ML20148U646
| ML20148U646 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 07/07/1997 |
| From: | NRC (Affiliation Not Assigned) |
| To: | |
| Shared Package | |
| ML20148U650 | List: |
| References | |
| NUDOCS 9707100259 | |
| Download: ML20148U646 (2) | |
Text
..
- = _.
o 3/4.9 REFUELING OPERATIONS 3/4.9.1 BORON CONCENTRATION LIMITING CONDITION FOR OPERATION l
3.9.1 With the reactor vessel head closure bolts less than fully tensioned or with the head removed, the boron concentration of all filled portions of the Reactor Coolant System and the refueling canal shall be maintained uniform and sufficient to ensure that the more restnctive of the reactivity conditions specified in the COLR is met.
i APPLICABILITY: MODE 6*.
ACTION With the requirements of the above specification not satisfed, immediately suspend all operations involving CORE ALTERATIONS or positive res@vity changes and initiate action to restore boron concentration to within COLR limits.
SURVEILLANCE REQUIREMENTS 4.9.1.1 The more restnctive of the above two reactivity conditions shall be determined prior to:
1 a.
Removing or unbotting the reactor vessel head, and b.
Withdrawal of any full 4ength CEA in excess of 3 feet from its fully inserted I
position within the reactor pressure vessel.
l 4.9.1.2 The boron concentration of the Reactor Coolant System and the refueling canal shall be determined by chemical analysis at least once per 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br />.
'The reactor shall be maintained in MODE 6 whenever fuel is in the reactor vessel with the reactor vessel head closure botts less than fully tensioned or with the head removed.
l WATERFORD - UNIT 3 3/49-1 AMENDMENT NO. 442,129
(
9707100259 970707 PDR ADOCK 05000382 P
_. ~ _. _ _ _ ~ " ~ ~
~~
REFUELING OPERATIONS 3/4. 9. 2 INSTRtMENTATION LIMITING CONDITION FOR OPERATION 3.9.2 As a sinfaum, two source ratee neutron fim monitors shall be OPERABLE and operating, each with continuous visual indication in the control room and one with audible indication in the containment and control room.
APPLICABILITY: # DE 5.
~
l SU.lE!*
a.
With one of the above required monitors inoperable er not operating, immediately suspend all operations involving CORE ALTERATIONS er positive reactivity changes.
b.
With both of the above required monitors inoperable er not operating, determine the boron concentration of the Reacter Coolant System at least once per 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br />.
1
$URVE1LLANCE REQUIREMENTS i
4.9.2 Each source range neutron fin monitor 4ha11 he &monstrated DPERABLE by performance of:
s.
A CNANNEL CHECK at least once per 22 hours2.546296e-4 days <br />0.00611 hours <br />3.637566e-5 weeks <br />8.371e-6 months <br />, b.
A CHANNEL FUNCTIONALTEST within S hours prior to the initial start of CORE ALTERATIONS, and c.
A CHANNEL FUNCTI0liAL TEST at least once per 7 days, l
e O
4 WATERFORD - 41 NIT 3 3/49-2
..m=
e or %
- w*.m
- - +.