ML20149E961
| ML20149E961 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 01/06/1988 |
| From: | Wright G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Gerstner W ILLINOIS POWER CO. |
| Shared Package | |
| ML20149E965 | List: |
| References | |
| NUDOCS 8801140075 | |
| Download: ML20149E961 (2) | |
Text
_
q s.
A o
JAN 6 1983 Docket No. 50-461 Illinois Power Company ATTN:
Mr. W. C. Gerstner
. Executive Vice President 500 South 27th Street Decatur, IL 62525 Gentlemen:
SUBJECT:
EXAMINATION REPORT the NRC administered examinations to-On October 27 through November 6,1987, d for licenses to operate your Clinto employees of your company who had applie i
Nuclear Plant.
At the conclusion of the examination, the examination questions-and preliminary findings were discussed with those members of your staff identified in the enclosed report.
t One generic weakness was identified in the senior operator candidates' use of the Emergency Operating Procedures.
They failed to actively use the procedures during or following simulated emergency situations to verify corrective actions complied with the procedures.
You are requested to provide a written response to the generic finding to our office within 60 days to facilitate it's resolution being included in the next Systematic Assessment of Licensee Performance (SALP) Report.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and the enclosures will be placed in the NRC Public Document Room.
Should you have any questions concerning this examination, please contact us.
Sincerely, OR!GmAt. SIGNED BY GE0ffREY C. WRIGlfI Geoffrey C. Wright, Chief Operations Branch
Enclosures:
1.
Examination Report No. 8701 Examination (s))and(SR0/R0) 2.
AnswerKey(s 3.
Facility Couents and Resolutions 4.
Simulator Fidelity Report See Attached Distribution aI i
h IIIb W
i RI R:
I RIII -
i i
j 8801140075 880106 l L -l) El I///f th)f(b
[hf j
orgen/jlr ick-KI1op,#
r Nt PDR ADOCK 05000461 J
(V DCD 3
t
.I Illinois Power Company 2
'jAN 6 688 Distribution cc w/ enclosures:
DCD/DCB (RIDS) i Licensing Fee Management Branch l
Resident Inspector, RIII Roy Wight, Manager Nuclear Facility Safety Mark Jason, Assistant Attorney General, Environmental Control Division Richard Hubbard J. W. McCaffrey, Chief, Public Utilities Division H. S. Taylor, Quality Assurance Division David Rosenblatt, Governor's Office of Consumer Services E. Tills, Plant Training Manager J. N. Hannon, Branch Chief, OLB B. Siegel, Project Manager, NRR A. J. Vinnola, Contract Exam Supervisor, (INEL)
R. W. Cooper, NRR
'