Forwards Insp Rept 50-331/93-10 on 930708-0823.No Violations Noted
ML20149D405
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 09/13/1993
From: Lanksbury R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Leslie Liu
IES UTILITIES INC., (FORMERLY IOWA ELECTRIC LIGHT
Shared Package
ML20149D409 List:
References
EA-93-106, NUDOCS 9309210033
Download: ML20149D405 (2)


See also: IR 05000331/1993010

Text

o

SEP 131993

O

Docket No. 50-331

EA 93-106

Iowa Electric Light and Power

Company

ATTN: Mr. Lee Liu

Chairman of the Board

and Chief Executive

Officer

IE Towers

P. O. Box 351

Cedar Rapids, IA 52406

Dear Mr. Liu:

SUBJECT: ROUTINE RESIDENT INSPECTION AT DUANE ARNOLD ENERGY CENTER ,

This refers to the inspection conducted by Messrs. J. Hopkins, P. Prescott,

and C. Miller of this office on July 8 through August 23, 1993. The

inspection included a review of activities authorized for your Duane Arnold '

Energy Center (DAEC) facility. At the conclusion of the inspection, the

findings were discussed with those members of your staff identified in the

enclosed report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of a selective examination of procedures

and representative records, interviews with personnel, and observation of -

activities in progress.

No violations of NRC requirements were identified during the course of this

inspection.  !

Concerns with foreign material exclusion and personnel errors were identified 1h j

'

during the inspection. The trip of the spent fuel pool cooling pump due to j'

debris in the suction strainer demonstrates the need for you to improve the

control of- foreign material on the refuel floor. We are also concerned that

the number of personnel errors at the end of the reporting period may be the

beginning of an adverse trend. We will continue to evaluate your efforts to

improve the control of foreign material on the refuel floor and to reduce

personnel errors.

In addition, the results of a routine, announced inspection to evaluate your

10 CFR 50.59 Safety Evaluation Program at DAEC, conducted from June 7 through

June 11, 1993, by Mr. R. Pulsifer of the Office of Nuclear Reactor Regulation,

is included as a separate enclosure (Enclosure 2). No violations of NRC

requirements were identified during Mr. Pulsifer's inspection.

9309210033 93o913

gDR ADOCK 05000331

PDR

)

. . . - . . _ . . . - _ - . -- _ . _ . _ . _ - ..

I

, SEP 131933

lowa Electric Light and 2

-

Power Company

l

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of j

this letter and the enclosed inspection reports will be placed in the NRC  ;

Public Document Room, j

I

We will gladly discuss any questions you have concerning this inspection.

!

Sincerely, .

Original Signed by R. D. Lank l

R. D. Lanksbury, Chief i

Reactor Projects Section 3B

Enclosures:

1. Inspection Report

No 50-331/93010(DRP)

2. NRR 10 CFR 50.59

Inspection Report ,

cc w/ enclosures:

D. Wilson, Plant

Superintendent - Nuclear

K. Young, Manager, Nuclear

Licensing

OC/LFDCB

Resident inspector, Rill

Stephen Brown, Iowa Dept.

of Commerce

Licensing Project Mgr., NRR

James Luehman, OE

, bcc: PUBLIC

3

,

!

i

RIII Rill RIII RIII RIII Rill

r'M1((

Khanna

7'r)$

Lanksbury

Nk y

Ploski

&~

Madeda

A'C0

Olteanu

JIid

G[rger  ?

'l D 3 FG 'll01% (Sec 3.b) (Sec 3.d) 473

97 g .

'

mq3 4/s/o

.- _ .. .. . . . . -