Forwards Insp Rept 50-213/87-27 on 871009-1207.No Violations Noted.Written Response Requested within 30 Days of Ltr Receipt Re Incorrect Greasing of safety-related motor-operated Valve Motors
ML20149D337
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 12/28/1987
From: Bettenhausen L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Mroczka E
CONNECTICUT YANKEE ATOMIC POWER CO.
Shared Package
ML20149D342 List:
References
NUDOCS 8801120280
Download: ML20149D337 (2)


See also: IR 05000213/1987027

Text

- _ - . . .-

... .. . .

w ..-

.

'

EC 2 81987

' Docket / License: 50-213/0PR-61

Connecticut Yankee Atomic. Power Company

ATTN: Mr. . E. J. Mroczka

Senior Vice President - Nuclear

Engineering and Operations

P. O. Box 270

Hartford, Connecticut 06101

Gentlemen:

l

Subject: Resident Inspection 50-213/87-27 (October 9 - December 7, 1987)

This transmits the findings of the routine NRC inspection conducted by J. T.

Shediosky and A. A. Asars of the Haddam Neck Plant. The findings have been'

discussed with Mr. D. B. Miller of your staff.

No violations were identified during this inspection. However, the enclosed

report (Detail 6.3) addresses the incorrect greasing of several safety-related

motor-operated valve motors rather than the pinion gear housings. Once this

situation was identified, managenrent took aggressive action to determine the

extent of the error and identify and implement corrective actions. We are

concerned that-training and job supervision did not prevent this potential

compromise of safety-related environmentally qualified equipment. Please-

respond in writing to this matter, within 30 days of receipt of this letter,

identifying your corrective actions and actions to prevent recurrence.

Thank you for informing us, by your October 14, 1987 letter to NRC Region I,

of your intended actions to prevent the recurrence of the problems experienced '

during the current refueling outage with the unauthorized activities by

,

contractor personnel. Contractor activities will be reviewed during future  ;

'

routine inspections. - ,

, In addition, as noted in Detail 5.8 of the enclosed report, we have received i

!

your October 2, 1987 letter addressing Shift Technical Advisor expertise at ,

. Haddam Neck. Since conformance with existing NRC requirements has been

identified by our inspection of this matter, and no additional information is

i needed to determine whether noncompliance' exists, we have closed the

4

unresolved item in question. 1

l

Your cooperation with us is appreciated.

!  !

'

Sincerely,

'

i  :

l

Lee H. Bettenhausen, Chief 1

Projects Branch No. 1

Division of Reactor Projects

) \\ OFFICIAL RECORD COPY IR HN 87-27 - 0001.0.0

12/23/87

/

h

'O\ sem2ne0 en228

PDR ADOCK 05000213

.

1

0 . ..DCD ,

J

i

_ _ - . ___ _ _ - - -. . - - _ _ - - _ _ . , ..--_--..m

.' ..

. DEC 2 81987

,

Connecticut Yankee Atomic Power Company -2-

Enclosure: NRC Region I Report 50-213/87-27

cc w/ encl:

D. B. Miller, Station Superintendent

D. O. Nordquist, Director of Quality Services

R. M. Kacich, Manager, Generation Facilities Licensing

W. D. Romberg, Vice President, Nuclear Operations

Gerald Garfield, Esquire

Public Document Room (PDR)

local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Connecticut

bcc:

Region I Docket Room

Management Assistant, DRMA

DRP Section Chief

W. Raymond, SRI, Millstone

A. Wang, LPM, NRR

R. Bores, DRSS

J. Strosnider, DRS

fWA

RI:DRP

frX

RITDRP

McCABE BETTENHAUSEN

12&f/87 12/ay/87

0FFICIAL RECORD COPY IR HN 87-27 - 0002.0.0

12/23/87