Forwards Insp Rept 50-298/87-31 on 871201-21.Violation Noted.Enforcement Conference Scheduled on 870120 to Coincide W/Enforcement Conference Re Security Matters Discussed in 871229-30 Telcons
ML20149E791
Person / Time
Site: Cooper Entergy icon.png
Issue date: 01/08/1988
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Trevors G
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20149E795 List:
References
EA-88-002, EA-88-2, NUDOCS 8801140017
Download: ML20149E791 (2)


See also: IR 05000298/1987031

Text

. __ - . ,- . , _ -

' '

o

,

'

i 2 ,

,

In Reply Refer To: N D

Docket: 50-276/87-31 j

> EA 88-02

l-

. Nebraska Public Power District

ATTN: George A.:Trevors

Division Manager - Nuclear Support

P. O. Box 499 ,

Columbus, NE 68601'

,

Gentlemen:

' '

This refers to the inspection conducted by liessrs. W. R. Bannett and

E. A. Plettner of this office during the period December 1-21, 1987, of

activities authorized by NRC Operating License COR-46 for Cooper Nuclear

Station and to the discussion of our findings with you and other. members of

your staff at the conclusion _of the inspection. .

Areas examined during the-inspection included operational safety verification,

mon +hly surveillance and maintenance observations, ridiological protection,

cold weather preparation, and security. Within these areas, the inspe.ction

consisted of selective examination of pro >edures and representative records,

interviews with personnel, and observations by the inspectors. The inspection  ;

findings are documented in the enclosed inspection. report.

,

During this inspection, it was found that certain of your activities appeared ,

to be in violation of HRC requirements. As discussed in our telephone

conversation on January 4,1988, with you, we have scheduled an enforcement

conference for Ja % ory 20, 1988, in our office to discuss your understanding of ,

this apparent violation, the reasons for occurrence, and your corrective

actions. We will also discuss the Enforcement Policy, if appropriate. The

4

enforcement conference will coincide with an enforcement conference regarding ,

security matters which were discussed with you in our telephone conversetions

on December 29 and 30, 1987. An agenda for this meeting is being forwarded

under separate cover.

~

One open item is identified in paragraph 3 cf the enclosed inspection report, f

Should you have any questions concerning this inspection, we will be pleased to

. discuss them with you.

Sincerely,

' Original Sfgr.:2"

A. B. Ucarli ';.

L. J. Callan. [Hrector l

'

Division of, Reactor Projects i

i

Enclosure: (Seenextpage) , l

RIV:RI b RIV:SRIhv C:RPB/ E0 h #

b [

D: 9JP

'

l

2 EAPlett'ner/sn WRBennett EJHoller DAPowers Lu callar. 1

/ / 7 /88 / /7 /88 / / 7/88 / / 7 /88 i / 7 /88

8801140017 880108

PDR ADOCK 05000298

0 DCD l  ;

_ _ _._,~ _. _ _ _ _ _._ _-. _ - _ ___

-

.

g 4

i

.

'

Nebraska Public Power District -2-

Enclosure:

Appendix - NRC Inspection Report

50-298/87-31

cc w/ enclosure:

Guy R. Horn, Division Manager

of Nuclear Operations

Cooper Nuclear Station

P. O. Box 98

Brownville, Nebraska 68321

Kansas Radiation Control Program Director

Nebraska Radiation Control Program Director

bec to DMB (IE01)

bec distribution by RIV:

  • RRI R. D. Martin, RA
  • SectionChief(DRP/C) *Lisa Shea, RM/ALF

RPSB-DRSS * MIS System

  • RIV File * Project Engineer, DRP/C
  • RSTS Operator *W. Long, NRR Project Manager
  • R. Hall *DRS
  • TSS *DRP
  • D Powers, E0

H. Scott

J. Liebsrnan, OE

  • w/766

!