ML20149D401
| ML20149D401 | |
| Person / Time | |
|---|---|
| Site: | Cooper |
| Issue date: | 12/31/1987 |
| From: | Horn G, Scheuerman J NEBRASKA PUBLIC POWER DISTRICT |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| CNSS888015, NUDOCS 8801120342 | |
| Download: ML20149D401 (5) | |
Text
_
y.
seJ'
..J 1
N 'd Sl
%;l
. OPERATING DATA REPORT
/l
.va ;
?;f l DOCKET NO. 050-0298
.'. q DATE 1-8-88 C051PLETED BY J.
T. Scheuerman' N' TELEPHONE (402)825-3811' N.d n1dj OPERATING STATUS o
.1 Notes'
- j
- 1. Unit Name:
cooper Nuclear staeion
- 2. Reporting Period:
Decembar 1987 2381
- 3. Licensed Thermal Power (51Wt):
836
- 4. Nameplate Rating (Gross 51We):
778
- 5. Design Electrical Rating (Net alWe):
- 6. Staximum Dependable Capacity (Gross SIWE):
787
' I
- 7. Staximum Dependable Capacity (Net 51We):
.]
764
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted,if Any (Net 51We):
- 10. Reasons For Restrictions,if Any:
'l This Month Yr..to.Dat e Cumulative
.r
- 11. Hours in Reporting Period 744.0 8,760.0 118,369.0
- 12. Number Of Hours Reactor Was critical 744.0 8.424.2
^ 90,007.4
- 13. Reactor Resene Shutdown Hours 0.0 0.0 O.0
- 14. Hours Generator On.Line 744.0 8,292.4 88,544.4
- 15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
- 16. Gross Thermal E' ergy Generated (51WH) 1.644.816.0 17,163.363.5 174,6'30,707.5 n
- 17. Gross Electrical Energy Generated (51WH) 548 & Q 5,714,073.0 56,059,081.0
~H
- 18. Net Electrical Energy Generated (51Wil) 530,214.0 5,522,126.0 54,028,624.0
- 19. Unit Senice Factor Inn.o 94.7 74.8
- 20. Unit Availability Factor 100.0 94.7 74.8
- 21. Unit Capacity Factor (Using 51DC Net) 93.3 '
82.5 59.7
- 22. Unit Capacity Factor (Using DER Net) 91.6 8
.0 58.7
.23. Unit Forced Outage Rate 0.0 31 4.6
- 24. Shutdowns Scheduled.Over Next 6 Slonths (Type. Date,and Duration of Each):
1988 Refueling and Maintenance Outage starting February 27, 1983, with an approximate duration of eight weeks.
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup[
- 26. Units in Test Status (Prior to Commercial Operation):
Forcesst Achieved INITIA L CRITICALITY INITIA L ELECTRICITY C05151ERCI AL OPER ATION 8801120342 871231
'Mc7 f'//}y77) i PDR ADOCK 05000298
//
'3
,_s._
, _,,a[.
R
.DCD
.g m, a _,._,,_ s,wa;.,.; AA
. a.5 i!
f.e':
3 d.],
57v,ex a -
AVERAGE DAILY UNIT POWER LEVEL
-ly [
~
n:M :
4 ;
DOCKET NO.
050-0298
- n; UNIT CNS 3
i
.ne; DATE 1-8-88
)N M;f 7
COMPLETED BY J. T. Scheuerman1
,pg
,a.
j.]s-TELEPHONE (402)825-3811
-/, Q ;
.,D i
MONT11 December 1987
~
,if; 2
c.:
s DAY AVERAGE DAILY POWER I.EVEL DAY AVER AGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net)
-ll
~
' J-l l
755 17 727-g.it.
m
. 2 721 lg 729
'li
,1 3
720 19 727 724
- 3.,. 4 20 651
[
725 3
21 730 6
638 22 721
- .g
+
7 748 713
'}[
23 8
727 24 722 16 9
733 651 25 J,
~
10 729 26 651
?i:
f.
11 731
[.
27 631
,-(
731 12 23 745 13 654 29 726 7 3 '"
14 30 723 15 730 716
'[
31 732 s -
16 UI s
INSTRUCTIONS On this format, list the average daily unit power level in MWe Net for each day in the reporting month. Compute to
' i.
3 the nearest whole megawatt.
.f, f A
er4 s
(9/77)
.6 i j,
bc
.4..
,i
<f#
4
,, c_,, __ __, n,_jg, k..:,o+ 4
- y.,- _ "
,_. m
.1,.
. m_.. f g
_.3 __ m z.
_m.,
-fCi
,,,r
- v ip
?.:,s y s. w
_ a <,., e i -
,.9 14:7-,.: 4 g
-.a.
y,
,_g 1.s m.4-v_ _,3 9 _- __ _ _._ _gg
UNITS!!UTDOWNS AND POWE!t IIEDUCllONS flOCKliT NO. 050-0298 UNIT NAh!E CNS 1-8-88 9A g g-COA!Pl.ETED 11y J.
T.
Scheuerman II.EPOftT M ONTil DecemMr 1987 lELEPilONil (402)825-3811 a.
.!E
}
c
.$.Y 5 1.icensee
,E-r, j 1,'
Cause & Corecetive No.
Dste R
E8
.5 s 5 livent 3,y gu Psevent Itceurrence 8
Action to y I.,
5 l'-
5; g Iteport er va O o
.3 o
O None du ring t his reporting ' period.
I
\\
i I
2 3
4 I:: Forced Itcason:
Method:
Exhibit G-Instructions S: Scheduled A Equipment Failure (Explain)
I Manua!-
- for Pieparation of Data 11-hlaintenance of Test 2 Manual Scram.
Entiy Sheets fin 1.icensee
- C Itefueling 3 Automatic Scram.
livent Itepint (LElt) 1 ile INtillLG-
- 1) Itegulatory itestricilint 4 Ottier (Explain) 0161)
E-Opciator Tiaining & License lixamination i
17 Adininistrative 5
G-Operational Error (Explain)
Exhibit I Same Source t'8/77).
Il-Other (Explain) g m
(
Operations Narrative Cooper Nuclear Station December 1987 The plant operated the month of December in a normal load following mode.
There wert. no scheduled or unscheduled shutdowns and no unscheduled power reductions. A capacity factor of 93.3% was achieved for the month of December.
l i
l i
.C h
Nebraska Public Power District
"*f'$h5b!$$$hb.$'k"'"
c'..SS888015 January 8, 1988 Document Control Desk U.S. Nuclear Regulatory Commission Washington, D.C.
20555
Subject:
Monthly Operation Status Report for December, 1987 Docket No. 50-298 Gentlemen:
Enclosed for your information and use is the Cooper Nuclear Station Monthly Operating Status Report for December, 1987. The report includes Operating Status, Average Daily Unit Power Level, Unit Shutdown Data, and a Narrative Summary of Operating Experience.
Should.you have any comments or require additional information regarding this report, please contact me, j
Sin rely,
/w orn Div on Manager of i
Nuclear Operations GRH/JTS:drf I
Enclosure cc:
G. D. Watson w/ enc.
R. D. Martin w/ene, g
n
=5 m
S T-
+ -