Text
.
z...
r O
OHIO EDISON COMPANY-76 SOUTH MAIN STREET, AKRON, OHl0 44308 216 384-5918 ROBERT J. McWHORTER
- VICE PRE 51 DENT December 1, 1978 Mr. Robert Baer Chief, Light Water Reactors Branch No. 2 Division Project Management U. S. Nuclear Regulatory Commission Washington, D. C.
20555
Subject:
Ohio Edison Company, et al 4
Erie Nuclear Plant, Units 1 & 2 Docket Nos. STN50-580 & STN50-581 Company Reorganization and Leak Rate Analysis
Dear Mr. Baer:
1 In a recent telephone conversation between Mr. D. Tibbitts I
of the NRC and Mr. R. Walter of OEC, a question arose regarding the
.cesponsibilities of the Manager, Quality Assurance Department. The following is an explanation of those responsibilities. The Manager, Quality Assurance Department has assumed all the duties of the previous Chief Nuclear Quality Assurance Engineer. In addition, the Manager, Quality Assurance Department has responsibility for all non-nuclear quality assurance. These changes regarding the Ohio Edison Company reorganization will be incorporated into a future amendment to the PSAR.
In another telephone conversation.between the same parties, the NRC informed Ohio Edison that further clarification of the leak rate analysis for the main steam isolation valve is required in order for them to complete their review. The following information is being submitted to provide that clarification:
1.
The homogenous model from RELAP 1 was used to size 1
2 the 1 GPM hole at 1 582 x(10-5) ft. Sonic flow was. assumed.
I 2.
The post accident flow was calculated using the following equation from Dynamics and Thermodynamics of Compressible Fluid Flow, A. H. Shapiro,1933:
0
\\
7812050t%
i p
u
. ~.
-Mr. Robert Baer December 1, 1978 K+1 W
K / 2 TK-1 P.
II.,
R \\K+1/.
g 7
'W==
P A
.411 W.
I The equation assumes ronic flow.
3.
T u percent leak rate per day was obtained by making a plot of the post LOCA leak rates from a CONTEMPI run.- This plot leveled out at just below a peak of.14%/ day, which the plot appeared to approach asymptotically.
If you have any questions or comments on the above, please -
advise.
Very truly yours, M.\\
d u
BMM/ ROW:cyc cc: DWHayes (USNRC OIE:III)
[
RThoma(OakRidgeNationalLab)
HKohn (OPSC)
JAckerman (Ohio Dept. of Health)
PGasteier (Erie County Commissioner)
RLMustard (USEPA, Chicago)
Librarian /ThermalReactorsGroup (Brookhaven National Lab)
Atomic Industrial Forum GCharnoff-(SPPT)
EStebbins RTufts i
t
e
^ E E I P. A 11 T,,,,
SUMMIT COUNTY
)
On December 1, 1978, before me, a Notary Public in and for the State and County aforesaid, personally appeared Barry M. Miller, who after being duly sworn according to law, deposed and said that he i-Manager, Erie Nuclear Plant Project of Ohio Edison Company, an Ohic Corporation, that in such capacities he is authorized to sign official correspondence on behalf of Robert J. McWhorter, Vice President, in relation to licensing for the Erie Nuclear Plant and therefore authorized to make this Affidavit; and that the foregoing is true and correct to the best of his knowledge, information, and belief.
m N Barry M. Miller Sworn to and subscribed before me the day and year aforesaid.
(
P y
(/
Notary Public
[/
JOSLfli!TM f.1.IkELR0i fJ3IARY PUL'lE - STATE OF OH!c RESIDENT OF SiRIT C00fHY My Commicson Expires Aug.17,1982