|
---|
Category:OPERATING LICENSES-APPLIATION TO AMEND-RENEW EXISTING
MONTHYEARML20206R0531999-05-13013 May 1999 Application for Amends to Licenses DPR-42 & DPR-60,removing Plant Organization Structure Requirement ML20205S3291999-04-20020 April 1999 Application for Amends to Licenses DPR-42 & DPR-60,changing Implementation Date for Relocation from TS to UFSAR of Requirements in TS 3.1.E & Flooding Shutdown Requirements in TS 5.1 ML20205Q0261999-04-12012 April 1999 Application for Amends to Licenses DPR-42 & DPR-60, Relocating Shutdown Margin Requirements from TS to COLR ML20204H3491999-03-19019 March 1999 Application for Amends to Licenses DPR-42 & DPR-60,removing Dates of Two NRC SERs & Correcting Date of One SER Listed in Section 2.C.4, Fire Protection ML20207F2771999-03-0101 March 1999 Revised Application for Amends to Licenses DPR-42 & DPR-60, Incorporating Combustion Engineering SG Welded Tube Sleeve TR Rev ML20203A1051999-02-0505 February 1999 Application for Amends to Licenses DPR-42 & DPR-60, Incorporating Changes to ABB-CE Sleeve Design Assumptions & Installation Techniques ML20196B9571998-11-25025 November 1998 Application for Amends to Licenses DPR-42 & DPR-60,allowing Limited Inoperability of Bast Level Channels & Transfer Logic Channels to Provide for Required Testing & Maint of Associated Components ML20155D9581998-10-30030 October 1998 Application for Amends to Licenses DPR-42 & DPR-60,to Revise License Condition 7 to Include Extended Implementation Date of 990901 ML20154S2061998-10-23023 October 1998 Application for Amends to Licenses DPR-42 & DPR-60, Clarifying Conditions That Constitute Operable Irpi Sys Channels ML20154F7731998-10-0101 October 1998 Suppl 16 to License Amend Request to Licenses DPR-42 & DPR-60,replacing Paragraph for USAR Page 10.4-7 & Page 10.4-7 Annotated Showing Which Paragraph Replaced ML20151Z8891998-09-15015 September 1998 Suppl 15 to 970129 Application for Amend to Licenses DPR-42 & DPR-60,revising Cooling Water Sys Emergency Intake Design Bases ML20151U3471998-09-0404 September 1998 Application for Amends to Licenses DPR-42 & DPR-60, Clarifying SRs & LCOs for Operability for Reactor Coolant Vent Sys ML20237B5001998-08-12012 August 1998 Suppl 8 to 951214 LAR for Licenses DPR-42 & DPR-60,providing Addl Info to Support Conformance of Administrative Controls Section 6 to Guidance of Std Tech Specs ML20236T9801998-07-24024 July 1998 Supplemental Application for Amends to Licenses DPR-42 & DPR-60,providing Suppl Info in Support of 980129 Amend Request Re Cooling Water Sys Emergency Intake Design Bases ML20249A7601998-06-11011 June 1998 Suppl 7 to 951214 LAR for Amends to Licenses DPR-42 & DPR-60,showing Tech Specs Pages Annotated to Incorporate Changes Proposed in Suppl ML20248M1911998-05-29029 May 1998 Supplemental Application for Amend to License DPR-42, Providing Updated Flux Mapping Results for Cycle 19 ML20216G0331998-04-13013 April 1998 Application for Amends to Licenses DPR-42 & DPR-60, Supplementing LAR ML20216D0221998-03-0606 March 1998 Application for Amends to Licenses DPR-42 & DPR-60,updating Heatup & Cooldown Rate Curves,Incorporating Use of Pressure & Temp Limits Rept & Changing Pressurizer PORVs Operability Temp ML20217N9941998-03-0404 March 1998 Supplemental LAR to Licenses DPR-42 & DPR-60,providing Status of Relocated Tech Specs Requirements ML20217N9671998-03-0202 March 1998 Application for Amends to Licenses DPR-42 & DPR-60,revising TS 3.8.D Re Spent Fuel Pool Special Ventilation Sys ML20217P9811998-03-0202 March 1998 Suppl to LAR to Licenses DPR-42 & DPR-60,supporting License Amend Request Re Conformance of Administrative Controls Section 6 to Guidance of Std ML20203J9531998-02-27027 February 1998 Application for Amends to Licenses DPR-42 & DPR-60,modifying AMSAC W/Addition of Diverse Scram Feature as Described in Exhibit A.Nrc Approval Is Requested by 980907 ML20202E5571998-02-10010 February 1998 Application for Amends to Licenses DPR-42 & DPR-60,revising TS 1-1 Re One Time Reduction of Mode 6 Reactor Coolant Sys Boron Concentration ML20198N8241998-01-15015 January 1998 Application for Amends to Licenses DPR-42 & DPR-60, Respectively.Amends Proposes one-time Only Changes Allowing Use of Moveable Incore Detector Thimble Reduction for Unit 1 Cycle 19 ML20198P0741998-01-0808 January 1998 Suppl 5 to 951214 LAR to Licenses DPR-42 & DPR-60 Re Proposed Changes to TS Section 6 ML20198B1401997-12-29029 December 1997 Application for Amends to Licenses DPR-42 & DPR-60, Respectively.Amends Provide Changes to TS Pages Associated w/951214 LAR ML20212F9711997-10-28028 October 1997 Supplemental Application for Amend to Licenses DPR-42 & DPR-60 Re Cooling Water Sys Emergency Intake Design Bases ML20217F4711997-10-0303 October 1997 Suppl Application for Amend to Licenses DPR-42 & DPR-60, Allowing Use of New SG Tube Sleeve Designs & Installation & Exam Techniques ML20211H7431997-10-0101 October 1997 Suppl Application for Amends to Licenses DPR-42 & DPR-60, Allowing Physical Mods to Turbine Bldg Cooling Water Header Isolation Logic ML20217C5801997-09-26026 September 1997 Application for Amends to Licenses DPR-42 & DPR-60.Amend Proposes Changes to TS 3.4.B to Change Minimum Conditions for AFW & Permit Startup Operations to Continue W/Inoperable Turbine Driven AFW Pump or Associated Sys Valves ML20216E4461997-09-0404 September 1997 Application for Amends to Licenses DPR-42 & DPR-90,providing Supplemental Info Which Supports Conformance of TS Overtime to NRC Guidance Issued 950409 ML20217M5961997-08-15015 August 1997 Suppl to LAR Dtd 961127,incorporating C-E SG Welded Tube Sleeve Topical Rept CEN-629-P,Rev 1.Proprietary & non-proprietary TRs CEN-629-P,encl.Proprietary Rept Withheld Per 10CFR2.790.Affidavit,encl ML20148Q9491997-06-30030 June 1997 Application for Amends to Licenses DPR-42 & DPR-60,providing Suppl 9 to LAR Re Amend of CWS Emergency Intake Design Bases ML20141F4851997-05-15015 May 1997 Application for Amends to Licenses DPR-42 & DPR-60, Requesting Proposes Changes to Tech Specs 3.1.C, Reactor Coolant Sys Leakage & 4.12, SG Tube Surveillance ML20141A0751997-05-0707 May 1997 Application for Amends to Licenses DPR-42 & DPR-60,amending Spent Fuel Pool Special Ventilation Sys ML20138G4161997-04-29029 April 1997 Application for Amends to Licenses DPR-42 & DPR-60, Supplementing 970129 Application Re Rev to Cooling Water Sys Emergency Intake Design Bases ML20137T2031997-04-10010 April 1997 Application for Amends to Licenses DPR-42 & DPR-60, Clarifying Amend Request Re Conformance of Administrative Controls Section 6 to Guidance of STS ML20137D9041997-03-20020 March 1997 Application for Amends to Licenses DPR-42 & DPR-60,providing Supplemental Info to Amend Re Cooling Water Sys Emergency Intake Design Bases ML20136H0041997-03-11011 March 1997 Application for Amends to Licenses DPR-42 & DPR-60,providing Suppl Info to Support Amend Re CWS Emergency Intake Design Bases ML20136F5131997-03-10010 March 1997 Application for Amends to Licenses DPR-42 & DPR-60,revising CWS Emergency Intake Design Bases ML20135F7441997-03-0707 March 1997 Suppl 3 to Application for Amends to Licenses DPR-42 & DPR-60 Re Cooling Water Sys Emergency Intake Design Bases ML20135A9371997-02-21021 February 1997 Application for Amends to Licenses DPR-42 & DPR-60,allowing Use of Credit for Soluble Boron in Spent Fuel Pool Criticality Analyses ML20134J6211997-02-0606 February 1997 Application for Amends to Licenses DPR-42 & DPR-60,revising Restrictions on Safety Injection Sys Operations When Reactor Coolant Sys Is at Low Temperatures ML20134E9341997-01-29029 January 1997 Application for Amend to Licenses DPR-42 & DPR-60,revising TS Re Cooling Water Sys Emergency Intake Design Bases. Subj Amends Base on Response to Notice of Violations Noted Noted in Insp Repts 50-282/96-15 & 50-306/96-15 ML20135A8191996-11-27027 November 1996 Application for Amends to Licenses DPR-42 & DPR-60,revising TS 4.12, SG Tube Surveillance & TS Section B-4-12 ML20134H3641996-11-0606 November 1996 Application for Amends to Licenses DPR-42 & DPR-60, Requesting Rev to Appendix a Re Cooling Water Sys ML20134E4451996-10-25025 October 1996 Application for Amends to Licenses DPR-42 & DPR-60,changing TS 4.4.A, Containment Leakage Tests, Bases to TS Section B.4.4, Containment Sys Tests & Adding TS.6.5.J, Containment Leakage Rate Testing Program ML20129E2451996-09-24024 September 1996 Application for Amends to Licenses DPR-42 & DPR-60, Respectively,Changing TS 4.12, SG Tube Surveillance, to Incorporate Revised Acceptance Criteria for SG Tubes W/ Degradation in Tubesheet Region ML20117P4291996-09-11011 September 1996 Application for Amends to Licenses DPR-42 & DPR-60,revising Plant TS Governing Cw Sys ML20117B2341996-08-15015 August 1996 Application for Amends to Licenses DPR-42 & DPR-60,revising TS 3.3.B.2 Re Containment Cooling Sys & Bases to Conform to Supporting Analyses 1999-05-13
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARML20211K6101999-08-31031 August 1999 Application for Amend to License SNM-2506,proposing Change to License Conditions 6,7 & 8 & TSs to App a of License by Permitting Inclusion of Bpras & Thimble Plug Devices in Sf Assemblies Stored in TN-40 Casks ML20206R0531999-05-13013 May 1999 Application for Amends to Licenses DPR-42 & DPR-60,removing Plant Organization Structure Requirement ML20205S3291999-04-20020 April 1999 Application for Amends to Licenses DPR-42 & DPR-60,changing Implementation Date for Relocation from TS to UFSAR of Requirements in TS 3.1.E & Flooding Shutdown Requirements in TS 5.1 ML20205Q0261999-04-12012 April 1999 Application for Amends to Licenses DPR-42 & DPR-60, Relocating Shutdown Margin Requirements from TS to COLR ML20204H3491999-03-19019 March 1999 Application for Amends to Licenses DPR-42 & DPR-60,removing Dates of Two NRC SERs & Correcting Date of One SER Listed in Section 2.C.4, Fire Protection ML20207F2771999-03-0101 March 1999 Revised Application for Amends to Licenses DPR-42 & DPR-60, Incorporating Combustion Engineering SG Welded Tube Sleeve TR Rev ML20203A1051999-02-0505 February 1999 Application for Amends to Licenses DPR-42 & DPR-60, Incorporating Changes to ABB-CE Sleeve Design Assumptions & Installation Techniques ML20196B9571998-11-25025 November 1998 Application for Amends to Licenses DPR-42 & DPR-60,allowing Limited Inoperability of Bast Level Channels & Transfer Logic Channels to Provide for Required Testing & Maint of Associated Components ML20155D9581998-10-30030 October 1998 Application for Amends to Licenses DPR-42 & DPR-60,to Revise License Condition 7 to Include Extended Implementation Date of 990901 ML20154S2061998-10-23023 October 1998 Application for Amends to Licenses DPR-42 & DPR-60, Clarifying Conditions That Constitute Operable Irpi Sys Channels ML20154F7731998-10-0101 October 1998 Suppl 16 to License Amend Request to Licenses DPR-42 & DPR-60,replacing Paragraph for USAR Page 10.4-7 & Page 10.4-7 Annotated Showing Which Paragraph Replaced ML20151Z8891998-09-15015 September 1998 Suppl 15 to 970129 Application for Amend to Licenses DPR-42 & DPR-60,revising Cooling Water Sys Emergency Intake Design Bases ML20151U3471998-09-0404 September 1998 Application for Amends to Licenses DPR-42 & DPR-60, Clarifying SRs & LCOs for Operability for Reactor Coolant Vent Sys ML20237B5001998-08-12012 August 1998 Suppl 8 to 951214 LAR for Licenses DPR-42 & DPR-60,providing Addl Info to Support Conformance of Administrative Controls Section 6 to Guidance of Std Tech Specs ML20236T9801998-07-24024 July 1998 Supplemental Application for Amends to Licenses DPR-42 & DPR-60,providing Suppl Info in Support of 980129 Amend Request Re Cooling Water Sys Emergency Intake Design Bases ML20249A7601998-06-11011 June 1998 Suppl 7 to 951214 LAR for Amends to Licenses DPR-42 & DPR-60,showing Tech Specs Pages Annotated to Incorporate Changes Proposed in Suppl ML20248M1911998-05-29029 May 1998 Supplemental Application for Amend to License DPR-42, Providing Updated Flux Mapping Results for Cycle 19 ML20216G0331998-04-13013 April 1998 Application for Amends to Licenses DPR-42 & DPR-60, Supplementing LAR ML20216D0221998-03-0606 March 1998 Application for Amends to Licenses DPR-42 & DPR-60,updating Heatup & Cooldown Rate Curves,Incorporating Use of Pressure & Temp Limits Rept & Changing Pressurizer PORVs Operability Temp ML20217N9941998-03-0404 March 1998 Supplemental LAR to Licenses DPR-42 & DPR-60,providing Status of Relocated Tech Specs Requirements ML20217P9811998-03-0202 March 1998 Suppl to LAR to Licenses DPR-42 & DPR-60,supporting License Amend Request Re Conformance of Administrative Controls Section 6 to Guidance of Std ML20217N9671998-03-0202 March 1998 Application for Amends to Licenses DPR-42 & DPR-60,revising TS 3.8.D Re Spent Fuel Pool Special Ventilation Sys ML20203J9531998-02-27027 February 1998 Application for Amends to Licenses DPR-42 & DPR-60,modifying AMSAC W/Addition of Diverse Scram Feature as Described in Exhibit A.Nrc Approval Is Requested by 980907 ML20202E5571998-02-10010 February 1998 Application for Amends to Licenses DPR-42 & DPR-60,revising TS 1-1 Re One Time Reduction of Mode 6 Reactor Coolant Sys Boron Concentration ML20198N8241998-01-15015 January 1998 Application for Amends to Licenses DPR-42 & DPR-60, Respectively.Amends Proposes one-time Only Changes Allowing Use of Moveable Incore Detector Thimble Reduction for Unit 1 Cycle 19 ML20198P0741998-01-0808 January 1998 Suppl 5 to 951214 LAR to Licenses DPR-42 & DPR-60 Re Proposed Changes to TS Section 6 ML20198B1401997-12-29029 December 1997 Application for Amends to Licenses DPR-42 & DPR-60, Respectively.Amends Provide Changes to TS Pages Associated w/951214 LAR ML20212F9711997-10-28028 October 1997 Supplemental Application for Amend to Licenses DPR-42 & DPR-60 Re Cooling Water Sys Emergency Intake Design Bases ML20217F4711997-10-0303 October 1997 Suppl Application for Amend to Licenses DPR-42 & DPR-60, Allowing Use of New SG Tube Sleeve Designs & Installation & Exam Techniques ML20211H7431997-10-0101 October 1997 Suppl Application for Amends to Licenses DPR-42 & DPR-60, Allowing Physical Mods to Turbine Bldg Cooling Water Header Isolation Logic ML20217C5801997-09-26026 September 1997 Application for Amends to Licenses DPR-42 & DPR-60.Amend Proposes Changes to TS 3.4.B to Change Minimum Conditions for AFW & Permit Startup Operations to Continue W/Inoperable Turbine Driven AFW Pump or Associated Sys Valves ML20216E4461997-09-0404 September 1997 Application for Amends to Licenses DPR-42 & DPR-90,providing Supplemental Info Which Supports Conformance of TS Overtime to NRC Guidance Issued 950409 ML20217M5961997-08-15015 August 1997 Suppl to LAR Dtd 961127,incorporating C-E SG Welded Tube Sleeve Topical Rept CEN-629-P,Rev 1.Proprietary & non-proprietary TRs CEN-629-P,encl.Proprietary Rept Withheld Per 10CFR2.790.Affidavit,encl ML20148Q9491997-06-30030 June 1997 Application for Amends to Licenses DPR-42 & DPR-60,providing Suppl 9 to LAR Re Amend of CWS Emergency Intake Design Bases ML20141F4851997-05-15015 May 1997 Application for Amends to Licenses DPR-42 & DPR-60, Requesting Proposes Changes to Tech Specs 3.1.C, Reactor Coolant Sys Leakage & 4.12, SG Tube Surveillance ML20141A0751997-05-0707 May 1997 Application for Amends to Licenses DPR-42 & DPR-60,amending Spent Fuel Pool Special Ventilation Sys ML20138G4161997-04-29029 April 1997 Application for Amends to Licenses DPR-42 & DPR-60, Supplementing 970129 Application Re Rev to Cooling Water Sys Emergency Intake Design Bases ML20137T2031997-04-10010 April 1997 Application for Amends to Licenses DPR-42 & DPR-60, Clarifying Amend Request Re Conformance of Administrative Controls Section 6 to Guidance of STS ML20137D9041997-03-20020 March 1997 Application for Amends to Licenses DPR-42 & DPR-60,providing Supplemental Info to Amend Re Cooling Water Sys Emergency Intake Design Bases ML20136H0041997-03-11011 March 1997 Application for Amends to Licenses DPR-42 & DPR-60,providing Suppl Info to Support Amend Re CWS Emergency Intake Design Bases ML20136F5131997-03-10010 March 1997 Application for Amends to Licenses DPR-42 & DPR-60,revising CWS Emergency Intake Design Bases ML20135F7441997-03-0707 March 1997 Suppl 3 to Application for Amends to Licenses DPR-42 & DPR-60 Re Cooling Water Sys Emergency Intake Design Bases ML20135A9371997-02-21021 February 1997 Application for Amends to Licenses DPR-42 & DPR-60,allowing Use of Credit for Soluble Boron in Spent Fuel Pool Criticality Analyses ML20134J6211997-02-0606 February 1997 Application for Amends to Licenses DPR-42 & DPR-60,revising Restrictions on Safety Injection Sys Operations When Reactor Coolant Sys Is at Low Temperatures ML20134E9341997-01-29029 January 1997 Application for Amend to Licenses DPR-42 & DPR-60,revising TS Re Cooling Water Sys Emergency Intake Design Bases. Subj Amends Base on Response to Notice of Violations Noted Noted in Insp Repts 50-282/96-15 & 50-306/96-15 ML20135A8191996-11-27027 November 1996 Application for Amends to Licenses DPR-42 & DPR-60,revising TS 4.12, SG Tube Surveillance & TS Section B-4-12 ML20134H3641996-11-0606 November 1996 Application for Amends to Licenses DPR-42 & DPR-60, Requesting Rev to Appendix a Re Cooling Water Sys ML20134E4451996-10-25025 October 1996 Application for Amends to Licenses DPR-42 & DPR-60,changing TS 4.4.A, Containment Leakage Tests, Bases to TS Section B.4.4, Containment Sys Tests & Adding TS.6.5.J, Containment Leakage Rate Testing Program ML20129E2451996-09-24024 September 1996 Application for Amends to Licenses DPR-42 & DPR-60, Respectively,Changing TS 4.12, SG Tube Surveillance, to Incorporate Revised Acceptance Criteria for SG Tubes W/ Degradation in Tubesheet Region ML20117P4291996-09-11011 September 1996 Application for Amends to Licenses DPR-42 & DPR-60,revising Plant TS Governing Cw Sys 1999-08-31
[Table view] |
Text
,
UNITED STATES NUCLEAR REGUIATORY COMMISSION NORTHERN STATES POWER COMPANY PRAIRIE ISLAND NUCLEAR GENERATING PIANT DOCRET NOS. 50-282 50-306 REQUEST FOR AMENDMENT TO OPERATING LICENSES DPR-42 AND DPR-60 REVISION NO. 2 TO LICENSE AMENDMENT REQUEST DATED AUGUST 14, 1987 Northern States Power Company, a Minnesota corporation, requests authorization for changes to Appendix A of the Prairie Island l Operating Licenses as shown on the attachments labeled Exhibits i A, B, and C. Exhibit A describes the proposed changes, describes ,
the reasons for the changes, and contains a significant hazards !
evaluation. Exhibits B and C are copies of the Prairie Island i Technical Specifications incorporating the proposed changes. '
This letter contains no restricted or other defense infor-mation.
NORTHERN STATES POWER COMPANY By Ddb David Musolf A
ManagerNuclearSuppor\ervices tS 1
On this4 N day o m /- /v[/beforemeanotarypublic in and 'for said Co6nty, pe/sonally appeared David Musolf, Manag- ;
er-Nuclear Support Services, and being first duly sworn acknowl- i edged that he is authorized to execute this document on behalf of Northern States Power Company, that he knows the contents there-of, and that to the best of his knowledge, information, and be-lief the statements made in it are true and that it is not inter-posed for delay.
M/ z:b$ d y 9/ / <<
' w . w :: :: :::: :::_.
JUDY L KLAPPERICM j
NOIARY PUBilC-MNNE3074 ANOKA COUNTY k;
- a. ..$.. .Commasen Espm sept g ggg
- m,.,.,. ,. . . . . . .,_ ,
B001130202 880104 PDR ADOCK 05000282 p PDR
Exhibit A Prairie Island Nuclear Generating Plant Revision No. 2 to License Amendment Request Dated August 14, 1987 Description and Evaluation of Proposed Change to Appendix A of Operating Licenses DPR-42 and DPR-60 Pursuant to 10 CFR Part 50, Section 50.90, the holders of Opera-ting Licenses DPR 42 and DPR-60 hereby propose the following ;
changes to Appendix A, Technical Specifications:
l
- 1. Changes in Plant Organization, Figure TS.6.1-2 !
i Proposed Changes l
- a. Delete Plant Superintendent Operations & Maintenance. Trans-
{
fer responsibility for implementation of the fire protection program to the Plant Manager, f
- b. Change Superintendent of Maintenance to General Superintendent f of Plant Maintenance. ;
- c. Change Superintendent of Operations of General Superintendent Plant Operations.
- d. Change Plant Superintendent Engineering & Radiation Protection t i
to General Superintendent Plant Engineering & Radiation Protec- '
tion,
- e. Add a new position of General Superintendent Planning and Services. Remove Supervisor of Security and Services from the organization diagram. .
- f. Add a new position of Assistant to the Plant Manager, i l
- g. Add the new positions of Shift Manager under the General !
Superintendent Plant Operations.
Refer to Exhibit B, Figure TS.6.1-2 for the proposed changes.
Reason for Changes The position of Plant Superintendent Operations & Maintenance has been eliminated and the positions of Superintendent of Mainte-nance and Superintendent of Operations have been upgraded to General Superintendents reporting directly to the Plant Manager.
This change will provide direct access to the plant manager in
EXHIBIT A the critical areas of plant maintenance and operations. In ac-cordance with our Operational Quality Assurance Program, Appendix C, the Plant Manager is the appropriate individual to designate as responsible for the fire protection program.
The title change to General Superintendent Plant Engineering &
Radiation Protection has been made to be consistent with the upgrade in the title of the maintenance and operations superin-tendents.
A new position of General Superintendent Planning and Services has been created that reports directly to the Plant Manager.
This new position will provide improved management control in the areas of planning, administration, security, and general house-keeping.
A new position of Assistant to the Plant Manager has been created to provide support to the Plant Manager for special projects.
The new position of Shif t Manager has been created to implement the Commission Policy Statement on Engineering Expertise on Shift. Refer to our letter dated May 9, 1986 which describes actions being taken to phase in this new position which will fill the dual role of licensed Senior Reactor Operator and Shift Technical Advisor.
Safety Evaluation and Determination of Significant Hazards Considerations The proposed changes to Appendix A of the Operating License l have been evaluated to determine whether they constitute a I significant hazards consideration as required by 10 CFR Part 50, Section 50.91, using the standards provided in Section 50.92. This evaluation is provided below:
- 1. The proposed amendment will not involve a significant increase in the probability or consequences of an accident previously evaluated.
The proposed amendment would revise the Technical Specifica-tions to reflect a number of improvements in the plant organi- ;
zation and changes in title of plant supervisors. As such, i these changes do not affect existing plant systems or pro-cedures and they cannot affect previously analyzed accidents.
I
t 2XHIBIT A 3-
- 2. The proposed amendment will not create the possibility of a new or different kind of accident from any accident previously evaluated.
The proposed Technical Specification changes relate to the structure of the plant organization. As noted above, no changes are made in plant systems or procedures. These purely administrative changes cannot create a new or different kind of accident from any previously evaluated.
- 3. The proposed amendment will not involve a significant reduction in the margin of safety.
The proposed Technical Specification wording changes do not, as stated above, affect anything other than the organization structure of the plant. Therefore, there can be no impact on any existing margin of safety.
The Commission has provided guidance concerning the applica-tion of the Standards for determining whether a significant hazards consideration exists by providing certain examples of amendments that are considered not likely to involve significant hazards considerations. These examples were published in the Federal Register on March 6, 1986.
Changes proposed in this License Amendment Request are rep-resentative of example (i) since they are administrati7e changes.
- 2. Requirements for Senior Reactor Operator Operator Licenses Proposed Changes
- a. Delete the "(LS0)" notation for the General Superintendent Plant Engineering and Radiation Protection in Figure 6.1-2.
- b. Change the "(LS0)" for the General Superintendent Plant Opera-tions to "(FLS0)" in Figure 6.1-2.
- c. Add a footnote to define "(FLS0)" at the bottom of Figure 6.1-2 as follows:
1 FLSO Formerly Licensed Senior Operator or Licensed Senior Operator ;
i
EXHIBIT A
- e. Add a "#" to tho General Superintendent of operations and add a footnote to Table 6.1.2 as follows:
- The Operations Group will have at least one management individual who holds a senior license who is not assigned to a rotating shift.
- f. Revise Specification 6.5.G to read, "...may be made with the concurrence of two members of the unit management staff, at least one of whom holds a Senior Reactor Operator's License."
Refer to Exhibit B, Figure TS.6.1-2 and page TS.6.5-4, for the proposed changes.
Reason for Changes Changes (a) through (e) would revise the Technical Specifica-tions to change the requirements for Senior Reactor Operator (SRO) Licenses for plant management to be consistent with the requirements of the NRC Standard Technical Specifications.
Change (f) revises the SRO license requirements for management personnel who may authorize temporary procedure changes. This change is also consistent with the NRC Standard Technical Speci-fications.
In the past, Northern States Power Company (NSP) has encouraged plant management and technical support staff personnel to obtain and maintain current SRO licenses. Recent changes to 10 CFR Part 55, and related NRC Staff guidance, have significantly upgraded SRO requalification program requirements. While these changes will provide added assurance that all licensed personnel are competent in control room operations, the amount of time and effort required to maintain a current SRO license has become prohibitive for plant management and support personnel not directly involved in operations.
NSP will provide alternative training for plant management and support personnel in lieu of maintaining an SRO license and par-ticipating in license requalification training. This Program will maintain a high level of knowledge of nuclear fundamentals, reactor theory, and plant operations in management and support personnel. Most plant management and support personnel not di-rectly involved in operations will participate in this program in lieu of maintaining a current NRC SRO license. Most utilities operating nuclear generating facilities have similar programs.
EXHIBIT A The changes we have proposed would revise the SRO requirements for management personnel specified in the Prairie Island Techni-cal Specifications to be equivalent to the SRO requirements specified in the Standard Technical Specifications, NUREG-0452.
This would reduce the number of SRO licenses required for manage-ment personnel.
Safety Evaluation and Determination of Significant Hazards Considerations The proposed changes to Appendix A of the Operating License have been evaluated to determine whether they constitute a significant hazards consideration as required by 10 CFR Part 50, Section 50.91, using the standards provided in Section 50.92. This evaluation is provided below:
- 1. The proposed amendment will not involve a significant increase in the probability or consequences of an accident previously evaluated.
The proposed amendment would revise the Technical Specifica-tions to eliminate certain excessive requirements for li-censing of plant management personnel. It would also revise the approvals needed for temporary procedure changes from two licensed members of management to one licensed and one un-licensed member of management. License requirements for plant operations staff, including the Shift Managers and Shift Supervisors (both are SRO licensed management personnel),
would not change. Alternative training will be provided for management and support personnel. Because there are no changes being proposed in the license requirements for indi-viduals controlling the reactor and other plant systems, there will be no impact on the quality of plant operations. The proposed changes cannot, therefore, result in a degradation in the quality of plant operations which would increase the probability of an accident.
- 2. The proposed amendment will not create the possibility of a new or different kind of accident from any accident previously evaluated.
The proposed Technical Specification changes relate to the requirements for plant management personnel to hold active SRO licenses. No changes are proposed in the license requirements for personnel actually operating the reactor and other plant systems or their supervisors. The changes, therefore, cannot
EXHIBIT A result in a degradation in the quality of plant operation or an increase in the probability of operator error resulting in a new or different kind of accident from any accident previ-ously evaluated.
- 3. The proposed amendment will not involve a significant reduction in the margin of safety.
The proposed Technical Specification wording changes do not, for the reasons stated above, affect the quality of plant operations. Therefore, there can be no impact on any existing margin of safety.
The Commission has provided guidance concerning the applica-tion of the Standards for determining whether a significant hazards consideration exists by providing certain examples of amendments that are considered not likely to involve significant hazards considerations. These examples were published in the Federal Register on March 6, 1986.
Changes proposed in this License Amendment Request are rep-resentative of example (i) since they are administrative changes. :
l l
1 l
I i
. _ - - _