ML20149F310

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-498/87-74 & 50-499/87-74 on 871121-880115.No Violations or Deviations Noted
ML20149F310
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 02/10/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Goldberg J
HOUSTON LIGHTING & POWER CO.
Shared Package
ML20149F314 List:
References
NUDOCS 8802170004
Download: ML20149F310 (2)


See also: IR 05000498/1987074

Text

..

In Reply Refer To: FEB l0 W

Dockets: 50-498/87-74

50-499/87-74

Houston Lighting & Power Company

ATTN: J. H. Goldberg,

Group Vice President, Nuclear

P.O. Box 1700

Houston, Texas 77001

Gentlemen:

This refers to the inspection conducted by Messrs. C. E. Johnson and

O. L. Garrison of this office during the period November 21, 1987, through

January 15, 1988, of activities authorized by NRC Operating License NPF-71 and

Construction Permit CPPR-129, for the South Texas Project, Units 1 and 2, and

to the discussion of our findings with Mr. J. T. Westermeier and other members

of your staff at the conclusion of the inspection.

Areas examined during the inspection included site tours, fastener testing, and

reactor internals. Within these areas, the inspection consisted of selective

examination of procedures and representative records, interviews with

personnel, and observations by the NRC inspectors. The inspection findings are

documented in the enclosed inspection report.

Within the scope of the inspection, no violations or deviations were

identified.

We have also examined actions you have taken with regard to previously

identified inspection findings. The status of these items is identified in

paragraph 3 of the enclosed report.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely,

Origin.d Signed By

A.B.Ucach

..

L. J. Callan, Director

-

Division of Reactor Projects

Enclosure: (see next page)

9

R I D C: P D:C I W

nson/1r L 'ison GL ble Jd n

%y '/88 4 g/88 s-/f/88 Z/10/88 j

\s\ \

8802170004 880210

PDR . */ '

O ADOCK 05000498 ~

DCD

,

  • . l

Houston Lighting & Power Company -2- )

l

l

Enclosure:  !

Appendix - NRC Inspection Report l

50-498/87-74

50-499/87-74 i

cc w/ enclosure: l

Houston Lighting & Power Company I

ATTN: M. Wisenberg, Manager,  !

Nuclear Licensing .

P.O. Box 1700 =

Houston, Texas 77001  ;

Houston Lighting & Power Company ,

ATTN: G. Vaughn, Vice President, '

Nuclear Operations

P.O. Box 1700

Houston, Texas 77001

Central Power & Light Company

ATTN: R. L. Range /R. P. Verret

P.O. Box 2121

Corpus Christi, Texas 78403

City Public Service Board

ATTN: R. J. Costello/M. T. Hardt

P.O. Box 1771

San Antonio, Texas 78296

,

City of Austin

ATTN: M. B. Lee /J. E. Malaski '

P.O. Box 1088

Austin, Texas 78767-8814 ,

i

Texas Radiation Control Program Director  !

I

bec: DM8 (IE01) I

bec distrib.5by

RIV: I

  • DRP *RRI-OPS

R. D. Martle', RA *RRI-CONST.

  • Section Chief (DRP/0) RPSB-DRSS '
  • MIS System *RIV File
  • Lisa Shea, RM/ALF *RSTS Operator
  • R. Bachmann, OGC *H. Bundy
  • P. Kadambi, NRR Project Manager *R. Hall 1
  • TSS D. Powers
  • DRS

w/766

I