Forwards Requalification Exam Rept 50-219/93-17OL Administered During Wk of 930809.All Sixteen Licensed Operators Passed Requalification Exam
ML20149D340
Person / Time
Site: Oyster Creek
Issue date: 09/15/1993
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: J. J. Barton
GENERAL PUBLIC UTILITIES CORP.
Shared Package
ML20149D346 List:
References
NUDOCS 9309210011
Download: ML20149D340 (3)


See also: IR 05000219/1993017

Text

l

i

i

'

SEP 151993

Docket No. 50-219

Mr. John J. Pvton

!

Vice President and Director

GPU Nuclear Corporation

'

Oyster Creek Nuclear Generating Station

P. O. Box 388

!

Forked River, New Jersey 08731

Dear Mr. Barton:

,

'

SUBJECT:

REQUALIFICATION EXAMINATIONS AND REQUALIFICATION

PROGRAM EVALUATION REPORT 50-219/93-17 (OL)

During the week of August 9,1993, the NRC staff conducted licensed operator

requalification examinations and completed a program evaluation at the Oyster Creek Nuclear

Genenting Station using the results of the examinations. The requalification examinations

i

and program evaluation were conducted using Revision 7 of NUREG-1021, " Operator

Licensing Examiner Standards." These were the first licensed operator requalification

l

examinations administered on your plant specific simulator.

On August 13,1993, at the conclusion of the evaluation findings related to the preparation

and administrcSon of the examinations were discussed with those members of your staff

l

identified in the enclosed report.

All sixteen licensed operators passed the requalification examination and all three crews

,

passed in the simulator. The results of the examinations indicate a satisfactory requalification

program at the Oyster Creek Nuclear Generating Station.

The written examination and walk-through test items that were proposed for the examination

l

'

i

required only minor revisions. However, development of dynamic simulator scenarios was

determined to be a program weakness. The dynamic simulator scenario bank did not provide

a comprehensive evaluation of the operating crew's integrated plant knowledge and ability to

safely operate the plant. You are requested to provide a written response to the deficiencies

identified in the fourth paragraph of section 3.2 of the enclosed report within ninety days of

receipt of this letter. Your response should provide your perspective on the issues snd any

corrective action taken or planned.

,

,

7

OFFICIAL RECORD COPY

G:OC9317.RER

-

I*

,

l

PDR^

i

-- - - -

.

.

2

SEP 151993

Mr. John J. Barton

An unresolved item related to evaluation of the operator training programs was closed based

on your progress in the area of program evaluation. We are interested in your evaluation of

the first requalification examinations administered on your plant specific simulator. You are

requested to include an evaluation of the requalification program, based on the results of the

examinations, in your response.

1

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this letter and

the enclosures will be placed in the NRC Public Document Room.

,

The response requested by this letter is not subject to the clearance procedures of the Office

1

of Management and Budget as required by the Paperwork Reduction Act of 1980, Pub. L.

No. 96.511.

,

I

Should you have any questions, please contact Mr. R. Conte, Chief, BWR Section, at (215)

,

337-5210.

Sincerely,

)

IginM Sign?d By:

- li % abasen

Lee. H. Bettenhausen, Chief

'

Operations Branch

Division of Reactor Safety

Enclosure:

Examination Report No. 50-219/93-17

w/ Attachments 1,2, and 3

]

Attachments:

1. Persons Contacted

2. Simulator Fidelity Report

3. GPU Nuclear Oyster Creek Operations Training Biennial Exam Report

cc w/ encl; w/o Attachments 1,2, and 3:

,

'

M. L aggart, Manager, Corporate Licensing

l

P. Czaya, Acting Licensing Manager, Oyster Creek

NRC Resident Inspector

State of New Jersey

OFFICIAL RECORD COPY

G:OC9317.RER

l

J

.

.

Mr. John J. Barton

3

SEP 151993

cc w/enci and Attachments 1, ' , and 3:

z

J. Kowalski, Manager - Plant Training

G. Cropper, Operator Training Manager

J. Sullivan, Plant Operations Division

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

,

,

bec w/ encl; w/o Attachments 1,2, and 3:

T. Walker, Chief Examiner, DRS

C. Tyner, NRC Consultant, EG&G

OL Facility File

bec w/enci and Attachments 1,2, and 3:

Master Exam File

<

!

bec w/ encl; w/o Attachments 1,2, and 3:

Region 1 Docket Room (w/ concurrences)

,

'

bec w/ encl; w/o Attachments 1,2, and 3 (VIA E-MAIL):

i

V. McCree, OEDO

J. Stolz, NRR/PDI-4

,

A..Dromerick, NRR/PDI-4

R. Gallo, Chief, OLB, NRR

(NOTIFY VIA 3-MAIL AND NO ATIACHMENT)

L. Bettenhausen, DRS

R. Conte, DRS

T. Walker, DRS

'

A. Burritt, DRS

RI:DRS

RI:DRS -

RI:DRS

Walker /dmg

Cont

Bett nhausen

f

/D ,

99/O'f/93

09/3/93

g93

d v,l71.ps'J

A

1

  • '

OFFICIAL RECORD COPY

G:OC9317.RER

1