Text
_ _ _ _ _ _ _ _ . _
_
_.
. _ _ _ _
j
,
In Reply'Refor To:
Docket: - 50-267/87-34
FEB
3M
e
.Public Service Company of Colorado
ATTN:
Robert 0. Williams, Jr.
Vice President, Nucleae
Operations
2420 West 26th Avenue, Suite 15c
Denver, Colorado
80211
Gentlemen:
This' refers to the inspection conducted by Messrs R. E. Farrell and
P. W. Michaud of this office during the period November 22 through December 31,
1987, of activities authorized by NRC Operating License DPR-34 for the Fort St.
Vrain Nuclear Generating Station, and to the discussion of our findings with
you and other members of your staff at the conclusion of the inspection.
Areas examined during the inspection included followup of licensee act' ion on
previously identified inspection findings, operational safety verification,
followup of Allegation 4-86-A-119, followup of Bulletin 87-02, critical rod
height predictions, design control, procedural adequacy and compliance,
engineered safety features walkdown, reserve shutdown system, region peaking
factor surveillance, monthly surveillance observation, monthly maintenance
observation, radiological protection, and monthly security observation. Within
these areas, the inspection consisted of selective examination of procedures
and representative records, interviews with personnel, and observations by the
inspectors.
The inspection findings are documented in the enclosed inspection
report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Consequently, you are required to respond to
this violation, in writing, in accordance with the provisions of Section 2.201
of the NRC's "Rules of Practice," Part 2, Title 10, Code of Federal
Regulations.
Your response should be based on the specifics contained in the
Notice of Violation enclosed with this letter.
We have also examined actions you have taken with regard to previously
identified inspection findings.
The status of these items is identified in
paragraph 2 of the enclosed report.
The response directed by this letter and the accompanying Notice is not subject
to the clearance procedures of the Office of Management and Budget as required
by the Paperwork Reduction Act of 1980, PL 96-511.
!
b
N
RP g
AC$V
RIV: SRI
RI
PS
D:
l
l
k REFarrell/1d ( PWMichaud (TFWesterman (LJCallan
MEEmerson
1/p/88
j
1/p/88
j
1/p'88
7 )/88
3/\\/88
+
m
'
/4(l
8802090506 800203
ADOCK 05000267
/ b
G
g (
,
I
'
_
~
.
.
.-
Public Service Company of Colorado
-2-
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
L. J. Callan, Director
DivisionofReactorProject
Enclosures:
1.
Appendix A - Notice of Violation
2. -Appendix B - NRC Inspection Report
50-267/87-34
cc w/ enclosures:
'{
Manager, Nuclear
~
Production Division
Fort St. Vrain Nuclear Generating Station
16805 WCR.19 1/2
Platteville, Colorado
80651
P. Tomlinson, Manager, Quality
.
Assurance Division
(same address)
Colorado Radiation Control Program Director
. Colorado Public Utilities Commission
bec to DMB (IE01)
bcc distrib. by RIV:
- D:DRP
R. D. Martin, RA
- RRI
DRSP
- Section Chief (RS/8)
- RIV File
- Section Chief (RSB/ES)
- R&SPB
- RSTS OPERATOR
- MIS System
1
- RSB
- Project Inspector
- D
Weiss, RM/ALF
- A.
Beach.
- M.
Emerson
- w/766
l
l
L --
_ - - - - - - - - - - - - - - - - - - _ _ - - - - - -
- -
--
_
- - - - - - - -
- - -