Forwards Insp Repts 50-327/87-27 & 50-328/87-27 on 870601-05.Reviews Highlighted in Ltr Indicate That Significant Number of Problems Exist W/Newly Regenerated Calculations Which May Have Been Prepared by Contractors
ML20149C482
Person / Time
Site: 05000000, Sequoyah
Issue date: 08/24/1987
From: Ebneter S
NRC OFFICE OF SPECIAL PROJECTS
To: White S
TENNESSEE VALLEY AUTHORITY
Shared Package
ML082310326 List:
References
FOIA-87-726 NUDOCS 8709030167
Download: ML20149C482 (4)


See also: IR 05000327/1987027

Text

-

---

- - -

- - - _ _

_

__

_

.w

'

9 fl{$]

h ifM'

l

-

, ~ /

..

{o,,

UNITED STATESe

'

NUCt. EAR REGULATORY COMMISSION

[

p,

-

W ASHINGTO% D. C. 20655

l

"

v

.

c

  • g.....,/

.. 24, 1987

'!

'

August

'

i

Docket Nos. 50-327

and 50-328

q

,-

r

'

Tennessee' Valley Authority

)

'

ATTN: Mr. S. A. White

j

Manager of Nuclear Power

6N 38A Lookout Place

1101 Market Street.

Chattanooga, Tennessee 37402-2801

.

Gentlemen:

,

SUBJECT: SEQUOYAH DESIGN CALCULATION REVIEW:' REPORT NOS. 50-327/87-27

-

AND 50-328/87-27

This letter forwards the inspection report associated with the Sequoy6l design

calculation review inspection perfonned at: ypurf Knoxville, Tennessee offf res

'

from June.1-5, 1987. This inspection report addresses the adeouacy of!

corrective actions resulting from the design calculation revie(program

,

includi.ng NRC's previous inspection of this; program.

Prior to the performance of this irspectMh it was recognized by the hRC;

staff that a complete inspection could n2t be conducted in the civil / structural

area for two reasons:

(1) TVA had not sutnitted their updated calculation

review program description, requested by tne NRC during the exit meeting of

the previous calculation inspection on Rbruary 13, 1987 and again

i

in writing in a March 5,1987 letter frog 2mes M. Taylor, then Director of

the Office of Inspection and Enfc. :ement .td Steven A. White, TVA Manager of

Nuclear Power and (2) there was additional work in process in TVA's~ Civd

Engineering Branch (CEB) that would not be completed prior'to the inspedtion.

The updated description of the calculation review program, recently submitted to

the NRC by letter from R. L. Gridley, Director, Nuclear Safety and Licensing

dated July 31, 1987, was necessary in the evaluation of'CEB because the staff

,

had and still has concerns about the lack of a current review of Sequoyah

calculations previously performe1 by the CEB.

Further TVA efforts in this area

may be necessary dependinglon the results of the staff review of the TVA

submittal and insights gs,fned during the ongoing Integrated Design Inspection.

'

During this calculatiori review inspection the team reviewed four-prograes

undertaken by CEB to determine theitechnical adequacy of the Sequoyah design:

(1) Miscel?aneous Structural Steel (SQN CEB,87-02); (2) Conduit and HVAC

Supports (SQN CEB 87-03); (3) Embeded Plates (SON CEB 87-04); and -(4) Civil /

Structural Regenerated Calculations (SQN,CEB 87-06). The TVA/CEB reviews

highlighted above' indicate that a signtf.icant number of problems exist with

,

newly regenerated calculations, many of ahich have been prepared by contract

personnel.

f)/.)

~

1

x

.

m

-

h

'

'p,

~

.

-

-

-

-

.

. - - -

.-

.

w

i

,'

,'

.

l

-2-

August 24, 1987

Tennessee Valley Authority

One of the more significant open items in this inspection report is MEB-3

The team

which relates to the main feedwater system water hammer analysis.

,

found that TVA had, in consideraticn of ' main feedwater line water hamer,

only evaluated the main feedwater check valves to assure that they would

maintain their function and integrity following the most severe feedwater

line break postulated. The TVA evaluation did not assess the main feedwater

A

piping integrity and the increased loads transmitted to pipe snubbers.

TVA analysis performed on the Watts Bar main feedwater piping yielded snubber

water hamrur loads that were approximately 10 times greater than the snubber

seismic loads.

The team also noted ineffective implementation of a procedure to track unverified

assumptions made in calculations and also a lack of coordination between the

Mechanical, Electrical, and Nuclear Engineering Branches regarding responsibility

for determination of instrument setpoints.

A written response is requested from TVA addressing the observations identified

The NRC intends to follow your actions to resolve

in the enclosed report.

these items, therefore your response should be provided sufficiently in advance

The findings

of ;lanned restart of Sequoyah Unit 2 to allow for NRC inspection.

addressed in the enclosure were discussed by the teun in a mceting with TVA'

management at the conclusion of the inspection on Ane 5,1987.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure

will be placed in the NRC Public Document Room.

Should you have any questions concerning this inspection, please contact me or

Mr. Steven D. Richardson at (301) 492-9044 of this office.

Sincerely,

/

L

a4J C, b'/E~

Stewart D. Ebneter, Director

TVA Projects Division

Office of Special Projects

Enclosure:

Inspection Report 50-327/87-27

and 50-328/87-27

'

cc w/ enclosure:

See n3xt page

.

'

-

--

-

.

.

.

-

- - - _ _ _ _

-_

-

-

3

,

.

.

,

Mr. S. A. White

Sequoyah Nuclear Plant

Tennessca Valley Authority

CCt

f.egional Administrator, Region II

Genera 1' Counsel

U.S. -Nuclear P,c;ulatory Connission

Tonnessea Valley Authority

101 Marietta Street, N.W.'

400 West Sunnit Hill Drive

Atlanta, Georgia 30323

E11 833

Knoxville, Tennessee 37902

Resident Inspecter/Sequoyah-NP

c/o U.S. Nuclear Pegulatory Connission

Mr. R. L. Gridley

2600 Igou Ferry Rcad

Tennessee Valley Authority

SN 157B Lookout Place

Soddy Daisy, Tennessec 37379

Chattanooga, Tennessee 37402-2801

Mr. Richard King

Mr. H. L. Abercrombie

c/o U.S. GA0

Tennessee Valley Authority

1111 North Shore Drive

Suite 225, Box 194

Sequoyah . Nuclear Plant

Knoxville, Tennessee 37919

P.O. Box 2000

Soddy Daisy, Tennessee 37379

Tennessee Department of

Public Health

Mr. M. R. Harding

Tennessee Valley Authority

ATTN: Director, Bureau of

Environmental Health Services

Sequoyah Nuclear Plant

Cordell Hull Building

P.O. Box 2000

Soddy Daisy, Tenc'

s 37379

Nashville, Tennessee 37219

Mr. Michael h. Mobley, Director

Mr. D. L. Williams

Tennessee Valley Authority

Division of Radiological Health

400 West Sunnit Hill Drive

T.E.R.R.A. Building

150 9th Avenue North

W10 885

Knoxville, Tennessee 37902

Nashville, Tennessee 37203

County Judge

Familton County Courthouse

Chattanooga, Tennessee 37402

i

i

-

,

.

(-

.

t

.

.

Tennessee Valley Authority

-4-

DISTRIBUTION

Docket File

DRIS R/F

RSIB R/F

SDEbneter, OSP

RWParkhill, NRR

EVImbro, NRR

CHaughney, NRR

8 Grimes, NRR

JPartlow, NRR

RArchitzel, NRR

JZwolinski, OSP

BLiaw, OSP

SRichardson, OSP

l

JFair, OSP

RHerman, OSP

i

,., (,f/

/

}W '

f

O

Ny.........:........ 4.... 0RIS

DRIST:tJR: g :DD:

Y

.1 :D:

D:TVA PD
DRIS:NRR

IFC

DRI

,,

... ..............

,,..

., ,,,,, ,,,,,,

.....:..e

......

t w

SOEbneter

IAME :RWParkhill AREArchitzel

EV!mbro

.CJHaughney

s

-

........................,."....,,,,,,,,N

. ...:..............:.............:.........

,

8/ 7 /87
8/i //87
8/ N 87

IATE :8/ 7/87

8/ 7 /87
8/ 7 /87

jhttu

I

g

--

- . . ,

,-w,

- - -

,-

, . - - -