin 42 51 ADI 2.46 6 75 9TH TSP

+21.05 F/L C/L Special I VOL 0.19 1 53 9TH TSP

+20.17 9TH TSP Bobbin 42 59 ADI 4.90 6 94 IST TSP

+11.76 F/L H/L Special I VOL 0.54 1 134 IST TSP

+11.60 IST TSP Bobbin 42 60 ODI 3

0.94 3 140 4TH TSP

+7.40 F/L H/L Special I VOL 2.00 1 163 4TH TSP

+6.99 4TH TSP Bobbin 42 84 ODI 17 1.20 4 137 STH TSP

+35.46 F/L H/L Special I VOL 0.55 1 51 STH TSP

+35.46 6TH TSP Bobbin 42 87 WAR 24 1.47 P 4 0 1AVB

+0.00 F/L Bobbin WAR 27 1.78 P 4 0 3AVB

+0.00 F/L Bobbin 43 22 WAR 22 1.22 P 4 0 1AVB

+0.00 F/L

BWNT TUBAN II (Version 2.1) 09/22/1994 16:31:50 McGuire Nuclear Station - Unit One S/G C 08/94 RFO Bobbin,C/L Special Interest,H/L Special Interest,H/L Tubesheet,U-Bend Page 10 of 11 ATTACHMENT #11 - INDICATIONS OF IMPERFECTIONS INDICATIONS OF IMPERFECTIONS TEST TYPE ROW COL IND %TW VOLTS CHN DEG LOCATION EXTENT 1 Bobbin 43 23 IDI 76 12.05 P 1 29 TE-CL

+4.45 F/L Bobbin 43 33 WAR 24 1.55 P 4 0 2AVB

+0.00 F/L Bobbin WAR 29 2.18 P 4 0 3AVB

+0.00 F/L Bobbin 43 40 ODI 4

1.77 3 140 3RD TSP

+18.64 F/L H/L Special I VOL 0.27 1 96 3RD TSP

+19.38 3RD TSP Bobbin 43 47 WAR 28 2.00 P 4 0 1AVB

+0.00 F/L Bobbin 43 48 WAR 19 0.98 P 4 0 1AVB

+0.00 F/L Bobbin 43 50 WAR 21 1.15 P 4 0 1AVB

+0.00 F/L Bobbin 43 53 WAR 20 1.16 P 4 0 1AVB

+0.00 F/L Bobbin 43 54 WAR 23 1.43 P 4 0 1AVB

+0.00 F/L Bobbin 43 55 WAR 21 1.12 P 4 0 1AVB

+0.00 F/L Bobbin 43 56 ADI 7.43 6 71 4TH TSP

+11.64 F/L Bobbin NOI 0.16 P 1 90 4TH TSP

+0.15 F/L Bobbin WAR 30 2.31 P4 0 1AVB

+0.00 F/L H/L Special I VOL 1.10 1 98 4TH TSP

+13.63 4TH TSP Bobbin 43 60 ODI 15 0.37 3 132 2ND TSP

+23.39 F/L H/L Special I VOL 0.59 1 129 2ND TSP

+23.32 2ND TSP Bobbin 43 73 ODI 5

1.37 4 138 3RD TSP

+31.11 F/L H/L Special I VOL 0.71 1 170 4TH TSP

-12.04 4TH TSP Bobbin 43 82 ODI 21 1.59 4 127 IST TSP

+20.44 F/L H/L Special I VOL O.50 1 124 IST TSP

+19.95 IST TSP Bobbin 43 85 WAR 20 1.18 P 4 0 4AVB

+0.00 F/L Bobbin 44 32 ADI 2.73 6 79 12TH TSP

+18.68 F/L C/L Special I VOL 0.27 1 84 12TH TSP

+18.79 12TH TSP Bobbin 44 44 ODI 19 0.49 3 128 15TH TSP

-1.49 F/L Bobbin 44 45 ADI 3.98 6 73 3RD TSP

+7.39 F/L H/L Special I VOL 0.30 1 96 3RD TSP

+7.39 3RD TSP Bobbin 44 56 ADI 2.20 6 73 TTS-HL

+12.20 F/L Bobbin ODI 4

1.35 4 145 TTS-HL

+8.96 F/L Bobbin ADI 5.09 6 70 19TH TSP

+13.22 F/L H/L Special I VOL 0.88 1 163 TTS-HL

+11.48 TTS-HL C/L Special I VOL 0.85 1 134 19TH TSP

+12.76 19TH TSP Bobbin 44 59 ADI 2.90 6 76 11TH TSP

+18.65 F/L C/L Special I VOL 0.66 1 160 11TH TSP

+18.08 11TH TSP Bobbin 44 60 ODI 10 2.19 4 158 TTS-HL

+9.61 F/L H/L Special I VOL 0.28 1 96 TTS-HL

+9.66 TTS-HL Bobbin 44 66 ODI 4

1.88 4 167 10TH TSP

+35.25 F/L Bobbin ODI 12 1.57 4 154 10TH TSP

+41.16 F/L Cobbin ODI 17 1.23 4 147 10TH TSP

+39.72 F/L C/L Special I VOL 0.53 1 121 10TH TSP

+39.12 9TH TSP C/L Special I VOL 0.79 1 119 10TH TSP

+40.78 9TH TSP C/L Special I VOL 0.99 1 145 10TH TSP

+37.18 9TH TSP C/L Special I VOL 1.30 1 168 10TH TSP

+34.57 9TH TSP Bobbin 44 75 NQI 0.46 P 1 31 2ND TSP

+0.15 F/L H/L Special I SAI 0.22 1 57 2ND TSP

+0.07 2ND TSP H/L Tubesheet 44 82 SAI 0.76 1 19 TTS-HL

+0.01 TTS-HL Bobbin 45 40 NOI 0.45 3 134 STH TSP

+26.46 F/L H/L Special I VOL 0.50 1 141 6TH TSP

-17.54 6TH TSP Bobbin 45 61 ADI 2.49 6 64 2AVB

+12.49 F/L U-B:nd VOL 0.74 1 7 2AVB

+12.49 2AVB Bobbin 45 63 ADI 3.53 6 105 4TH TSP

+5.84 F/L H/L Special I VOL 0.41 1 103 4TH TSP

+7.08 4TH TSP j

Bobbin 46 27 ADI 1.86 6 63 12TH TSP

+2.48 F/L i

C/L Special I VOL 0.41 1 100 12TH TSP

+2.37 12TH TSP Bobbin 46 35 NOI 0.35 P 1 127 12TH TSP

-0.08 F/L 1

H/L Tubesheet 46 83 SAI 0.58 1 26 TTS-HL

+0.03 TTS-HL H/L Tubesheet 46 84 MAI 0.93 1 24 TTS-HL

-0.04 TTS-HL Bobbin 48 60 ODI 7

1.03 3 132 6TH TSP

+13.69 F/L H/L Special I VOL 0.59 1 108 6TH TSP

+13.79 6TH TSP H/L Tubesheet 48 83 SAI 1.04 1 19 TTS-HL

-0.02 TTS-HL l

Bobbin 49 31 WAR 4

0.70 P 2 0 16TH TSP

+0.00 F/L i

Bobbin 49 39 WAR 5

0.92 P 2 0 17TH TSP

+0.00 F/L l

Bobbin WAR 10 1.91 P 2 0 16TH TSP

+0.00 F/L C/L Special I VOL 0.51 P 1 57 17TH TSP

+0.00 17TH TSP Bobbin 49 41 WAR 14 2.92 P 2 0 17TH TSP

+0.00 F/L l

BWNT TUBAN II (Version 2.1) 09/22/1994 16:31:50 McGuire Nuclear Station - Unit One S/G C 08/94 RFO Bobbin,C/L Special Interest,H/L Special Interest,H/L Tubesheet,U-Bend Page 11 of 11 ATTACHMENT #11 - INDICATIONS OF IMPERFECTIONS INDICATIONS OF IMPERFECTIONS TEST TYPE ROW COL IND %TW VOLTS CHN DEG LOCATION EXTENT 1 Bobbin WAR 15 3.12 P 2 0 14TH TSP

+0.00 F/L Bobbin WAR 25 5.76 P 2 0 16TH TSP

+0.00 F/L Bobbin 49 45 NOI 1.78 3 156 10TH TSP

+14.89 F/L C/L Special I VOL 0.95 1 161 10TH TSP

+14.54 10TH TSP Bobbin 49 50 ODI 59 0.72 P 1 96 13TH TSP

+0.05 F/L C/L Special I VOL 0.55 P 1 130 13TH TSP

+0.20 12TH TSP Bobbin 49 51 ODI 23 0.38 P 1 130 13TH TSP

+0.03 F/L C/L Special I VOL 0.57 P 1 166 13TH TSP

+0.19 12TH TSP Bobbin 49 54 ODI 50 0.34 P 1 106 13TH TSP

+0.00 F/L C/L Special I VOL 0.38 P 1 140 13TH TSP

+0.37 12TH TSP Bobbin 49 55 ODI 25 0.38 P 1 128 13TH TSP

+0.00 F/L H/L Tubesheet VOL 0.40 1 70 TTS-HL

+0.19 TTS-HL C/L Special I VOL 0.54 P 1 165 13TH TSP

+0.35 12TH TSP Bobbin 49 59 ODI 23 3.31 3 126 14TH TSP

+11.36 F/L C/L Special I VOL 1.73 1 162 14TH TSP

+12.23 14TH TSP Bobbin 49 61 ODI 2

0.66 3 140 14TH TSP

+11.32 F/L Bobbin 49 62 ODI 16 1.62 3 131 14TH TSP

+11.35 F/L Bobbin ODI 19 1.65 3 129 14TH TSP

+11.45 F/L C/L Special I VOL 0.19 1 128 14TH TSP

+11.76 14TH TSP Bobbin 49 66 ADI 3.34 6 91 4TH TSP

+35.72 F/L Bobbin ADI 4.96 6 88 3RD TSP

+8.88 F/L H/L Special I VOL 0.63 1 133 5TH TSP

-8.61 STH TSP H/L Special I VOL 1.63 1 129 3RD TSP

+0.90 3RD TSP Bobbin 49 70 NOI 2.63 3 141 12TH TSP

+1.19 F/L Bobbin 49 72 ODI 36 0.23 P 1 107 16TH TSP

-0.02 F/L C/L Special I VOL 0.44 P1 29 16TH TSP

+0.03 16TH TSP Bobbin 49 74 WAR 12 2.55 P 2 0 14TH TSP

+0.00 F/L Bobbin WAR 28 7.22 P 2 0 16TH TSP

+0.00 F/L Bobbin 49 76 WAR 8

1.66 P 2 0 16TH TSP

+0.00 F/L Bobbin 49 79 WAR 16 3.67 P 2 0 16TH TSP

+0.00 F/L Total Indications Found = 680 Total Tubes Found - 411 i

4

=

    • 5*****

BWNT TUBAN II (Version 2.1) 09/21/1994 15:54:34 McGuire Nuclear Station - Unit One S/G D 08/94 RFO Bobbin,C/L Special Interest,H/L Special Interest,H/L Tubesheet,U-Bend Page 1 of 14 ATTACHMENT #12 - INDICATIONS OF IMPERFECTIONS INDICATIONS OF IMPERFECTIONS TEST TYPE ROW COL IND %TW VOLTS CHN DEG LOCATION EXTENT 1 U-Band 2 18 VOL 0.83 1 42 8TH TSP

+3.13 8TH TSP Bobbin 2 29 IDI 45 13.21 P 1 18 TE-HL

+5.46 8TH TSP l

Bobbin 2 39 IDI 96 5.55 P 1 51 TE-HL

+10.71 BTH TSP H/L Tubesheet 2 56 MAI 0.56 1 195 TTS-HL

-0.91 TTS-HL Bobbin 2 61 IDI 70 3.70 P 1 87 TE-HL

+13.63 BTH TSP Bobbin IDI 93 0.92 P 1 50 TE-HL

+17.76 8TH TSP Bobbin IDI 95 12.91 P 1 45 TE-HL

+0.60 8TH TSP Bobbin 2 62 NOI 4.15 P 1 150 TE-HL

+13.35 BTH TSP Bobbin 2 76 IDI 58 5.87 P 1 19 TE-HL

+15.21 8TH TSP Bobbin 2 80 IDI 55 13.64 P1 18 TE-HL

+12.10 BTH TSP Bobbin 2 85 IDI 91 9.18 P 1 54 TE-HL

+10.00 8TH TSP Bobbin 3 27 NQI 2.45 P 1 134 TE-HL

+17.51 BTH TSP H/L Tubesheet SAI 2.64 1 32 TTS-HL

-4.07 TTS-HL Bobbin 3 36 IDI 92 5.28 P 1 50 TE-HL

+16.49 BTH TSP H/L Tubesheet 3 38 SAI 0.29 1 58 TTS-HL

-0.08 TTS-HL Bobbin 3 40 IDI 46 16.00 P 1 16 TE-HL

+16.21 8TH TSP Bobbin 3 96 NOI 0.41 3 72 TTS-CL

+15.49 8TH TSP Bobbin 3 110 IDI 82 3.15 P 1 27 TE-HL

+7.80 BTH TSP H/L Tubesheet 4 23 SAI 0.60 1 32 TTS-HL

-0.03 TTS-HL 1

Bobbin 4 33 IDI 64 8.87 P 1 21 TE-HL

+11.03 BTH TSP l

H/L Tubesheet 4 34 SAI 2.09 1 13 TTS-HL

+0.00 TTS-HL l

Bobbin 4 41 NOI 4.95 P 1 150 TE-HL

+8.26 BTH TSP H/L Tubesheet 4 49 SAI 1.17 1 17 TTS-HL

-0.04 TTS-HL Bobbin 4 66 IDI 76 2.73 P 1 77 TE-HL

+6.42 BTH TSP Bobbin 4 68 IDI 85 3.22 P 1 28 TE-HL

+11.23 BTH TSP Bobbin 4 71 NOI 1.16 3 128 6TH TSP

+29.91 BTH TSP l

Bobbin ODI 10 1.47 3 137 6TH TSP

+23.23 8TH TSP H/L Special I VOL 0.63 1 119 6TH TSP

+11.57 6TH TSP H/L Special I VOL 0.71 1 114 6TH TSP

+13.69 6TH TSP H/L Special I VOL 0.71 1 118 6TH TSP

+27.27 6TH TSP H/L Special I VOL 1.14 1 117 6TH TSP

+20.58 6TH TSP H/L Special I VOL 1.20 1 131 6TH TSP

+28.61 6TH TSP H/L Special I VOL 1.99 1 112 6TH TSP

+24.04 6TH TSP Bobbin 4 78 IDI 95 3.63 P 1 45 TE-HL

+12.28 BTH TSP Bobbin 4 84 IDI 68 5.48 P 1 88 TE-HL

+10.25 BTH TSP 1

H/L Tubesheet 4 87 SAI 1.29 1 17 TTS-HL

-0.07 TTS-HL l

H/L Tubenheet 4 92 SAI 1.17 1 35 TTS-HL

-0.06 TTS-HL l

Bobbin 4 94 IDI 36 19.22 P 1 12 TE-HL

+12.20 BTH TSP H/L Tubesheet 4 97 SAI 1.26 1 39 TTS-HL

-4.07 TTS-HL Bobbin 4 98 ODI 15 0.87 3 133 3RD TSP

+22.89 BTH TSP H/L Special I VOL 0.32 1 124 3RD TSP

+18.21 3RD TSP Bobbin 4 100 IDI 20 4.76 P 1 121 TE-HL

+4.96 BTH TSP Bobbin 4 107 ADI 2.42 6 57 11TH TSP

+34.18 BTH TSP C/L Special I VOL 0.90 1 27 10TH TSP

-9.32 l0TH TSP Bobbin 5

4 IDI 58 13.82 P 1 19 TE-HL

+15.48 8TH TSP H/L Special I MAI 16.18 1 19 TE-HL

+15.49 TTS-HL Bobbin 5

7 IDI 91 6.66 P 1 54 TE-HL

+11.88 BTH TSP Bobbin 5 14 NQI 0.77 3 41 2ND TSP

+5.85 8TH TSP H/L Special I VOL 0.62 1 126 2ND TSP

+6.41 2ND TSP l

Bobbin 5 16 IDI 17 0.69 P 1 120 TE-CL

+6.40 BTH TSP Bobbin 5 18 NOI 0.34 3 54 IST TSP

+9.02 BTH TSP 1

Bobbin NQI 0.42 3 55 2ND TSP

+5.99 BTH TSP H/L Special I VOL 0.32 1 102 2ND TSP

+6.45 2ND TSP H/L Tubenheet 5 27 SAI 1.66 1 30 TTS-HL

+0.00 TTS-HL Cobbin 5 29 ODI 2

2.67 3 146 19TH TSP

+1.41 BTH TSP C/L Special I VOL 0.62 1 47 19TH TSP

+1.43 19TH TSP Bobbin 5 31 IDI 55 15.90 P 1 18 TE-HL

+3.14 BTH TSP

[

Bobbin IDI 74 3.63 P 1 80 TE-HL

+13.33 BTH T3P Tobbin 5 44 IDI 55 9.30 P 1 18 TE-HL

+5.95 8TH TSP Bobbin 5 46 NOI 3.03 P 1 145 TE-HL

+12.61 BTH TSP H/L Tubesheet SAI 0.66 1 17 TTS-HL

-0.89 TTS-HL Bobbin 5 59 NOI 0.60 P 1 86 2ND TSr

-0.09 BTH TSP Bobbin 5 61 IDI 85 4.86 P 1 64 TE-HL

+14.32 BTH TSP H/L Tubesheet 5 66 MAI 0.90 1 34 TTS-HL

-0.09 TTS-HL

/

Bobbin 5 67 IDI 99 5.12 P1 34 TE-HL

+12.97 BTH TSP l

l 1

t BWHT TUBAH II (Varsion 2.1) 09/21/1994 15:54:34 McGuire Nuclear Station - Unit Ona

              • e S/G D 08/94 RFO Bobbin,C/L Special Interest,H/L Special Interest,H/L Tubesheet,U-Bend Page 2 of 14 ATTACHMENT #12 - INDICATIONS OF IMPERFECTIONS INDICATIONS OF IMPERFECTIONS TEST TYPE ROW COL IND tTW VOLTS CHN DEG LOCATION EXTENT 1 Bobbin 5 68 IDI 88 10.63 P 1 29 TE-HL

+9.98 BTH TSP Bobbin 5 81 NOI 0.72 3 27 TTS-CL

+10.08 BTH TSP C/L Special I VOL 1.09 1 132 TTS-CL

+9.94 TTS-CL H/L Tubesheet 5 83 SAI 0.48 1 29 TTS-HL

-0.10 TTS-HL H/L Tubesheet 5 87 SAI 0.74 1 37 TTS-HL

-0.10 TTS-HL Bobbin 5 94 IDI 97 2.18 P 1 32 TE-HL

+7.79 8TH TSP Bobbin 5 95 NQI 2.53 P 1 80 TE-HL

+10.21 8TH TSP H/L Tubesheet 6

9 SAI 0.71 1 39 TTS-HL

-0.05 TTS-HL Bobbin 6 16 ODI 26 0.20 P 1 119 2ND TSP

+0.07 F/L H/L Tubesheet 6 22 MAI 0.98 1 34 TTS-HL

-0.03 TTS-HL Bobbin 6 35 NOI 2.58 P 1 110 TE-HL

+10.28 F/L Bobbin NQI 3.68 P 1 59 TE-HL

+3.02 F/L Bobbin NQI 7.42 P 1 64 TE-HL

+8.66 F/L H/L Tubesheet SAI 1.28 1 37 TTS-HL

-2.71 TTS-HL Bobbin 6 54 NOI 0.55 3 96 12TH TSP

+9.64 F/L Bobbin 6 57 ADI 2.16 6 85 STH TSP

+35.65 F/L Bobbin ODI 18 1.82 4 135 9TH TSP

+5.16 F/L C/L Special I VOL 0.55 1 24 9TH TSP

+4.90 9TH TSP H/L Special I VOL 1.16 1 169 6TH TSP

-8.59 6TH TSP Bobbin 6 68 IDI 90 11.01 P 1 28 TE-HL

+17.21 F/L H/L Tubesheet MAI 5.68 1 20 TTS-HL

-4.20 TTS-HL H/L Special I MAI 7.60 1 25 TE-HL

+16.62 TE-HL Bobbin 6 70 IDI 29 12.52 P 1 9 TE-HL

+2.73 F/L Bobbin 6 71 IDI 83 5.10 P 1 57 TE-HL

+16.21 F/L H/L Tubesheet MAI 2.15 1 41 TTS-HL

-5.09 TTS-HL Bobbin 6 74 IDI 58 9.01 P 1 18 TE-HL

+1.88 F/L Bobbin 6 82 IDI 10 6.15 P 1 3 TE-HL

+14.31 F/L Bobbin 6 85 IDI 96 5.65 P 1 38 TE-HL

+11.29 F/L Bobbin 6 86 NOI 4.54 P 1 139 TE-HL

+2.05 F/L Bobbin 6 89 NQI 0.66 3 82 2ND TSP

+11.51 F/L H/L Special I VOL 0.35 1 125 2ND TSP

+11.74 2ND TSP Bobbin 6 94 NOI 3.26 P 1 155 TE-HL

+14.51 F/L Bobbin 6 109 NQI 0.39 P 1 57 IST TSP

+0.05 F/L Bobbin 7

4 NOI 0.38 P 1 51 2ND TSP

-0.02 F/L Bobbin 7 24 NQI 0.56 P 1 76 2ND TSP

+0.12 F/L H/L Special I SAI 0.35 1 48 2ND TSP

+0.09 2ND TSP H/L Tubesheet 7 33 SAI 0.91 1 22 TTS-HL

-4.48 TTS-HL H/L Tube. sheet 7 38 SAI 1.25 1 28 TTS-HL

-0.15 TTS-HL Bobbin 7 60 NOI 7.45 P 1 149 TE-HL

+10.82 F/L Bobbin NQI 13.06 P 1 166 TE-HL

+9.81 F/L H/L Tubesheet 7 61 SAI 0.90 1 23 TTS-HL

-2.88 TTS-HL Bobbin 7 66 IDI 99 3.51 P 1 35 TE-HL

+7.94 F/L H/L Tubesheet 7 80 SAI 0.77 1 36 TTS-HL

-0.09 TTS-HL Bobbin 7 82 ODI 21 0.26 3 125 IST TSP

+10.14 F/L Bobbin NQI 0.26 P 1 99 15TH TSP

-0.35 F/L H/L Tubesheet 7 84 SAI 0.54 1 29 TTS-HL

-2.08 TTS-HL Bobbin 7 87 IDI 30 5.52 P 1 110 TE-HL

+9.80 F/L Bobbin 8

4 IDI 92 9.35 P 1 51 TE-HL

+13.01 F/L H/L Tubesheet SCI 0.27 1 33 TTS-HL

-0.09 TTS-HL Cobbin 8 23 IDI 82 36.65 P 1 32 TE-HL

+3.03 F/L Bobbin IDI 86 5.24 P1 59 TE-HL

+10.07 F/L H/L Tubesheet B 31 SAI 0.86 1 26 TTS-HL

-0.06 TTS-HL Bobbin 8 59 IDI 55 1.55 P 1 82 TE-HL

+5.92 F/L Bobbin 8 63 NQI 8.54 P 1 149 TE-HL

+10.29 F/L Bobbin IDI 87 5.27 P 1 58 TE-HL

+15.47 F/L H/L Tubesheet 8 66 MAI 0.24 1 34 TTS-HL

+0.07 TTS-HL Cobbin 8 67 ODI 35 0.58 3 112 6TH TSP

+22.56 F/L H/L Special I VOL 0.50 1 24 6TH TSP

+22.36 6TH TSP H/L Tubesheet 8 69 SAI 1.52 1 21 TTS-HL

-0.03 TTS-HL Bobbin 8 74 IDI 74 15.46 P 1 29 TE-HL

+5.86 F/L H/L Tubesheet 8 75 SAI 1.30 1 24 TTS-HL

-3.42 TTS-HL Bobbin 8 83 WAR 6

0.41 P 4 0 4AVB

+0.00 F/L Cobbin IDI 92 6.35 P 1 36 TE-HL

+13.40 F/L H/L Tubesheet MAI 0.97 1 33 TTS-HL

-3.97 TTS-HL H/L Tubesheet 8 89 SAI 0.55 1 19 TTS-HL

+0.00 TTS-HL

BWNT TUBAN II (Version 2.1) 09/21/1994 15:54:34 McGuire Nuclear Station - Unit One S/G D 08/94 RFO Bobbin,C/L Special Interest,H/L Special Interest,H/L Tubesheet,U-Bend Page 3 of 14 ATTACHMENT #12 - INDICATIONS OF IMPERFECTIONS INDICATIONS OF IMPERFECTIONS TEST TYPE ROW COL IND %TW VOLTS CIDI DEG LOCATION EXTENT 1 H/L Tubesheet 8 98 SAI 0.57 1 27 TTS-HL

-1.82 TTS-HL Bobbin 8 102 IDI 80 4.02 P 1 60 TE-HL

+16.00 F/L H/L Tubesheet SAI 5.39 1 27 TTS-HL

-4.89 TTS-HL Bobbin 8 104 ADI 3.10 6 42 11TH TSP

+19.00 F/L C/L Special I VOL 1.04 1 162 11TH TSP

+15.48 11TH TSP Bobbin 9

5 IDI 88 15.42 P 1 52 TE-HL

+15.15 F/L H/L Special I MAI 10.44 1 30 TE-HL

+15.37 TE-HL H/L Tubesheet 9 12 SCI 0.47 1 97 TTS-HL

-0.10 TTS-HL Bobbin 9 15 IDI 87 6.56 P 1 27 TE-CL

+15.41 F/L C/L Special I MAI 3.31 1 22 TTS-CL

-5.75 TTS-CL H/L Tubesheet 9 16 VOL 0.36 1 133 TTS-HL

-0.59 TTS-HL H/L Tubesheet 9 18 SAI 0.92 1 13 TTS-HL

-3.97 TTS-HL Bobbin 9 24 NQI 3.39 P 1 93 TE-HL

+16.18 F/L Bobbin 9 41 ODI 16 1.21 3 132 11TH TSP

+42.43 F/L C/L Special I VOL 1.63 1 144 10TH TSP

-1.01 10TH TSP Bobbin 9 70 IDI 87 5.65 P 1 34 TE-HL

+9.87 F/L H/L Tubesheet 9 76 SAI 0.42 1 34 TTS-HL

-0.07 TTS-HL Bobbin 9 81 IDI 73 10.02 P 1 76 TE-HL

+7.00 F/L Bobbin IDI 84 6.28 P 1 63 TE-HL

+16.14 F/L Bobbin 9 85 IDI 59 12.72 P 1 23 TE-HL

+10.61 F/L Bobbin 9 98 NOI 3.55 P 1 85 TE-HL

+15.16 F/L Bobbin 9 102 IDI 35 8.31 P 1 12 TE-CL

+19.50 F/L Bobbin 9 103 NOI 0.29 P 1 106 15TH TSP

-0.34 F/L Bobbin 10 50 NQI 0.36 P 1 47 BTH TSP

+0.00 F/L Bobbin 10 66 WAR 6

0.40 P 4 0 4AVB

+0.00 F/L H/L Tubesheet 10 79 SAI 0.40 1 30 TTS-HL

-0.09 TTS-HL Bobbin 10 85 IDI 79 21.43 P 1 31 TE-HL

+11.75 F/L Bobbin 10 87 IDI 82 5.35 P 1 65 TE-HL

+14.85 F/L H/L Special I MAI 2.98 1 21 TE-HL

+13.64 TTS-HL H/L Special I MAI 3.33 1 23 TE-HL

+1.68 TTS-HL U-Bend 10 113 SCI 1.15 1 17 7TH TSP

+21.07 7TH TSP Bobbin 11 2 IDI 93 2.77 P 1 40 TE-HL

+12.73 F/L H/L Tubesheet 11 5 VOL 0.18 1 98 TTS-HL

-0.04 TTS-HL Cobbin 11 12 ODI 19 1.33 4 129 12TH TSP

+11.79 F/L C/L Special I VOL 0.74 1 114 11TH TSP

-10.63 11TH TSP Bobbin 11 13 IDI 79 14.56 P 1 23 TE-CL

+17.11 F/L C/L Special I MAI 4.27 1 22 TTS-CL

-4.05 TTS-CL Bobbin 11 17 IDI 38 17.30 P 1 11 TE-HL

+11.04 F/L H/L Tubesheet 11 62 SAI 0.88 1 21 TTS-HL

-4.16 TTS-HL Bobbin 11 72 IDI 78 16.12 P 1 61 TE-HL

+13.45 F/L Bobbin 11 74 NQI 0.34 3 81 6TH TSP

+37.24 F/L H/L Tubesheet 11 78 SAI 0.51 1 18 TTS-HL

+0.01 TTS-HL Bobbin 11 84 IDI 76 17.08 P 1 64 TE-HL

+13.44 F/L Bobbin IDI 85 7.91 P 1 52 TE-HL

+5.64 F/L Bobbin IDI 89 24.14 P1 47 TE-HL

+10.50 F/L Bobbin 11 85 IDI 93 17.64 P1 28 TE-HL

+9.61 F/L Bobbin 11 89 IDI 100 3.81 P 1 30 TE-HL

+13.84 F/L Bobbin 11 96 IDI 93 9.19 P 1 41 TE-HL

+16,91 F/L H/L Tubesheet MAI 6.52 1 30 TTS-HL

-4.08 TTS-HL Bobbin 11 103 IDI 70 3.57 P 1 71 TE-HL

+14.33 F/L Bobbin 11 107 ODI 21 1.06 3 124 15TH TSP

+0.88 F/L C/L Special I VOL 0.64 1 39 15TH TSP

+0.94 15TH TSP Bobbin 12 16 ADI 6.35 6 110 8TH TSP

+6.61 F/L U-Bend VOL 0.61 1 84 8TH TSP

+6.64 8TH TSP Bobbin 12 23 ADI 2.61 6 68 18TH TSP

+3.01 F/L C/L Special I VOL 0.34 1 90 18TH TSP

+2.87 17TH TSP Bobbin 12 28 ADI 3.74 6 56 10TH TSP

+6.79 F/L Cobbin ODI 23 0.33 3 126 19TH TSP

+2.04 F/L C/L'Special I VOL 0.35 1 82 10TH TSP

+6.66 10TH TSP C/L Special I VOL 0.65 1 104 19TH TSP

+2.18 19TH TSP Bobbin 12 30 IDI 60 2.61 P 1 82 TE-HL

+16.60 F/L H/L Tubesheet MAI 2.38 1 29 TTS-HL

-2.86 TTS-HL H/L Tubesheet 12 49 SAI 0.54 1 23 TTS-HL

-0.01 TTS-HL H/L Tubesheet 12 61 SAI 0.69 1 21 TTS-HL

-3.17 TTS-HL H/L Tubesheet SAI 0.75 1 21 TTS-HL

-2.10 TTS-HL i

e*******

BWNT TUBAN II (Version 2.1) 09/21/1994 15:54:34 McGuire Nuclear Station - Unit One S/G D 08/94 RFO Bobbin,C/L Special Interest,H/L Special Interest,H/L Tubesheet,U-Bend Page 4 of 14 ATTACHMENT #12 - INDICATIONS OF IMPERFECTIONS INDICATIONS OF IMPERFECTIONS TEST TYPE ROW COL IND %TW VOLTS CHN DEG LOCATION EXTENT 1 Bobbin 12 64 NQI 0.24 P 1 80 2ND TSP

+0.12 F/L Cobbin 12 65 ODI 12 1.10 3 131 9TH TSP

+21.83 F/L C/L Special I VOL 1.08 1 94 9TH TSP

+21.93 9TH TSP H/L Tubesheet 12 80 SAI 0.54 1 22 TTS-HL

-0.10 TTS-HL Bobbin 12 96 ADI 4.79 6 64 4AVB

-2.47 F/L U-Bend VOL 0.97 1 34 4AVB

-2.41 BTH TSP Bobbin 13 11 ADI 3.39 6 43 9TH TSP

+5.77 F/L Bobbin IDI 55 14.66 P 1 16 TE-HL

+11.76 F/L Bobbin IDI 86 14.65 P 1 51 TE-HL

+13.08 F/L C/L Special I VOL 1.12 1 166 9TH TSP

+5.43 9TH TSP Bobbin 13 18 ADI 1.92 6 58 STH TSP

+8.47 F/L Bobbin 13 27 IDI 91 17.57 P 1 43 TE-HL

+15.94 F/L Bobbin 13 57 ODI 5

1.18 3 142 13TH TSP

+8.70 F/L C/L Special I.

VOL 0.76 1 135 13TH TSP

+8.88 12TH TSP Bobbin 13 64 IDI 68 3.72 P 1 23 TE-HL

+11.57 F/L Bobbin 13 65 IDI 76 14.25 P 1 26 TE-HL

+8.20 F/L Bobbin 13 66 IDI 35 17.59 P 1 12 TE-HL

+13.31 F/L Bobbin 13 67 IDI 53 20.51 P 1 18 TE-HL

+4.68 F/L Bobbin 13 72 IDI 58 4.19 P 1 89 TE-HL

+12.31 F/L H/L Tubesheet 13 78 SAI 1.09 1 27 TTS-HL

-0.07 TTS-HL H/L Tubesheet 13 80 MAI 0.50 1 40 TTS-HL

+0.00 TTS-HL Bobbin 13 83 IDI 96 14.32 P 1 42 TE-HL

+10.02 F/L H/L Tubesheet 13 87 MAI 0.96 1 17 TTS-HL

-4.52 TTS-HL Bobbin 13 89 IDI 95 4.78 P 1 44 TE-HL

+15.28 F/L H/L Tubesheet 13 98 MAI 0.72 1 23 TTS-HL

-4.36 TTS-HL H/L Tubesheet 14 16 SAI 0.73 1 25 TTS-HL

-0.53 TTS-HL Bobbin 14 38 IDI 1

4.39 P 1 141 TE-HL

+13.68 F/L Bobbin 14 48 IDI 44 5.93 P 1 110 TE-HL

+6.22 F/L Bobbin 14 53 NOI 0.84 P 1 53 IST TSP

+0.13 F/L H/L Special I SAI 0.59 1 62 IST TSP

+0.06 IST TSP Bobbin 14 65 NQI 5.05 P 1 76 TE-HL

+6.58 F/L Bobbin 14 72 IDI 62 13.54 P1 16 TE-HL

+14.27 F/L H/L Tubesheet 14 76 SAI 0.98 1 18 TTS-HL

-0.10 TTS-HL Bobbin 14 80 IDI 54 11.61 P 1 14 TE-HL

+9.38 F/L H/L Tubesheet SAI 0.95 1 23 TTS-HL

+0.03 TTS-HL H/L Tubesheet 14 81 SAI 0.98 1 24 TTS-HL

+0 05 TTS-HL H/L Tubesheet 14 91 MAI 0.91 1 28 TTS-HL

-5.00 TTS-HL Cobbin.

14 93 ODI 14 0.77 3 132 TTS-HL

+12.41 F/L H/L Special I VOL 0.54 1 104 TTS-HL

+11.28 TTS-HL Bobbin 14 94 IDI 43 10.80 P 1 10 TE-HL

+14.51 F/L Cobbin 15 14 ODI 1

1.93 3 145 2ND TSP

+33.78 F/L H/L Special I VOL 1.05 1 44 3RD TSP

-11.17 3RD TSP Bobbin 15 38 IDI 94 43.70 P 1 49 TE-HL

+15.89 F/L

'H/L Tubesheet 15 39 VOL 0.55 1 90 TTS-HL

-1.47 TTS-HL H/L Tubesheet VOL 0.57 1 138 TTS-HL

-0.16 TTS-HL H/L Tubesheet VOL 0.62 1 107 TTS-HL

-2.99 TTS-HL H/L Tubesheet VOL 0.85 1 41 TTS-HL

+1.37 TTS-HL Bobbin 15 59 IDI 94 57.96 P 1 37 TE-HL

+15.44 F/L Cobbin 15 61 IDI 1

2.89 P 1 138 TE-HL

+3.19 F/L Cobbin IDI 2

3.29 P 1 127 TE-HL

+7.95 F/L Cobbin IDI 56 3.57 P 1 84 TE-HL

+11.76 F/L Cobbin 15 64 IDI 25 2.16 P 1 111 TE-HL

+17.08 F/L H/L Tubesheet MAI 2.96 1 34 TTS-HL

-3.60 TTS-HL Bobbin 15 74 ADI 2.68 6 74 16TH TSP

+3.81 F/L C/L Special I VOL 0.99 1 23 16TH TSP

+3.80 16TH TSP Cobbin 15 85 IDI 61 8.75 P 1 17 TE-HL

+11.71 F/L Cobbin 15 91 NOI 0.45 P 1 139 2ND TSP

+0.05 F/L Bobbin 16 11 NOI 0.65 3 105 17TH TSP

+14.38 F/L Cobbin IDI 91 56.53 P 1 54 TE-HL

+14.62 F/L C/L Special I VOL 0.53 1 132 17TH TSP

+14.51 17TH TSP' Bobbin 16 13 IDI 91 38.90 P 1 54 TE-HL

+12.71 F/L Cobbin 16 14 IDI 95 7.45 P 1 47 TE-HL

+14.38 F/L H/L Tubenheet SAI 0.93 1 38 TTS-HL

+0.09 TTS-HL Cobbin 16 17 IDI 75 17.83 P 1 72 TE-HL

+10.42 F/L Bobbin 16 19 NQI 4.45 P 1 159 TE-HL

+9.61 F/L

4 BWNT TUBAN II' (Version 2.1).

09/21/1994 15:54:34 McGuire Nuclear Station - Unit One S/G D

          • e**

08/94 RFO Bobbin,C/L Special Interest,H/L Special Interest,H/L Tubesheet,U-Bend l

Page 5 of 14 ATTACHMENT #12 - INDICATIONS OF IMPERFECTIONS i

INDICATIONS OF IMPERFECTIONS TEST TYPE ROW COL IND %TW VOLTS CHN DEG LOCATION EXTENT 1 H/L Tubesheet SAI 0.51 1 37 TTS-HL

-1.49 TTS-HL Bobbin 16 21 IDI 97 26.77 P 1 44 TE-HL

+18.71 F/L H/L Tubesheet MAI 12.08 1 29 TTS-HL

-4.24 TTS-HL Bobbin 16 33 ODI 11 0.84 3 137 6TH TSP

+24.03 F/L H/L Special I VOL 0.56 1 96 6TH TSP

+14.63 6TH TSP H/L Special I VOL 1.36 1 136 6TH TSP

+25.36 6TH TSP H/L Special I VOL 1.91 1 153 6TH TSP

+22.03 6TH TSP H/L Tubesheet 16 34 SAI 0.56 1 37 TTS-HL

-1.68 TTS-HL Bobbin 16 41 IDI 86 5.54 P 1 61 TE-HL

+13.96 F/L Bobbin 16 47 IDI 90 4.53 P 1 55 TE-HL

+7.36 F/L Bobbin 16 67 NQI 0.77 P 1 105 2ND TSP

-0.11 F/L H/L Special I SAI 1.01 1 44 2ND TSP

-0.12 2ND TSP H/L Tubesheet 16 80 MAI 0.48 1 55 TTS-HL

-0.09 TTS-HL Bobbin 16 93 ADI 1.62 6 65 4TH TSP

+16.24 F/L Bobbin ODI 1

1.03 3 143 10TH TSP

+26.47 F/L H/L Special I VOL 0.53 1 43 4TH TSP

+16.75 4TH TSP i

C/L Special I VOL 1.15 1 20 10TH TSP

+26.53 10TH TSP l'

Bobbin 16 97 IDI 57 4.09 P 1 20 TE-HL

+9.53 F/L Bobbin IDI 60 2.32 P 1 21 TE-HL

+10.54 F/L Bobbin 16 99 NQI 2.06 P 1 25 TE-HL

+19.22 F/L H/L Tubesheet VOL 1.15 1 70 TTS-HL

+0.64 TTS-HL Bobbin 16 110 ADI 3.43 6 75 9TH TSP

+31.99 F/L C/L Special I VOL 0.80 1 110 9TH TSP

+31.32 9TH TSP Bobbin 17 12 IDI 92 3.80 P 1 47 TE-HL

+17.70 F/L-H/L Tubesheet MAI 2.36 1 19 TTS-HL

-3.86 TTS-HL Bobbin 17 15 IDI 90 19.93 P 1 49 TE-HL

+15.73 F/L Bobbin 17 24 IDI 86 4.88 P 1 56 TE-HL

+13.90 F/L i

Bobbin IDI 88 6.84 P 1 30 TE-HL

+13.52 F/L H/L Tubesheet 17 57 SAI 1.16 1 41 TTS-HL

+0.01 TTS-HL H/L Tubesheet 17 62 MAI 0.67 1 18 TTS-HL

-1.77 TTS-HL H/L Tubesheet 17 67 MAI 0.70 1 18 TTS-HL

-2.70 TTS-HL Bobbin 17 68 ADI 2.62 6 43 TTS-HL

+11.38 F/L H/L Special I VOL 0.81 1 155 TTS-HL

+9.54 TTS-HL Bobbin 17 76 ODI 7

0.52 3 142 TTS-CL

+3.65 F/L H/L Tubesheet 17 81 SAI 2.04 1 23 TTS-HL

-3.53 TTS-HL Bobbin 17 85 IDI 32 9.89 P 1 9 TE-HL

+15.31 F/L Bobbin IDI 95 3.11 P 1 36 TE-HL

+15.53 F/L H/L Tubesheet 17 88 SAI 1.41 1 40 TTS-HL

-0.04 TTS-HL Bobbin 17 90 IDI 77 4.64 P 1 61 TE-HL

+15.39 F/L

-Bobbin 17 94 IDI 57 12.22.P 1 16 TE-HL

+11.48 F/L Bobbin 18 4 IDI 98 6.81 P 1 37 TE-HL

+10.35 F/L Bobbin 18 11 IDI 59 3.88 P 1 88 TE-HL

+16.09 F/L' i

H/L Special I SAI 4.99 1 37 TE-HL

+16.29 TTS-HL I

Bobbin 18 16 IDI 94 17.76 P 1 44 TE-HL

+14.82 F/L I

Bobbin 18 32 NQI 6.40 P 1 154 TE-HL

+6.37 F/L H/L Tubesheet 18 33 SAI 0.99 1 30 TTS-HL

-2.35 TTS-HL l

Bobbin 18 34 IDI 88 18.46 P 1 53 TE-HL

+12.46 F/L l

Bobbin 18 48 NQI 0.48 3 50 6TH TSP

+15.67 F/L H/L Special I VOL 1.00 1 137 6TH TSP

+16.84 6TH TSP Bobbin 18 59 IDI 2

10.54 P 1 132 TE-HL

+7.06 F/L Bobbin 18 60 IDI 90 10.03 P 1 46 TE-HL

+10.80 F/L Bobbin 18 79 NOI 4.43 P 1 144 TE-HL

+18.07 F/L H/L Tubesheet MAI 1.45 1 25 TTS-HL

-2.25 TTS-HL Bobbin 18 80 IDI-13 17.49 P 1 4 TE-HL

+11.81 F/L tobbin 18 89 IDI 80 4.27 P 1 60 TE-HL

+12.52 F/L Bobbin 18 96 NQI 7.32 P 1 185 TE-HL

+17.12 F/L

' Bobbin IDI 47 2.54 P 1 14 TE-HL

+12.38 F/L Bobbin IDI 73 2.11 P 1 22 TE-HL

+9.52 F/L Bobbin IDI 95 6.51 P 1 38 TE-HL

+14.28 F/L 1

Bobbin 19 5 NQI 4.26 P 1 166 TE-HL

+10.82 F/L Bobbin 19 20 ODI 4

1.36 3 143 STH TSP

+25.63 F/L H/L Special I VOL 1.11 1 138 STH TSP

+26.15 STH TSP Bobbin 19 22 IDI 47 3.15 P 1 99 TE-HL

+16.84 F/L H/L Tubesheet MAI 3.69 1 18 TTS-HL

-3.69 TTS-HL H/L Special I MAI 4.00 1 23 TTS-HL

-4.06 TTS-HL i

  • we*****

BWNT TUBAN II (Version 2.1) 09/21/1994 15:54:34 McGuire Nuclear Station - Unit One S/G D 08/94 RPO Bobbin,C/L Special Interest,H/L Special Interest,H/L Tubesheet,U-Bend Page 6 of 14 ATTACHMENT #12 - INDICATIONS OF IMPERFECTIONS INDICATIONS OF IMPERFECTIONS TEST TYPE ROW COL IND %TW VOLTS CHN DEG LOCATION EXTENT 1 Bobbin 19 23 IDI 57 9.17 P 1 20 TE-HL

+10.35 F/L Bobbin 19 45 ODI 4

0.68 3 143 2ND TSP

+34.83 F/L H/L Special I VOL 0.45 1 244 2ND TSP

+34.83 3RD TSP Bobbin 19 52 IDI 9

3.27 P 1 133 TE-HL

+9.40 F/L Bobbtn 19 62 IDI 42 25.48 P 1 16 TE-HL

+13.52 F/L Bobbe; IDI 84 35.24 P1 64 TE-HL

+7.14 F/L H/L Tubesheet SAI 1.22 1 32 TTS-HL

-0.18 TTS-HL Bobbin 19 86 ODI 19 1.50 3 130 11TH TSP

+13.20 F/L C/L Special I VOL 1.65 1 112 11TH TSP

+13.21 11TH TSP Bobbin 19 87 IDI 16 4.48 P 1 129 TE-HL

+12.71 F/L Bobbin 19 108 ODI 6

1.83 3 143 TTS-CL

+13.90 F/L C/L Special I VOL 2.45 1 116 TTS-CL

+13.37 20TH TSP Bobbin 20 17 ODI 14 0.53 3 134 STH TSP

+33.35 F/L H/L Special I VOL 1.34 1 160 STH TSP

+33.15 STH TSP Bobbin 20 24 IDI 83 6.36 P 1 29 TE-HL

+8.48 F/L Bobbin 20 26 ADI 7.86 6 68 STH TSP d7.25 F/L Bobbin ADI 3.02 6 48 10TH TSP

+8.52 F/L H/L Special I VOL 1.73 1 137 STH TSP

+18.42 STH TSP Bobbin 20 30 ODI 27 0.58 3 121 12TH TSP

+6.85 F/L C/L Special I VOL 0.70 1 104 12TH TSP

+6.82 12TH TSP Bobbin 20 35 ODI 21 0.38 3 127 TTS-CL

+18.54 F/L Bobbin 20 36 ADI 1.68 6 70 6TH TSP

+12.68 F/L H/L Special I VOL 1.28 1 164 6TH TSP

+13.61 6TH TSP Bobbin 20 3A IDI 85 9.38 P 1 58 TE-HL

+10.55 F/L Bobbin 20 74 NOI 0.83 3 97 IST TSP

+3.22 F/L Bobbin NOI 0.46 3 84 13TH TSP

+4.34 F/L Bobbin ADI 2.61 6 90 2ND TSP

+3.27 to

+38.15 F/L Sobbin ADI 4.92 6 96 IST TSP

+3.22 to

+14.83 F/L R/L Special I VOL 0.45 1 95 2ND TSP

+16.26 3RD TSP H/L Special I VOL 0.45 1 113 2ND TSP

+20.57 3RD TSP H/L Special I VOL 1.31 1 22 IST TSP

+3.28 2ND TSP H/L Special I VOL 1.92 1 22 IST TSP

-1.07 2ND TSP H/L Special I VOL 2.52 1 16 IST TSP

+14.57 2ND TSP C/L Special I VOL 0.28 1 127 13TH TSP

+3.98 13TH TSP Bobbin 20 78 ADI 1.69 6 47 12TH TSP

+11.05 F/L H/L Tubesheet 20 82 SAI 0.92 1 32 TTS-HL

+0.00 TTS-HL Bobbin 20 83 NQI 11.54 P 1 165 TE-HL

+13.73 F/L H/L Special I MAI 4.12 1 17 TE-HL

+12.69 TTS-HL Bobbin 20 86 IDI 84 7.19 P 1 32 TE-HL

+1.98 F/L Bobbin 20 90 IDI 96 8.90 P 1 46 TE-HL

+14.44 F/L Bobbin 20 92 IDI 98 11.65 P 1 42 TE-HL

+11.52 F/L H/L Tubesheet 20 97 SAI 0.64 1 20 TTS-HL

-1.01 TTS-HL Bobbin 20 98 ADI 4.01 6 68 10TH TSP

+35.08 F/L Bobbin NOI 0.71 3 138 10TH TSP

+42.54 F/L C/L Special I VOL 0.46 1 107 9TH TSP

-1.48 9TH TSP C/L Special I VOL 0.63 1 85 9TH TSP

-9.14 9TH TSP Bobbin 20 106 NOI 0.79 3 119 12TH TSP

+2.02 F/L C/L Special I VOL 1.33 1 117 12TH TSP

+2.11 12TH TSP Bobbin 21 5 IDI 89 18.47 P 1 31 TE-HL

+0.70 F/L Bobbin 21 7 ADI 2.23 6 65 STH TSP

+41.33 F/L H/L Special I VOL 0.64 1 114 STH TSP

+41.39 6TH TSP Bobbin 21 13 NQI 0.38 P 1 66 11TH TSP

+0.58 F/L H/L Tubesheet 21 14 SAI 1.28 1

't5 TTS-HL

-0.03 TTS-HL H/L Tubesheet 21 15 SAI 0.53 1 24 TTS-HL

-0.70 TTS-HL Bobbin 21 34 IDI 85 16.58 P 1 57 TE-HL

+3.08 F/L Bobbin 21 43 IDI 60 25.51 P 1 21 TE-HL

+9.23 F/L H/L Tubesheet 21 61 MAI 1.23 1 40 TTS-HL

+0.06 TTS-HL Bobbin 21 75 IDI 45 9.88 P 1 17 TE-HL

+19.25 F/L H/L Tubesheet MAI 1.42 1 18 TTS-HL

-1.97 TTS-HL H/L Tubesheet 22 6 SAI 0.38 1 32 TTS-HL

+0.09 TTS-HL Bobbin 22 10 IDI 95 32.34 P 1 44 TE-HL

+16.63 F/L H/L Tubesheet MAI 14.72 1 28 TTS-HL

-4.26 TTS-HL H/L Special I MAI 10.30 4 64 TE-HL

+16.52 TTS-HL i

Bobbin 22 13 IDI 80 23.36 P 1 28 TE-HL

+0.74 F/L Bobbin 22 27 ODI 21 0.51 3 126 13TH TSP

+4.26 F/L

BWNT TUBAN II (Version 2.1) 09/21/1994 15:54:34 McGuire Nuclear Station - Unit One S/G D 08/94 RFO Bobbin,C/L Special Interest,H/L Special Interest,H/L Tubesheet,U-Bend ATTACHMENT #12 - INDICATIONS OF IMPERFECTIONS INDICATIONS OF IMPERFECTIONS TEST TYPE ROW COL IND LTW VOLTS CHN DEG LOCATION EXTENT 1 C/L Special I VOL 0.76 1 90 13TH TSP

+4.27 13TH TSP Bobbin 22 30 IDI 96 5.99 P 1 27 TE-HL

+6.06 F/L Bobbin 22 38 IDI 93 80.58 P 1 39 TE-HL

+17.79 F/L H/L.3pecial I MAI 17.08 1 27 TTS-HL

-5.41 TTS-HL Bobbin 22 51 NOI 0.40 3 88 TTS-CL

+18.71 F/L Bobbin 22 81 WAR 10 0.57 P 4 0 3AVB

+0.00 F/L Bobbin 22 83 NOI 2.92 3 25 7TH TSP

+9.52 F/L U-Band VOL 2.00 1 140 7TH TSP

+9.52 7TH TSP H/L Tubecheet 23 6 SAI 2.24 1 24 TTS-HL

-0.19 TTS-HL Bobbin 23 11 IDI 78 2.40 P 1 61 TE-HL

+16.56 F/L H/L Special I MAI 0.81 P 1 14 TE-HL

+1*7. 02 TTS-HL Bobbin 23 21 NOI 0.49 3 115 TTS-CL

+24.33 F/L H/L Tubesheet SAI 0.53 1 30 TTS-HL

+0.00 TTS-HL C/L Special I VOL 0.42 1 64 TTS-CL

+24.14 20TH TSP H/L Tubenheet 23 48 SAI 0.67 1 29 TTS-HL

-0.03 TTS-HL Bobbin 23 56 IDI 89 3.23 P 1 45 TE-HL

+12.10 F/L Bobbin 23 70 IDI 75 37.20 P 1 30 TE-HL

+7.57 F/L l

Bobbin IDI 80 7.48 P 1 32 TE-HL

+5.87 F/L Bobbin 23 79 ODI 4

0.91 3 143 TTS-HL

+*. I. 2 2 F/L H/L Special I VOL 1.93 1 156 TTS-HL

+1*s.48 TTS-HL Bobbin 23 81 IDI 70 8.89 P 1 28 TE-HL

+11.20 F/L Bobbin 23 83 IDI 58 13.81 P 1 23 TE-HL

+2.80 F/L Bobbin 23 92 IDI 61 12.92 P 1 17 TE-HL

+7.52 F/L Bobbin 23 106 ODI 10 0.52 3 137 IST TSP

+7.99 F/L H/L Special I VOL 0.44 1 113 IST TSP

+2.66 IST TSP H/L Special I VOL 0.48 1 81 IST TSP

+5.02 IST TSP H/L Special I VOL 0.60 1 63 IST TSP

+12.63 IST TSP H/L Special I VOL 0.61 1 62 IST TSP

+0.83 IST TSP H/L Special I VOL 0.63 1 107 IST TSP

+9.06 IST TSP H/L Special I VOL 0.67 1 111 IST TSP

+3.25 IST TSP r

H/L Special I VOL 0.69 1 36 IST TSP

+15.29 IST TSP H/L Special I VOL 0.69 1 146 IST TSP

+6.48 IST TSP H/L Special I VOL 0.73 1 107 IST TSP

+1.99 IST TSP H/L Special I VOL 0.73 1 107 IST TSP

+7.91 IST TSP H/L Special I VOL 0.80 1 69 IST TSP

+11.48 IST TSP H/L Special I VOL 0.87 1 109 IST TSP

+5.61 JST TSP Bobbin 24 12 IDI 85 2.51 P 1 51 TE-CL

+13.35 F/L Bobbin IDI 89 4.29 P 1 46 TE-CL

+16.97 F/L C/L Special I MAI 1.51 2 18 TE-CL

+16.49 TTS-CL Bobbin 24 14 ODI 3

1.57 4 149 10TH TSP

+18.61 F/L Bobbin 24 19 IDI 85 10.51 P 1 51 TE-HL

+17.59 F/L H/L Tubesheet MAI 6.44 1 33 TTS-HL

-3.41 TTS-HL Bobbin 24 20 IDI 79 4.11 P 1 59 TE-HL

+16.00 F/L Bobbin 24 22 IDI 93 1.38 P 1 26 TE-HL

+15.79 F/L Bobbin 24 23 IDI 69 8.30 P 1 72 TE-HL

+16.77 F/L H/L Tubesheet MAI 7.39 1 24 TTS-HL

-4.27 TTS-HL Bobbin 24 26 IDI 43 18.46 P 1 12 TE-HL

+4.79 F/L Bobbin 24 34 ODI 28 1.28 3 11 TTS-CL

+19.18 F/L Bobbin 24 45 NQI 3.02 3 15 10TH TSP

+19.69 F/L Bobbin NQI 3.63 3 15 10TH TSP

+10.33 F/L Bobbin 24 94 NQI 0.43 3 56 9TH TSP

+17.30 F/L Bobbin 25 10 ODI 7

0.58 3 139 11TH TSP

+14.11 F/L C/L Special I VOL 0.68 1 111 11TH TSP

+13.07 11TH TSP Robbin 25 44 IDI 21 2.46 P 1 129 TE-KL

+7.76 F/L Bobbin 25 48 NOI 3.94 3 11 1AVB

+7.77 F/L tobbin 25 54 IDI 60 18.23 P 1 21 TE-HL

+12.08 F/L Bobbin 25 104 ADI 2.14 6 67 2ND TSP

+2.80-F/L Bobbin ODI 3

1.98 4 148 2ND TSP

+4.58 F/L H/L Special I VOL 0.54 1 153 2ND TSP

+2.95 2ND TSP H/L Special I VOL 0.64 1 49 2ND TSP

+4.68 2ND TSP H/L Tubesheet 25 106 VOL 0.64 1 100 TTS-HL

-0.53 TTS-HL H/L Tubenheet VOL 0.81 1 120 TTS-HL

-1.00 TTS-HL Bobbin 26 17 IDI 47 21.71 P1 15 TE-HL

+11.69 F/L Bobbin 26 28 NOI 0.53 3 101 9TH TSP

+37.98 F/L C/L Special I VOL 2.37 1 148 9TH TSP

+37.98 9TH TSP

+

BWNT TUBAN II (Version 2.1) 09/21/1994 15:54:34 McGuire Nuclear Station - Unit One S/G D 08/94 RFO Bobbin,C/L Special Interest,H/L Special Interest,H/L Tubesheet,U-Bend Page 8 of 14 ATTACHMENT #12 - INDICATIONS OF IMPERFECTIONS INDICATIONS OF IMPERFECTIONS TEST TYPE ROW COL IND %TW VOLTS CHN DEG LOCATION EXTENT 1 Bobbin 26 30 ADI 5.12 6 46 11TH TSP

+27.42 F/L C/L Special I VOL 0.72 1 124 11TH TSP

+27.42 10TH TSP Bobbin 26 40 IDI 88 7.84 P1 28 TE-HL

+16.42 F/L Bobbin 26 66 IDI 79 9.29 P 1 22 TE-HL

+10.47 F/L Bobbin 26 76 NQI 0.54 3 103 10TH TSP

+23.47 F/L Bobbin 26 88 WAR 12 0.67 P 4 0 2AVB 40.00 F/L Bobbin 26 106 ODI 10 0.95 4 134 3RD TSP

+19.50 F/L H/L Special I VOL 0.82 1 17 3RD TSP

+19.01 3RD TSP Bobbin 26 107 WAR 9

0.48 P 4 0 3AVB

+0.00 F/L Bobbin 27 17 NOI 2.50 P 1 136 TE-HL

+10.90 F/L Bobbin 27 18 IDI 86 2.78 P 1 48 TE-HL

+16.58 F/L H/L Tubesheet SAI 1.30 1 48 TTS-HL

-4.24 TTS-HL H/L Tubesheet 27 29 MAI 0.58 1 29 TTS-HL

+0.00 TTS-HL Bobbin 27 30 IDI 32 13.01 P 1 9 TE-HL

+10.59 F/L Bobbin 27 35 IDI 82 1.99 P 1 54 TE-HL

+16.54 F/L Bobbin 27 36 IDI 36 9.44 P1 10 TE-HL

+8.24 F/L H/L Tubesheet 27 37 SAI 1.06 1 23 TTS-HL

-0.02 TTS-HL H/L Tubesheet 27 48 SAI 1.99 1 36 TTS-HL

+0.00 TTS-HL Bobbin 27 69 IDI 74 33.83 P 1 25 TE-HL

+3.12 F/L H/L Tubesheet 27 78 SAI 0.59 1 153 TTS-HL

-1.17 TTS-HL Bobbin 27 82 IDI 71 6.22 P 1 24 TE-HL

+11.37 F/L Bobbin 27 84 WAR 17 1.08 P 4 0 1AVB

+0.00 F/L Bobbin 27 95 NOI 2.06 3 157 3AVB

-5.47 F/L U-Bsnd VOL 1.86 1 150 3AVB

-6.08 2AVB Bobbin 27 98 ADI 7.00 6 77 16TH TSP

+8.29 F/L C/L Special I.

VOL 0.77 1 111 16TH TSP

+8.19 15TH TSP Bobbin 27 102 ODI 13 0.49 3 133 TTS-HL

+8.94 F/L H/L Special I VOL 0.48 1 46 TTS-HL

+7.12 TTS-HL Bobbin 27 106 WAR 12 0.72 P 4 0 1AVB

+0.00 F/L Bobbin 28 9 ODI 29 0.91 3 119 TTS-HL

+1.93 F/L Bobbin ODI 31 0.18 3 117 TTS-HL

+1.52 F/L H/L Special I VOL 0.29 1 99 TTS-HL

+0.32 TTS-HL H/L Special I VOL 0.49 1 90 TTS-HL

+1.80 TTS-HL Bobbin 28 15 IDI 39 3.20 P 1 11 TE-HL

+9.73 F/L Bobbin 28 24 IDI 79 2.06 P 1 22 TE-HL

+13.55 F/L Bobbin 28 26 IDI 43 8.31 P 1 12 TE-HL

+10.38 F/L Bobbin 28 43 ODI 7

1.11 3 140 TTS-CL

+12.68 F/L Bobbin ODI 21 0.45 3 127 TTS-CL

+4.94 F/L C/L Special I VOL 0.61 1 115 TTS-CL

+12.42 20TH TSP H/L Tubesheet 28 47 MAI 0.86 1 27 TTS-HL

-0.95 TTS-HL Bobbin 28 70 IDI 94 42.03 P 1 39 TE-HL

+4.69 F/L H/L Tubesheet MAI 1.14 1 55 TTS-HL

-3.05 TTS-HL Bobbin 28 75 IDI 47 8.48 P 1 16 TE-HL

+4.19 F/L Bobbin 28 81 IDI 53 10.20 P 1 18 TE-HL

+7.23 F/L Bobbin 28 85 IDI 100 6.79 P 1 34 TE-HL

+9.93 F/L I

Bobbin 28 99 ADI 8.16 6 90 TTS-HL

+13.36 F/L H/L Special I VOL 1.47 1 95 TTS-HL

+12.99 TTS-HL Bobbin 29 11 NOI 2.15 P 1 137 TE-HL

+17.42 F/L Bobbin WAR 14 0.79 P 4 0 2AVB

+0.00 F/L H/L Tubesheet MAI 2.26 1 17 TTS-HL

-3.64 TTS-HL H/L Special I MAI 2.20 1 25 TTS-HL

-3.63 TTS-HL Bobbin 29 20 IDI 24 1.21 P 1 112 TE-HL

+16.85 F/L H/L Tubesheet SAI 0.76 1 50 TTS-HL

-4.14 TTS-HL H/L Tubesheet 29 21 SAI 0.83 1 24 TTS-HL

-4.45 TTS-HL H/L Tubesheet 29 23 SAI 0.99 1 22 TTS-HL

-3.65 TTS-HL Bobbin 29 34 IDI 85 8.14 P1 50 TE-HL

+16.44 F/L Bobbin 29 36 IDI 25 5.68 P 1 7 TE-HL

+14.50 F/L Bobbin 29 43 IDI 93 2.30 P 1 39 TE-HL

+17.41 F/L H/L-Tubesheet MAI 2.67 1 35 TTS-HL

-3.51 TTS-HL Bobbin 29 44 IDI 39 7.11 P 1 11 TE-HL

+15.37 F/L Bobbin IDI 43 10.90 P 1 12 TE-HL

+4.55 F/L Bobbin IDI 50 12.63 P 1 14 TE-HL

+1.86 F/L Bobbin 29 45 IDI 46 9.98 P 1 13 TE-HL

+7.24 F/L Bobbin 29 46 IDI 64 8.19 P 1 18 TE-HL

+12.49 F/L Bobbin 29 47 IDI 43 10.18 P 1 12 TE-HL

+13.62 F/L

BWNT TUBAN II (Version 2.1) 09/21/1994 15:54:34 McGuire Nuclear Station - Unit One l

S/G D i

08/94 RFO 1

Bobbin,C/L Special Interest,H/L Special Interest,H/L Tubesheet,U-Bend I

Page 9 of 14 f

ATTACHMENT #12 - INDICATIONS OF IMPERFECTIONS l

INDICATIONS OF IMPERFECTIONS TEST TYPE ROW COL IND %TW VOLTS CHN DEG LOCATION EXTENT 1 1

?

Bobbin 29 49 IDI 20 6.26 P 1 115 TE-HL

+16.95 F/L i

Bobbin 29 54 IDI 93 3.07 P 1 39 TE-HL

+10.53 F/L Bobbin 29 65 IDI 91 2.15 P 1 42 TE-HL

+8.29 F/L

{

59bbin 29 66 IDI 33 12.03 P 1 9 TE-HL

+10.47 F/L j

Bobbin IDI 89 10.70 P 1 24 TE-HL

.+12.36 F/L H/L Tubesheet MAI 0.37 1 33 TTS-HL

-3.41 TTS-HL Bobbin 29 67 IDI 99 21.10 P 1 29 TE-HL

+10.68 F/L l

Bobbin 29 75 ODI 81 9.53 P 1 22 TE-HL

+2.17 F/L

?

Bobbin 29 77 NOI 3.13 P 1 157 TE-HL

+10.73 F/L j

Bobbin 29 88 IDI 59 10.97 P 1 16 TE-HL

+12.32 F/L H/L Tubesheet SAI 0.48 1 18 TTS-HL

+0.03 TTS-HL Bobbin 29 104 ODI 13 1.21 4 153 STH TSP

+32.84 F/L j

H/L Special I VOL 0.91 1 13 6TH TSP

-9.16 6TH TSP Bobbin 30 11 ODI 3

0.93 3 144 10TH TSP

+16.65 F/L i

C/L Special I VOL 1.10 1 138 10TH TSP

+15.51 10TH TSP Bobbin 30 14 ODI 2

1.04 3 145 11TH TSP

+5.35 F/L i

Bobbin ODI 6

0.64 3 141 13TH TSP

+5.39 F/L i

C/L Special I VOL 0.52 1 308 13TH TSP

+4.86 13TH TSP i

C/L Special I VOL 0.96 1 136 11TH TSP

+5.23 11TH TSP

{

Bobbin 30 39 IDI 94 11.04 P 1 33 TE-HL

+2.97 F/L t

Bobbin 30 40 IDI 17 5.00 P 1 6 TE-HL

+9.68 F/L l

Bobbin 30 61 IDI 86 4.84 P 1 50 TE-HL

+7.92 F/L 1

Bobbin IDI 89 9.85 P 1 24 TE-HL

+6.00 F/L I

Bobbin 30 62 IDI 70 2.36 P 1 70 TE-HL

+16.80 F/L H/L Tubesheet MAI 2.08 1 30 TTS-HL

-3.85 TTS-HL H/L Special I MAI 2.00 1 24 TE-HL

+17.62 TTS-HL f

Bobbin 30 64 IDI 86 4.56 P 1 49 TE-HL

+6.46 F/L

~

Bobbin 30 66 IDI 56 1.68 P 1 85 TE-HL

+14.53 F/L Bobbin 30 68 IDI 91 6.94 P 1 51 TE-HL

+11.81 F/L l

Bobbin 30 69 IDI 70 5.55 P 1 19 TE-HL

+1.98 F/L Bobbin IDI 92 6.63 P 1 40 TE-HL

+7.56 F/L Bobbin 30 70 IDI 81 14.29 P 1 22 TE-HL

+3.08 F/L h

Bobbin 30 76 IDI 52 5.35 P 1 14 TE-HL

+13.71 F/L Bobbin IDI 95 7.55 P 1 36 TE-HL

+5.85 F/L l

Bobbin 30 77 IDI 59 23.72 P 1 20 TE-HL

+12.72 F/L Bobbin 30 80 IDI 82 6.66 P 1 55 TE-HL

+13.89 F/L Bobbin 30 90 ODI 14 0.62 3 133 2ND TSP

+41.78 F/L H/L Special I VOL 1.10 1 54 3RD TSP

-3.26 3RD TSP

}

Bobbin 30 91 NOI 0.63 5 87 3AVB

-11.70 F/L Bobbin 30 100 IDI 56 0.95 P 1 84 TE-HL

+14.95 F/L i

Bobbin 31 14 IDI 99 11.09 P 1 37 TE-HL

+12.56 F/L F

H/L Tubesheet 31 32 SCI 0.57 1 13 TTS-HL

-0.03 TTS-HL i

H/L Tubenheet 31 34 SAI 0.99 1 33 TTS-HL

-0.07 TTS-HL r

Bobbin 31 38 IDI 94 70.52 P 1 44 TE-HL

+15.25 F/L Bobbin 31 39 NQI 2.20 3 10 3RD TSP

+40.88 F/L H/L Tubesheet 31 42 SAI 0.73 1 19 TTS-HL

-2.51 TTS-HL Bobbin 31 70 IDI 88 18.77 P 1 30 TE-HL

+3.48 F/L Bobbin 31 97 ADI 2.64 6 103 STH TSP

+4.57 F/L H/L Special I VOL 0.58 1 116 5TH TSP

+4.82 STH TSP-l Bobbin 31 100 IDI 97 5.17 P 1 34 TE-HL

+11.37 F/L-i Eobbin 32 22 NQI 2.81 P 1 132 TE-HL

+8.75 F/L I

Bobbin IDI 5

1.29 P 1 126 TE-CL

+15.28 F/L Bobbin 32 26 ODI 5

1.46 4 133 3AVB

-3.44 F/L t

Bobbin ODI 15 0.65 3 133 TTS-CL

+19.92 F/L l

C/L Special I VOL' O.61 1 107 TTS-CL

+19.92 20TH TSP 2

Eobbin 32 35 IDI 39 9.16 P 1 12 TE-HL

+15.38 F/L I

Bobbin 32 38 IDI 88 2.79 P 1 47 TE-HL

+15.49 F/L l

H/L Tubesheet SAI 1.74 1 21 TTS-HL

-4.36 TTS-HL t

Bobbin 32 42 ODI.

8 0.52 3 138 STH TSP

+20.76 F/L H/L Special I VOL 0.52 1 90 STH TSP

+20.84 STH TSP'

{

Bobbin 32 43 IDI 55 1.43 P 1 17 TE-HL

+5.80 F/L Bobbin IDI.71 8.83 P 1 22 TE-HL

+7.37 F/L H/L Tubesheet 32 44 SAI 0.34 1 27 TTS-HL

-0.03 TTS-HL 4

H/L Tubesheet 32 55 SAI 0.32 1 32 TTS-HL

-0.01 TTS-HL Bobbin 32 59 ODI 16 2.51 4 158 10TH TSP

+20.86 F/L 1

{

l

m BWNT TUBAN II (Version 2.1) 09/21/1994 15:54:34 McGuire Nuclear Station - Unit One

        • eeee S/G D 08/94 RFO i

Bobbin,C/L Special Interest,H/L Special Interest,H/L Tubesheet,U-Bend ATTACHMENT #12 - INDICATIONS OF IMPERFECTIONS INDICATIONS OF IMPERFECTIONS TEST TYPE ROW COL IND %TW VOLTS CHN DEG LOCATION EXTENT 1 C/L Special I VOL 0.64 1 150 10TH TSP

+20.51 10TH TSP Bobbin 32 62 IDI 100 5.91 P 1 34 TE-HL

+5.63 F/L Bobbin 32 63 WAR 15 0.96 P 4 0 1AVB

+0.00 F/L i

Bobbin 32 88 ADI 1.94 6 52 2ND TSP

+30.67 F/L l

Bobbin ADI 2.21 6 96 2ND TSP

+33.06 F/L Bobbin ADI 1.83 6 87 15TH TSP

+5.10 F/L Bobbin ODI 24 1.31 4 145 IST TSP

+5.72 F/L i

Bobbin ODI 28 0.94 3 120 IST TSP

+4.73 F/L H/L Special I VOL 0.48 1 77 3RD TSP

-12.29 3RD TSP H/L Special I VOL 0.52 1 82 3RD TSP

-15.02 3RD TSP H/L Special I VOL 1.01 1 131 IST TSP

+5.78 1ST TSP H/L Special I VOL 1.31 1 122 IST TSP

+4.38 IST TSP Bobbin 32 89 ODI 13 0.38 3 133 10TH TSP

+25.53 F/L Bobbin 32 92 NOI 0.45 3 33 2ND TSP

+37.80 F/L Bobbin 32 93 ADI 1.98 6 88 17TH TSP

+18.53 F/L Bobbin 32 97 ODI 10 1.31 4 166 9TH TSP

+25.66 F/L Bobbin ODI 13 0.97 4 162 2ND TSP

+38.81 F/L i

Bobbin ODI 24 1.05 4 146 STH TSP

+15.39 F/L C/L Special I VOL 0.51 1 126 9TH TSP

+25.83 9TH TSP r

H/L Special I VOL 0.34 1 119 3RD TSP

-5.90 3RD TSP f

H/L Special I VOL 0.67 1 124 STH TSP

+13.32 STH TSP H/L Special I VOL 0.71 1 126 STH TSP

+17.85 STH TSP H/L Special I VOL 0.83 1 127 STH TSP

+15.49 STH TSP Bobbin 32 98 ADI 5.03 6 37 7TH TSP

+53.99 F/L U-Band VOL 1.16 1 22 7TH TSP

+54.30 7TH TSP i

Bobbin 33 20 IDI 92 9.88 P 1 37 TE-HL

+9.51 F/L Bobbin 33 27 ODI 24 0.59 3 122 11TH TSP

+9.28 F/L C/L Special I VOL 0.81 1 137 11TH TSP

+9.30 11TH TSP C/L Special I VOL 0.89 1 148 11TH TSP

+9.28 11TH TSP Bobbin 33 33 IDI 91 4.77 P 1 43 TE-HL

+17.45 F/L i

H/L Tubesheet MAI 3.40 1 21 TTS-HL

-3.60 TTS-HL Bobbin 33 36 NOI 2.54 3 23 2ND TSP

+30.07 F/L H/L Special I VOL 6.74 1 17 2ND TSP

+29.94 2ND TSP Bobbin 33 51 ODI 15 0.35 3 131 9TH TSP

+31.02 F/L H/L Tubesheet 33 54 SAI 0.95 1 18 TTS-HL

-3.19 TTS-HL

~

Bobbin 33 55 WAR 18 1.05 P 4 0 1AVB

+0.00 F/L H/L Tubesheet 33 58 SAI 0.69 1 23 TTS-HL

-0.21 TTS-HL I

Bobbin 33 67 NOI 0.32 P 1 106 14TH TSP

-0.40 F/L Bobbin 33 84 WAR 9

0.55 P 4 0 1AVB

+0.00 F/L Bobbin 33 93 NOI 0.26 3 85 9TH Th'

+32.52 F/L Bobbin 33 98 ODI 14 2.12 4 161 13TH TS.'

+5.49 F/L C/L Special I VOL 0.33 1 73 13TH TSP

+4.99 12TH TSP Bobbin 33 99 ADI 3.25 6 44 17TH TSP

+9.24 F/L Bobbin 33 101 ODI 4

0.29 3 141 4TH TSP

+23.03 F/L l

H/L Special I VOL 0.39 1 129 4TH TSP

+23.09 4TH TSP Bobbin 34 15 IDI 28 1.88 P 1 119 TE-HL

+9.79 F/L i

H/L Tubesheet 34 29 SCI 0.39 1 34 TTS-HL

-0.04 TTS-HL Bobbin 34 37 NOI 7.59 P 1 166 TE-HL

+7.71 F/L Bobbin 34 43 NOI 11.43 3 184 7TH TSP

+25.97 F/L Bobbin 34 73 IDI 85 15.73 P 1 53 TE-HL

+13.41 F/L Bobbin 34 75 IDI 72 2.85 P 1 68 TE-HL

+13.40 F/L Bobbin 34 81 IDI 94 9.05 P 1 42 TE-HL

+8.75 F/L Bobbin 34 84 ODI 20 0.94 3 127 16TH TSP

+4.88 F/L C/L Special I VOL 0.45 1 57 16TH TSP

+5.10 16TH TSP Bobbin 34 86 ADI 2.47 6 73 4TH TSP

+23.02 F/L H/L Special I VOL 0.59 1 141 4TH TSP

+22.70 4TH TSP r

Bobbin 35 14 ODI 30 0.30 3 118 IST TSP

+20.56 F/L H/L Special I VOL 0.20 1 164 IST TSP

+20.66 2ND TSP j

Bobbin 35 15 ODI 23 0.69 3 125 IST TSP

+21.23 F/L H/L Special I VOL 0.41 1 107 IST TSP

+21.21 2ND TSP Bobbin 35 17 NOI 3.85 P 1 25 TE-HL

+13.68 F/L 4

Bobbin 35 29 IDI 98 4.97 P 1 28 TE-HL

+13.51

'F/L l

Bobbin 35 38 NQI 2.93 P 1 39 TE-HL

+16.41 F/L Bobbin 35 56 ADI 5.62 6 0 10TH TSP

+35.63 F/L C/L Special I VOL O.37 1 129 9TH TSP

-8.87 9TH TSP

..n-..

4 BWNT TUBAN II (Version 2.1) 09/21/1994 15:54:34 i

McGuire Nuclear Station - Unit One eeeeeee*

g/g p i

08/94 RFO Bobbin,C/L Special Interest,H/L Special Interest,H/L Tubesheet,U-Bend ATTACHMENT #12 - INDICATIONS OF IMPERFECTIONS INDICATIONS OF IMPERFECTIONS 1

TEST TYPE ROW COL IND %TW VOLTS CHN DEG LOCATION EXTENT 1 C/L Special I VOL 0.43 P 1 26 9TH TSP

-0.04 9TH TSP H/L Tubesheet 35 57 SAI 0.42 1 36 TTS-HL

+0.00 TTS-HL Bobbin 35 58 IDI 71 9.86 P 1 22 TE-HL

+14.19 F/L Bobbin 35 60 NOI 2.62 P 1 71 TE-CL

+17.75 F/L Bobbin 35 61 ODI 1

2.27 4 157 11TH TSP

+2.55 F/L C/L Special I VOL 0.82 1 105 11TH TSP

+1.90 11TH TSP Bobbin 35 63 NOI 0.89 P 1 46 2ND TSP

-0.05 F/L H/L Special I SAI 0.55 1 55 2ND TSP

-0.04 2ND TSP Bobbin 35 68 NOI 1.24 P1 42 TE-CL

+16.27 F/L Bobbin 35 70 ODI 3

1.81 3 140 4TH TSP

+6.04 F/L H/L Special I VOL 0.85 1 149 4TH TSP

+5.84 4TH TSP Bobbin 35 98 NOI 1.56 3 154 11TH TSP

+4.50 F/L C/L Special I VOL 0.60 1 91 11TH TSP

+4.76 11TH TSP Bobbin 36 16 ADI 7.40 6 73 STH TSP

+36.58 F/L H/L Special I VOL 1.09 P 1 125 STH TSP

+36.58 6TH TSP Bobbin 36 29 IDI 69 0.70 P 1 77 TE-HL

+6.62 F/L Bobbin 36 35 WAR 8

0.56 P 4 0 1AVB

+0.00 F/L H/L Tubesheet 36 36 SAI 1.54 2 34 TTS-HL

+0.08 TTS-HL Bobbin 36 38 IDI 72 2.74 P1 73 TE-HL

+4.09 F/L H/L Tubesheet SCI 0.71 1 35 TTS-HL

-0.06 TTS-HL Bobbin 36 72 IDI 77 13.47 P 1 24 TE-HL

+8.70 F/L H/L Tubesheet SAI 1.21 1 18 TTS-HL

-0.05 TTS-HL Bobbin 36 80 NQI 4.78 P 1 155 TE-HL

+16.42 F/L Cobbin 36 89 ADI 2.08 6 80 3RD TSP

+40.51 F/L H/L Special I VOL 1.92 1 160 4TH TSP

+4.90 4TH TSP U42nd 36 93 VOL 0.91 1 156 BTH TSP

+2.75 BTH TSP Bobbin 37 23 WAR 6

0.42 P 4 0 4AVB

+0.00 F/L Bobbin WAR 15 1.01 P 4 0 3AVB

+0.00 F/L Bobbin 37 25 IDI 33 28.54 P 1 11 TTS-CL

+0.15 F/L Boobin 37 26 NQI 0.60 P 1 59 2ND TSP

-0.39 F/L Bobbin IDI 61 16.22 P 1 20 TE-HL

+11.40 F/L Bobbin 37 27 ADI 3.91 6 68 13TH TSP

+6.68 F/L C/L Special I VOL B.00 1 176 13TH TSP

+6.34 12TH TSP H/L Tubesheet 37 30 MCI 0.67 1 64 TTS-HL

-0.08 TTS-HL Bobbin 37 31 ODI 5

0.80 3 142 17TH TSP

+6.00 F/L C/L Special I VOL 0.75 1 104 17TH TSP

+6.00 16TH TSP Bobbin 37 48 WAR 7

0.48 P 4 0 1AVB

+0.00 F/L H/L Tubesheet 37 60 SAI 0.34 1 37 TTS-HL

-0.11 TTS-HL Bobbin 37 66 WAR 13 0.70 P 4 0 1AVB

+0.00 F/L Bobbin 37 67 NOI 0.43 3 43 TTS-HL

+25.66 F/L H/L Tubesheet SAI 1.60 1 22 TTS-HL 4.53 TTS-HL H/L Special I VOL 0.34 1 46 IST TSP

-3.43 IST TSP Bobbin 37 75 WAR 6

0.38 P 4 0 1AVB

+0.00 F/L Bobbin 37 79 ADI 2.81 6 75 11TH TSP

+12.58 F/L C/L Special I VOL 0.54 1 119 11TH TSP

+10.85 11TH TSP Bobbin 37 81 IDI 39 4.51 P 1 102 TE-HL

+16.48 F/L H/L Special I MAI 1.36 1 14 TTS-HL

-8.87 TTS-HL H/L Special I MAI 2.44 1 22 TTS-HL

-4.54 TTS-HL H/L Special I SAI 0.89 1 11 TTS-HL

-5.41 TTS-HL Bobbin 37 86 IDI 68 12.80 P 1 22 TE-HL

+12.71 F/L Bobbin 38 24 IDI 73 11.41 P 1 24 TE-HL

+13.60 F/L Bobbin 38 46 IDI 95 21.28 P 1 42 TE-HL

+16.65 F/L H/L Tubesheet MAI 0.51 1 117 TTS-HL

-3.92 TTS-HL H/L Tubesheet MCI 0.68 1 77 TTS-HL

+0.01 TTS-HL Bobbin 38 53 WAR 13 0.91 P 4 0 1AVB

+0.00 F/L Bobbin IDI 94 11 04 P 1 31 TE-HL

+11.55 F/L Bobbin 38 63 IDI 78 9.98 P 1 64 TE-HL

+13.11 F/L H/L Tubesheet 38 65 SAI 1.88 1 25 TTS-HL

-0.10 TTS-HL Bobbin 38 66 IDI 90 8.29 P 1 48 TE-HL

+12.12 F/L Bobbin 38 67 WAR 6

0.38 P 4 0 1AVB

+0.00 F/L Bobbin 38 69 ADI 2.68 6 90 3RD TSP

+7.68 F/L Bobbin 38 71 ADI 3.82 6 57 TTS-CL

+3.33 F/L C/L Special I VOL 0.49 1 99 TTS-CL

+2.60 TTS-CL Bobbin 38 78 NQI 0.30 3 103 7TH TSP

+7.26 F/L H/L Tubesheet 38 82 SAI 0.74 1 42 TTS-HL

-0.04 TTS-HL

BWNT TUBAH II (Version 2.1) 09/21/1994 15:54:34 McGuire Nuclear Station - Unit Ons

    • eeeeee S/G D 08/94 RFO Bobbin,C/L Special Interest,H/L Special Interest,H/L Tubesheet,U-Bend Page 12 of 14 ATTACID4ENT #12 - INDICATIONS OF IMPERFECTIONS INDICATIONS OF IMPERFECTIONS TEST TYPE ROW COL IND %TW VOLTS CHN DEG LOCATION EXTENT 1 Bobbin 38 98 ODI 26 0.44 3 121 2ND TSP

-1.47 F/L H/L Special I VOL 0.42 1 91 2ND TSP

-1.41 2ND TSP 4

H/L Tubesheet 39 18 SAI 0.68 1 30 TTS-HL

+0.09 TTS-HL l

H/L Tubesheet 39 19 SAI 0.98 1 9 TTS-HL

+0.08 TTS-HL

{

H/L Tubesheet 39 33 SAI 1.11 1 33 TTS-HL

+0.02 TTS-HL l

Bobbin 39 34 IDI 53 7.23 P 1 18 TE-HL

+8.44 F/L Bobbin IDI 87 10.40 P 1 54 TE-HL

+17.73 F/L H/L Tubesheet MAI 3.84 1 33 TTS-HL

-3.86 TTS-HL H/L Tubesheet 39 35 MAI 0.85 1 40 TTS-HL

-0.04 TTS-E Bobbin 39 36 WAR 15 0.91 P 4 0 1AVB

+0.00 F/L Bobbin 39 39 IDI 92 4.75 P 1 61 TE-HL

+9.41 F/L H/L Tubesheet MAI 0.90 1 34 TTS-HL

-0.05 TTS-HL H/L Tubenheet 39 43 SCI 0.73 1 15 TTS-HL

+0.00 TTS-HL Bobbin 39 45 IDI 98 14.02 P 1 37 TE-HL

+9.24 F/L H/L Tubesheet MAI 0.65 1 41 TTS-HL

-0.03 TTS-E H/L Tubesheet 39 46 SCI 0.70 1 78 TTS-HL

-0.07 TTS-HL Bobbin 39 51 WAR 13 0.90 P 4 0 1AVB

+0.00 F/L Bobbin 39 52 IDI 92 18.33 P 1 46 TE-HL

+12.79 F/L Cobbin 39 57 NQI 1.14 P1 41 IST TSP

-0.07 F/L H/L Special I SAI 0.57 1 64 IST TSP

-0.01 IST TSP Bobbin 39 66 WAR 15 0.95 P 4 0 1AVB

+0.00 F/L Bobbin 39 67 IDI 76 6.38 P 1 68 TE-HL

+13.70 F/L H/L Tubesheet 39 70 SAI 1.51 1 44 TTS-HL

-4.53 TTS-HL i

Bobbin 39 72 IDI 81 1.94 P 1 62 TE-HL

+15.37 F/L Bobbin 39 75 IDI 70 1.96 P 1 76 TE-HL

+11.70 F/L Bobbin IDI 93 7.85 P 1 46 TE-HL

+11.24 F/L i

Bobbin 39 84 IDI 94 6.95 P 1 32 TE-HL

+11.87 F/L Bobbin 39 88 NOI 0.55 3 137 TTS-CL

+4.40 F/L Bobbin 39 93 NOI 0.43 3 110 2ND TSP

+31.87 F/L Bobbin 40 21 WAR 15 0.91 P 4 0 2AVB

+0.00 F/L Bobbin 40 38 NQI 2.76 P 1 145 TE-HL

+7.14 F/L Bobbin 40 44 NOI 2.37 P 1 31 TE-CL

+18.96 F/L Bobbin 40 52 IDI 80 7.94 P 1 62 TE-HL

+16.33 F/L H/L Tubesheet SAI 3.12 1 53 TTS-HL

-4.36 TTS-HL H/L Tubesheet 40 53 SAI 0.72 1 20 TTS-HL

-2.73 TTS-HL i

Bobbin 40 61 NQI 1.03 P 1 140 TE-HL

+9.76 F/L l

Bobbin WAR 14 0.87 P 4 0 1AVB

+0.00 F/L Bobbin 40 62 IDI 90 6.72 P 1 50 TE-HL

+12.14 F/L Bobbin 40 66 WAR 16 0.98 P 4 0 1AVB

+0.00 F/L H/L Tubesheet 40 70 SAI 1.62 1 42 TTS-HL

-0.10 TTS -E Bobbin 40 75 IDI 93 15.61 P 1 44 TE-HL

+8.93 F/L Cobbin 40 93 WAR 17 0.96 P 4 0 1AVB

+0.00 F/L Cobbin 40 94 WAR 11 0.55 P 4 0 1AVB

+0.03 F/L Bobbin WAR 12 0.67 P 4 0 2AVB

+0.00 F/L Cobbin 41 23 NOI 0.85 3 152 TTS-CL

+12.66 F/L C/L Special I VOL 0.58 1 157 TTS-CL

+12.66 20TH TSP H/L Tubesheet 41 51 SAI 0.71 1 24 TTS-HL

-0.04 TTS-E Cobbin 41 53 IDI 76 4.84 P 1 64 TE-HL

+15.53 F/L Cobbin 41 55 ODI 25 4.63 3 10 TTS-CL

+19.47 F/L Cobbin 41 70 NOI O.44 P 1 122 2ND TSP

+0.07 F/L Bobbin 41 95 ODI 14 1.05 3 133 TTS-HL

+0.78 F/L Bobbin 42 25 IDI 60 11.50 P 1 18 TE-HL

+16.61 F/L Bobbin 42 36 NQI 2.19 3 16 7TH TSP

+6.01 F/L U-Bend VOL 1.03 1 100 7TH TSP

+5.90 1AVB Bobbin 42 39 ODI 14 0.84 3 133 11TH TSP

+34.60 F/L C/L Special I VOL 1.23 1 15 10TH TSP

-9.50 10TH TSP Cobbin-42 43 NOI 0.40 3 79 9TH TSP

+22.08 F/L C/L Special I VOL 0.68 1 119 8TH TSP

-22.60 BTH TSP Bobbin 42 47 NQI 0.53 3 22 12TH TSP

+11.53 F/L C/L Special I VOL 0.56 1 49 11TH TSP

-10.71 11TH TSP Bobbin 42 51 IDI 98 10.51 P 1 33 TE-HL

+14.70 F/L Bobbin 42 54 NOI 0.35 3 74 16TH TSP

+9.27 F/L C/L Special I VOL 0.39 1 63 16TH TSP

+9.54 16TH TSP H/L Tubesheet 42 70 MAI 3.38 1 17 TTS-HL

-3.58 TTS-HL H/L Tubesheet 42 81 SAI 0.84 1 15 TTS-HL

-1.17 TTS-HL

+.

BUNT TUBAN II (Version 2.1) 09/21/1994 15:54:34 McGuire Nuclear Station - Unit One S/G D 08/94 RFO Bobbin,C/L Special Interest,H/L Special Interest,H/L Tubesheet,U-Bend 5

ATTACHMENT #12 - INDICATIONS OF IMPERFECTIONS INDICATIONS OF IMPERFECTIONS TEST TYPE ROW COL IND %TW VOLTS CHN DEG LOCATION EXTENT 1 Bobbin 42 89 WAR 15 0.86 P 4 0 3AVB

+0.00 F/L Bobbin 43 27 NQI 0.34 3 4 7 10TH TSP

+9.15 F/L Bobbin 43 34 ODI 67 0.52 3 80 CAVB

-2.70 F/L Bobbin 43 37 WAR 16 1.10 P 4 0 3AVB

+0.00 F/L Bobbin 43 38 WAR 14 0.85 P 4 0 2AVB

+0.00 F/L H/L Tubesheet 43 39 SAI 1.02 1 17 TTS-HL

+0.09 TTS-HL Bobbin 43 46 WAR 12 0.79 P 4 0 1AVB

+0.00 F/L Bobbin 43 52 NQI 1.03 3 56 2AVB

+0.39 F/L U-Brnd VOL 1.91 1 155 2AVB

+10.87 2KVB Bobbin 43 55 ODI 48 0.45 3 102 4TH TSP

+36.02 F/L H/L Special I VOL 0 33 1 154 STH TSP

-6.84 STH TSP Bobbin 43 57 NQI 2.97 3 16 14TH TSP

+19.47 F/L Bobbin NOI 4.74 3 16 12TH TSP

+8.74 F/L Bobbin NOI 4.88 3 17 16TH TSP

+15.80 F/L Bobbin NOI 5.54 3 14 11TH TSP

+1.94 F/L Bobbin NQI 7.67 3 15 14TH TSP

+12.49 F/L Bobbin 43 59 ADI 2.10 6 83 3RD TSP

+24.87 F/L Bobbin 43 68 WAR 15 0.87 P 4 0 1AVB

+0.00 F/L Bobbin 43 71 IDI 53 13.21 P 1 17 TE-HL

+5.01 F/L Bobbin IDI 86 6.67 P 1 53 TE-HL

+6.15 P/L Bobbin 44 30 ODI 5

0.86 3 144 STH TSP

+20.79 F/L H/L Special I VOL 1.21 1 125 STH TSP

+20.27 STH TSP Bobbin 44 33 NQI 3.28 P 1 139 TE-HL

+9.88 F/L Bobbin 44 37 ODI 4

1.60 3 144 2ND TSP

+24.10 F/L Bobbin IDI 92 17.86 P 1 36 TE-HL

+15.50 F/L H/L Special I VOL 1.20 1 114 2ND TSP

+24.15 2ND TSP Bobbin 44 49 WAR 14 0.96 P 4 0 1AVB

+0.00 F/L Bobbin 44 53 WAR 17 1.33 P 4 0 1AVB

+0.00 F/L Bobbin 44 54 IDI 29 4.37 P 1 110 TE-HL

+11.12 F/L Bobbin 44 60 WAR 10 0.52 P 4 0 1AVB

+0.00 F/L Bobbin 44 65 ODI 12 1.09 4 137 3RD TSP

+36.13 F/L Bobbin 44 66 WAR 25 1.71 P 4 G 1AVB

+0.00 F/L Bobbin 44 86 NQI 0.27 P 1 119 3RD TSP

+0.00 F/L Bobbin 44 90 IDI 83 2.68 P 1 58 TE-HL

+9.22 F/L Bobbin 45 25 ODI 15 0.83 3 134 9TH TSP

+11.20 F/L C/L Special I VOL 1.11 1 127 9TH TSP

+9.34 9TH TSP Bobbin 45 34 WAR 15 1.10 P 4 0 1AVB

+0.00 F/L Bobbin 45 40 NOI 0.34 P1 44 IST TSP

+0.07 F/L Bobbin 45 48 WAR 8

0.52 P 4 0 1AVB

-0.05 F/L Bobbin 45 52 WAR 15 1.01 P 4 0 1AVB

+0.00 F/L Bobbin 45 57 WAR 25 2.24 P 4 0 1AVB

+0.00 F/L Bobbin 45 59 WAR 28 1.98 P 4 0 1AVB

+0.00 F/L Bobbin 45 60 WAR 16 0.87 P 4 0 1AVB

+0.00 F/L Bobbin WAR 19 1.09 P 4 0 2AVB

+0.00 F/L Bobbin IDI 40 4.21 P 1 107 TE-HL

+5.57 F/L Bobbin 45 61 IDI 12 9.37 P 1 4 TE-HL

+13.24 F/L Bobbin 45 67 IDI 95 7.18 P 1 42 TE-HL

+15.38 F/L Bobbin 45 84 NOI 0.38 P 1 53 2ND TSP

+0.02 F/L H/L Special I SA1 1.05 1 5 2ND TSP

-0.16 2ND TSP Bobbin 46 33 ADI 3.67 6 74 3RD TSP

+27.52 F/L H/L Special I VOL 0.82 1 127 3RD TSP

+27.69 3RD TSP Bobbin 46 38 IDI 93 2.10 P 1 26 TE-HL

+16.36 F/L H/L Tubesheet 46 40 SAI 0.46 1 20 TTS-HL

-0.95 TTS-HL Cobbin 46 48 IDI 95 28.97 P1 35 TE-HL

+5.15 F/L Bobbin 46 60 NQI 0.30 3 90 10TH TSP

+10.85 F/L C/L Special I VOL 0.35 1 122 10TH TSP

+8.87 Eobbin 46 73 ADI 5.29 6 77 13TH TSP

+2.57 F/L 10TH TSP C/L Special I VOL 0.78 1 93 13TH TSP

+2.05 13TH TSP H/L Tubesheet 46 77 SAI 0.92 1 36 TTS-HL

-1.39 TTS-HL

~

Bobbin 46 78 WAR 14 1.06 P 4 0 1AVB

+0.00 F/L H/L Tubosheet 47 32 MAI 0.47 1 28 TTS-HL

-2.02 TTS-HL Cobbin 47 35 NOI 5.15 P 1 145 TE-HL

+14.53 F/L H/L Tubesheet SAI 0.89 1 16 TTS-HL

-3.81 Bobbin 47 36 ODI 15 1.07 3 133 14TH TSP

+12.38 F/L TTS-HL C/L Special I VOL 0.94 1 122 12TH TSP

-9.69 12TH TSP

i BWNT TUBAN II (Version 2.1) 09/21/1994 15:54:34 McGuire Nuclear Station - Unit One S/G D 08/94 RPO Bobbin,C/L Special Interest,H/L Special Interest,H/L Tubesheet,U-Bend ATTACHMENT #12 - INDICATIONS OF IMPERFECTIONS INDICATIONS OF IMPERFECTIONS TEST TYPE ROW COL IND %TW VOLTS CHN DEG LOCATION EXTENT 1 Bobbin 47 42 IDI 95 1.47 P 1 35 TE-HL

+2.60 F/L Bobbin IDI 99 44.56 P 1 29 TE-HL

+1.62 F/L Bobbin 47 44 ODI 4

1.18 3 142 4TH TSP

+8.74 F/L H/L Special I VOL 1.11 1 25 4TH TSP

+8.91 4TH TSP Bobbin 47 71 WAR 20 1.14 P 4 0 1AVB

+0.00 F/L Bobbin 47 78 WAR 19 1.11 P 4 0 1AVB

+0.00 F/L Bobbin WAR 22 1.34 P 4 0 2AVB

+0.00 F/L Bobbin 48 29 ODI 12 0.26 3 133 9TH TSP

+37.82 F/L H/L Tubesheet 48 30 SAI 1.92 1 28 TTS-HL

-3.69 TTS-HL Bobbin 48 52 IDI 86 4.51 P 1 51 TE-HL

+16.32 F/L Bobbin 48 55 NOI 0.20 3 99 17TH TSP

+9.36 F/L Bobbin ODI 18 2.86 3 7 4TH TSP

+9.48 F/L Bobbin ODI 18 2.92 3 7 4TH TSP

+12.41 F/L Bobbin ODI 23 2.22 3 9 4TH TSP

+16.81 F/L Bobbin 48 69 WAR 9

3.00 P 2 0 18TH TSP

+0.00 F/L Bobbin 48 70 WAR 9

2.18 P 2 0 15TH TSP

+0.00 F/L Bobbin 49 36 IDI 56 11.88 P 1 14 TE-HL

+13.54 F/L Bobbin 49 38 NOI 0.68 P 1 129 14TH TSP

+0.11 F/L Bobbin NOI 0.39 P 1 49 TTS-CL

-0.97 F/L Bobbin ODI 23 0.31 P 1 117 16TH TSP

-0.07 F/L C/L Special I VOL 0.57 1 161 14TH TSP

+0.19 11TH TSP C/L Special I VOL 1.09 1 158 16TH TSP

-0.09 16TH TSP Bobbin 49 40 NQI 1.04 P1 44 TE-HL

+17.22 F/L Bobbin 49 43 IDI 30 2.60 P 1 113 TE-HL

+15.33 F/L H/L Tubesheet 49 44 MAI 1.08 1 23 TTS-HL

-0.05 TTS-HL H/L Tubesheet 49 56 SAI 1.25 1 10 TTS-HL

-3.09 TTS-HL Bobbin 49 66 ADI 4.74 6 69 20TH TSP

+5.71 F/L C/L Special I VOL 0.67 1 88 20TH TSP

+5.02 20TH TSP Bobbin 49 69 ODI 38 0.57 P 1 108 17TH TSP

+0.03 F/L Bobbin 49 70 IDI 90 3.63 P 1 49 TE-HL

+3.15 F/L H/L Tubesheet MAI 3.27 1 23 TTS-HL

+0.11 TTS-HL Bobbin 49 78 WAR 10 2.23 P 2 0 17TH TSP

+0.00 F/L Bobbin 49 81 WAR 11 4.44 P2 0 17TH TSP

+0.00 F/L Bobbin 49 83 NOI 0.44 3 111 15TH TSP

-0.91 F/L C/L Special I SAI 0.16 1 71 ISTH TSP

-0.99 8TH TSP Total Indications Found = 880 Total Tubes Found = 576