' AVERAGE DAILY UNIT POWER LEVEL DOCKET N0. 50-245 UNIT Millstone 1 DATE 880101 COMPLETED BY G. Newb'rgh'
~
u TELEPHONE (203) 447-1791' Extension 4400 MONTH DECEMBER, 1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 659 17
-660 2
656 18
-660-
~
3 659 19 660 4
659 20 660 5
648 21 647 6
659 22 660 7
659 23
'660 8
660 24
-660 9
659 25 660 10 660 26 561 11 660 27
'660 12 660 28 660 13 660 29 632 14 660 30 649 15 617 31 660 16 647 INSTRUCTIONS On this format, list the average daily unit power level ir. MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
'h JBA"ns!R Bs!$jjgs R
[-
)
OPERATING DATA REPORT DOCKET N0. 50-245 DATE 880101 COMPLETED BY'G. Newburgh TELEPHONE (203) 447-1791 Extension 4400 OPERATING STATUS-1.
Unit Name:. Millstone 1 l Notes l
2.
Reporting Period: December, 1987 l
l 3.
Licensed Thermal Power (MWt): 2011 l
l
- 4.
Nameplate Rating (Gross MWe): 662 l
l 5,
Design Electrical Rating (Net MWe): 660 l
l 6.
Maximum Dependable Capacity (Gross MWe): 684l l
'7.
Maximum Dependable Capacity (Net MWe): 654 l
l 8.
If Changes Occur in Capacity Ratings (Items Number 3 Through 7)
Since Last Report, Give Reasons:
~.4/A 9.
Power Level To Which Restricted, If Any (Net MWe):
N/A 10.
Reasons For Restrictions, If Any:
N/A This Month Yr.-to-Date Cumulative 11.
Hours In Reporting Period 744 8,760 149,808 12.
Number Of Hours Reactor Was Critical 744 6,970.7 116,326 13.
Reactor Reserve Shutdown Hours 0
0 3,283.3 14.
Hours Generator On-Line 744 6,827.1 113,192.5 15.
Unit Reserve Shutdown Hours 0
0 93.7 16.
Gross Thermal Energy Generated (MWH) 1,478,855 13,448,022 210,206,095 17.
Gross Elec. Energy Generated (MWH) 507,400 4,584,600 70,776,596 18.
Net Electrical Energy Generated (MWM)'
485,716 4,377,008 67,514,720 19.
Unit Service Factor 100 77.9 75.6 20.
Unit Availability Factor 100 77.9 75.6 21.
Unit Capacity Factor (Using MDC Net) 99.8 76.4 68.9 22.
Unit Capacity Factor (Using DER Net) 98.9 75.7 68.3 23.
Unit Forced Outage Rate 0
- 1. 3 11.3 24.
Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A 25.
If Shut Down At End Of Report Period, Estimated Date of Startup:
N/A 26.
Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A
4 DOCKET NO.150-245 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME Millstone 1 DATE 880101
' COMPLETED BY G. Newburgh REPORT MONTH DECEMBER, 1987 TELEPHONE (203) 447-1791' Extension 4400 No.
Date Type Duration Reason 2 Method of Licensee System
. Component Cause &' Corrective l
(Hours)
Shutting Event Code 4
' Code 5 Action to-Down Reactor 3 Report #
Prevent' Recurrence-(
N/A 3" '
1 2
3 4
F:
Forced Reason:
-Method:
Exhibit G - Instructions S:
Scheduled A-Equipment Failure (Explain).
2-Manual Scram Entry. Sheets for Licensee-1-Manual
'for Preparation'of Data B-Maintenance or Test' C-Refueling 3-Aut'omatic Scram Event Report (LER)-File' D-Regulatory Restriction 4-Continued from
'(NUREG-0161)-
E-Operator Training & License Examination previous month.
F-Administrative 5-Power Reduction 5
G-Operational Error (Explain)
(Duration = 0)
Exhibit 1 - Same Source H-Other (Explain)'
6-Other (Explain) i 1
O l
REFUELING INFORMATION REQUEST 1.
Name of facility:
Millstone 1 2.
Scheduled date for next refueling shutdown:
MARCH 1989 3.
Schedule date for restart following refueling: MAY 1989 4.
Will refueling or resumption of operation thereafter require a technical specification change or other license amendment?
Yes, Technical Sperg ication Changes Regarding:
(1) Maximum Average Planar Linear Heat Generating Rate (2) Maximum Critical Power Ratio 5.
Scheduled date(s) for submitting licensing action and supporting information:
Summer 1988 6.
Important licensing considerations associated with refueling, e.g.,
new or different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures:
196 GE8B Fuel Assemblies 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a) In Core: (a) 580 (b) 1732 8.
The present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in number of fuel assemblies:
2184 Assemblies 9.
The projected date of the last refueling that can be discharged to the spent fuel pool assuming the present licensed capacity:
1987, Spent Fuel Pool, Full Core Off Load Capability is Reached.
Temporary rack approved for installation if required; plans for additional capacity in progress.
n N UTILITIES cenerai Orvices seicen street. seriin. Connecticut l
sY m EsSi cow =
P.O. BOX 270
.<uc=
wt
- ma cow =a HARTFORo. CONNECTICUT 06141-0270 J $$C,".7%.g';,
(203) 66 5 5000 L
L January 8, 1988 MP-11332 Re:
U.S. Nuclear Regulatory Commission Document Control Desk Washington, D. C. 20555
Reference:
Provisional License DPR-21 Docket No. 50-245
Dear Sir:
In accordance with Millstone Unit 1 Technical Specification 6.9.1.6, the following monthly operating data report for Millstone Unit 1 is enclosed.
One additional copy of the report is enclosed.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY til au-Ste hen E. Scace Station Superintendent Millstone Nuclear Power Station SES/GSN:1 fg
Enclosures:
(4) cc:
Regional Administrator, Office of Inspection and Enforcement, Region I Director, Office of Inspection and Enforcement, Washington, D. C. (10)
Director, Office of Resource Management William Raymond, Senior Resident Inspector f
9
,1y