ML20149F977

From kanterella
Jump to navigation Jump to search

Forwards Request for Addl Info Re Requested Changes to Info Reflected in Amend 43 to Facility Operating License,Issued by NRC on 780113
ML20149F977
Person / Time
Site: Vermont Yankee Entergy icon.png
Issue date: 07/18/1997
From: Jabbour K
NRC (Affiliation Not Assigned)
To: Reid D
VERMONT YANKEE NUCLEAR POWER CORP.
References
TAC-M92933, NUDOCS 9707220392
Download: ML20149F977 (3)


Text

1 g July 18,1997 '

r Mr. Donald A. Reid Vice President, Operations Vermont Yankee Nuclear Power Corporation-Ferry Road Brattleboro, VT 05301

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION REGARDING: (1) THE REMOVAL OF FIRE RATING ON CONTROL ROOM (FLOOR) TO CABLE VAULT (CEILING)

ELECTRICAL PENETRATION BARRIER, AND (2) THE RE-DESIGNATION OF CONTROL ROOM, CABLE VAULT, AND BATTERY ROOM AS A SINGLE FIRE AREA -

VERMONT YANKEE NUCLEAR POWER STATION (TAC N0..M92933)

Dear Mr. Reid:

By letter dated July 13, 1995, Vermont Yankee Nuclear Power Corporation requested changes to the information reflected in Amendment 43 to Facility Operating License, issued by the U.S. Nuclear Regulatory Commission (NRC) on January 13, 1978, regarding the above subject.

The NRC staff has reviewed your submittal, and, based on its review, finds that responses to the enclosed request for additional information are needed before we can complete our review. This request was discussed with your staff via a telephone conference on July _15, 1997.

1 Please provide your responses within 30 days from the date of this letter. If you have any questions regarding this matter, please contact me at (301) 415-1496. l Sincerely, (Original Signed By)

Kahtan N. Jabbour, Sr. Project Manager Project Directorate I-3 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation Docket No. 50-271

Enclosure:

Request for Additional

.Information ;l cc: See next page h

Distribution Docket File JZwolinski OGC PUBLIC REaton ACRS PDI-3 RF Slittle CCowgill BBoger .KJabbour' MSalley.

co E Nh . e 1 i N o O M .i o**e**d" *" sd'EsNEsN7mli' ' * **[U *""

~

0FFICE PM:PDI-3 lC LA:PDI-h/ l e ( A)D:PDI-3 /MW l NAME KJabbour , ,A Slit 41W L v REaton /Ny/V DATE 07//8/97 5 "

07//rf/97

  • 07//fr/97 */

OFFICIAL RECORLi COPY ll!N(NfbfkNNh e, , , * '" "9707220392 970718 "  % E MM Y

'*** PDR ADOCK 05000271 P PDR

p.

t e

Vermont Yankee Nuclear Power Vermont Yankee Nuclear Power Station Corporation cc:

Mr. Peter LaPnrte, Director Regional Administrator, Region I ATTN: James Muckerheide U. S. Nuclear Regdatory Commission Massachusetts Emergency Management 475 Allendale Road Agency King of Prussia, PA 19406 400 Worcester Rd.

P.O. Box 1496 R. K. Gad, III Framingham, MA 01701-0317 Ropes & Gray One International Place Mr. Raymond N. McCandless Boston, MA 02110-2624 Vermont Division of Occupational and Radiological Health Mr. Richard P. Sedano, Commissioner Administration Building Vermont Department of Public Service Montpelier, VT 05602 l 120 State Street, 3rd Floor Montpelier, VT 05602 Mr. J. J. Duffy ,

Licensing Engineer 1 Public Service Board Vermont Yankee Nuclear Power I State of Vermont Corporation I 120 State Street 580 Main Street Montpelier, VT 05602 Bolton, MA 01740-1398 Chairman, Board of Selectmen Mr. Robert J. Wanczyk Town of Vernon Director of Safety and Regulatory P.O. Box 116 Affairs Vernon, VT 05354-0116 Vermont Yankee Nuclear Power Corp.

Ferry Road Mr. Richard E. McCullough Brattleboro, VT 05301 Operating Experience Coordinator i Vermont Yankee Nuclear Power Station Mr. Ross B. Barkhurst, President l P.O. Box 157 Vermont Yankee Nuclear Power Governor Hunt Road Corporation Vernon, VT 05354 Ferry Road .

Brattleboro, VT 05301 l G. Dana Bisbee, Esq. '

Deputy Attorney General Mr. Gregory A. Maret, Plant Manager 33 Capitol Street Vermont Yankee Nuclear Power Station Concord, NH 03301-6937 P.O. Box 157 Governor Hunt Road Resident Inspector Vernon, VT 05354 Vermont Yankee Nuclear Power Station U.S. Nuclear Regulatory Commission P.O. Box 176 Vernon, VT 05354 Chief, Safety Unit Office of the Attorney General One Ashburton Place, 19th Floor Boston, MA 02108

C J

BE0 VEST FOR ADDITIONAL INFORMATION BY THE OFFICE OF NUCLEAR REACTOR REGULATION VERMONT YANKEE NUCLEAR POWER STATION DOCKET NO. 50-271

1. Please confirm that post-fire safe shutdown can be achieved and maintained for a single fire that simultaneously disables the main control room (MCR) cable vault (cable spreading room) and the battery room. Also confirm that post-fire safe shutdown can be achieved and maintained for a single fire that disables the switch gear rooms.
2. Please verify that the barrier installed between the NCR and the cable vault will be maintained in its current configuration (or proposed i alternative) and describe the plant procedures that will be used to '

control the proposed redesignated barrier (e.g., surveillance / inspection requirements, QA requirements, compensatory measures, maintenance, I etc.).  !

3. Please verify that the redesignated fire barriers will be maintained as fire zone separation barriers and provide the actual (or estimated) fire ratings of the barriers.

l l

l l

l ENCLOSURE