Advises That Special Rept Re Three 880115 Invalid Failures of Diesel Generator 2B Will Be Delayed Until 880229 to Allow Addl Investigation Time
ML20149E555
Person / Time
Site: Catawba Duke Energy icon.png
Issue date: 01/04/1988
From: Tucker H
DUKE POWER CO.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8802110138
Download: ML20149E555 (1)


Text

_.. - - - -., _ _

Duxs Powna GOMPANY P.O. BOX 33189 chant. orts. N.O. 98949 liALB. TUCKER 1rstarssown (704) 373 4804 TM2 POSS.ssWT swaun receumon January 4, 1988 4

Document Control Desk

' U. S.~ Nuclear Regulatory Commission

- Washington, D. c.

20555

Subject:

Catawba Nuclear Station, Unit 2 Docket No. 50-414 Special Report Concerning a Diesel Generator 2B Invalid Failures on January 15, 1988 Gentlemen:

Please be advised that submittal of a Special Report concerning three' January 15, 1988 invalid failures of Unit 2 Diesel Generator 2B will be delayed until February 29, 1988. Submittal of this report was originally scheduled for January 12, 1988.. The extension is required to allow Duke Power personnel in charge of the investigation sufficient time to review the failures. This event is reportable pursuant to Technical Specification 3/4.8.1.1.3 and 6.9.2.

Very truly yours, h-Hal B. Tucker JGT/1324/sbn xc:

Dr. J. Nelson Grace, Regional Administrator U. S. Nuclear Regulatory Commission Region II 101 Marietta Street, NW, Suite 2900 Atlanta, Georgia 30323 Mr. P. K. Van Doorn NRC Resident Inspector Catawba Nuclear Station 8802110138OgMg4 PDR ADOCK O PDR k