From: Woolley R
UNITED STATES ENRICHMENT CORP. (USEC)
To: Pierson R
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
References
GDP-97-0099, GDP-97-99, NUDOCS 9707080197
Download: ML20148S345 (3)


Text

f0 - fft7/

United Stitis EnrichmInt Corporation

.f e

e*-

2 Democracy Center 6903 Rockledge Drive Bethesda, MD 20817 J

Tel: (301)S64-3200 Fax:(301) 564-3201 June 19,1997 Mr. Robert C. Pierson SERIAL: GDP 97-0099 i

Chief, Special Projects Branch Division of Fuel Cycle Safety and Safeguards, NMSS l

United States Nuclear Regulatory Commission Washington, D.C. 20555-0001 Paducah Gaseous Diffusion Plant (PGDP)

Docket No. 70-7001 Change in Commitment Due Dates The United States Enrichment Corporation (USEC) transmitted to the Nuclest Regulatory Commission (NRC) a list of open commitments to the Department of Energy (DOE) by letter GDP 97-0023, dated March 1,1997, " Compliance Plan Issue C1/XI, List of Open United States Enrichment Corporation (USEC) Commitments to the Department of Energy (DOE). The purpose of this letter is to notify the NRC of a change in the schedule for completion of some of the commitments contained in i of the referenced letter.

Issue 24 of the Plan for Achieving Compliance with NRC Regulations at the Paducah Gaseous Diffusion Plant (Compliance Plan), Rev. 3, Change A, provides the plan of action and schedule to achieve

}

compliance with 10 CFR. 76.95. These Compliance Plan activ'. ties only include the development and J

implementation of the subject training programs. Enclosure *. to letter GDP 97 023 included several commitments to perform a post-implementation NUREG 1220 assessment of the training programs, which j

is not an activity required by the Compliance Plan. The dates for co revised by this letter.

The objective of the assessment of the revised training programs is to evaluate the effectiveness of the programs. If this were done right at the time each program is scheduled to be implemented, the results

}! !

.would not be a fair assessment ofprogram effectiveness. Therefore, the required completion dates for the assessments are revised to provide time for each program to reach a steady-state mode of operation. The specific commitment as listed in Enclosure 1 to letter GDP 97-023 is provided in Enclosure 1 to this letter. to this letter includes the item number, issue title, and scheduled completion date as provided in Enclosure 1 to letter GDP 97-023, along with the revised completion date.

hhh 9707080197 970619 PDR ADOCK 07007001 C

PDR Y'~

Offices in Livermore Cahfomia Paducah. Kentucky Portsmouth. Ohio Washington, DC

... ~-

I i

i b

r l

I Mr. Roben C. Pierson June 19,1997 GDP 97-0099 Page 2 1

Ifyou have any questions, please contact Bill Sykes at 502-441-6796. There are no new commitments l

contained in this submittal, l

Sincerely, 1

i 6.O. RoMb.fg t

i Robert L. Woolley l

Nuclear Regulatory Assurance and Policy Manager

[

l i

i-CC:

NRC Region III Odice NRC Resident Inspector - PGDP NRC Resident Inspector - PORTS i

l 4

l l

l l

j l

r l-l

__~

I

)

ENCLOSURE 1 i

l REVISED COMPLETION DATES 1

i Item Number Issue Title Scheduled Completion Revised Completion Date from GDP 97-023 Date l

78 Complete NUREG 1220 June 30,1997 September 12,1997 assessment ofElectrical Maintenance Training Program 79 Complete NUREG 1220 June 30,1997 September 19,1997 assessment ofMaintenance Mechanics Training Program 80 Complete NUREG 1220 June 30,1997 September 26,1997 assessment ofInstrument and Electronic Mechanics Training Program 81 Complete NUREG 1220 June 30,1997 October 10,1997 assessment of Laboratory l

Technician Training Program 82 Complete NUREG 1220 June 30,1997 October 17,1997 Assessment ofWaste Management Operator Training Program 127 Complete NUREG 1220 December 31,1997 April 13,1998 assessment of Cascade i

Coordinator Training Program 128 Complete NUREG 1220 December 31,1997 April 6,1998 assessment ofNuclear Criticality Safety Engineer / Specialist Training Program 129 Complete NUREG 1220 December 31,1997 April 20,1998 assessment of System Engineer Training Program

.