Log # TXX-97161 C
.=
File # 10130 r
T IR 97-09 Ref. # 10CFR2.201 7UELECTR/C.
]
July 10, 1997 C. Lance Terry Group Mco Prendem U. S. Nuclear Regulatory Commission Attn.
Document Control Desk Washington, D.C.
20555 l
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NO. 50-445 and 50-446 NRC INSPECTION REPORT'N05. 50-445/97-09 and 50-446/97-09 i
i SUPPLEMENT TO RESPONSE TO NOTICE OF VIOLATION l
REF.
TU Electric letter logged TXX-97142, dated June 30, 1997 to the NRC.
Via the above referenced letter, TV Electric responded to the violation enclosed in the subject inspection report.
During a telephone conversation i
between Obaid Bhatty of my staff, and Mr. Ian Barnes of NRC Region IV on July 8, 1997, regarding our response to the subject violation: TU Electric concurred that clarification to the referenced response with respect to i
enhancements to control of eddy current contractors is warranted.
Based on the above, TU Electric is planning to perform the following l
actions for the upcoming Unit 2 refuelin0 outage (2RF03):
i Pre-job briefing to emphasize the TU Electric expectation for i
procedural compliance, attention to detail, work order compliance.
l and proper documentation of paper work.
1 TU Electric will administer a written test for the acquisition i
i personnel to ensure an understanding of procedures, acquisition
/,)
technique specification (ACTS), and Appendix 'H' essential variables.
TV Electric will emphasize to Westinghouse Quality Assurance our expectations for field compliance with the ACTS sheets for Appendix -f
'H' essential variables.
It will be our expectation that they
/jJ perform field walkdowns to ensure that the cabling, equipment.
probes, and probe extensions are in compliance.
It will be our expectation that they document this via their surveillance paperwork.
The TV Electric Site Level III Inspector will develop a check list for a field walkdown of the equipment and setup in the field to check for compliance with the ACTS sheets and acquisition procedure.
9707180059 970710 l
PDR ADOCK 050004 5 gggg]
0, P. O. Box 1002 Glen Rose Texas 76043
- 1 TXX-97161 Page 2 of 2 TV Electric will have an eddy current testing facility in place for 2
2RF03.
This facility will have the acquisition and analysis personnel in adjoining rooms.
The close proximity will allow the analyst better access to the acquisition team and face to face communication.
The TV Electric personnel that will be tasked with contractor control will attend team training for hands on setup and teardown of the eddy current testing equipment in a mockup environment.
This training will also include a dry run through the entire process from manway removal to manway installation.
Two of the TV Electric personnel will have attended Eddy Current l
Level IIA training prior to 2RF03.
Please note that these matters have been discussed with Mr. Ian Barnes.
s Should you have any comments or require additional information, please i
do not, hesitate to contact Obaid Bhatty at (254)-897-5839 to coordinate this effort.